Slide 1: Interim Results FY2023
INTERIM RESULTS FY2023 2 March 2023

Slide 2: Forward-looking and cautionary statement
FORWARD-LOOKING AND CAUTIONARY STATEMENT Certain statements contained in this presentation, other than the statements of historical fact, contain forward-looking statements regarding Implats’ operations, economic performance or financial condition, including, without limitation, those concerning the

Slide 3: Agenda
AGENDA 01 Group 02 Operational 03 Financial 04 Market 05 Business overview overview review review outlook Nico Muller Mark Munroe Meroonisha Kerber Sifiso Sibiya Nico Muller Gerhard Potgieter IMPLATS 3 INTERIM RESULTS FY2023

Slide 4: Group overview
01 GROUP OVERVIEW Nico Muller IMPLATS INTERIM RESULTS FY2023

Slide 5: Group safety overview
GROUP SAFETY OVERVIEW • Implats recorded two fatal injuries at managed operations during the period, and one at Two Rivers JV FATALITIES AND LOST-TIME INJURY FREQUENCY RATE • 15 September 22 Estevao Matsimbe Elec. Serviceman 16 Shaft Falling equipment • 16 November 22 Seutlwadi Ramathelesa Engineeri

Slide 6: Group operational overview
GROUP OPERATIONAL OVERVIEW REFINED PRODUCTION UNIT COST Description H1 FY2023 H1 FY2022 Var (%) 1 694 19 346 1 617 18 006 1 577 15 441 16 756 Tonnes Milled# kt 11 815 11 301 5% 1 470 1 476 14 292 Concentrate production 6E koz 1 616 1 616 0% R/oz koz Managed operations 6E koz 1 176 1 157 2% Impala 6E

Slide 7: Movement in concentrate production
MOVEMENT IN CONCENTRATE PRODUCTION H1 FY2023 vs H1 FY2022 169 598 128 123 147 309 142 koz 6E in conc % variance -10% -2% -5% -1% 1% 6% 15% 1 620 from H1 FY2022 1 610 19 19 6E koz in concentrate 1 600 Mill decoupling project, improved plant availability, ug production increased by 26% Eskom, flooding

Slide 8: Group business overview
GROUP BUSINESS OVERVIEW GROUP GROUPPROFITABILITY BYOPERATION PROFITABILITY BY OPERATION Description H1 FY2023 H1 FY2022 Var (%) 40 000 35 000 6E concentrate produced koz 1 616 1 616 0% 30 000 6E ounces produced (refined) koz 1 476 1 617 -9% 52% 32% 30% 28% 27% 20% 35% R/6E ounce 25 000 6E ounces sol

Slide 9: RBPlat transaction
RBPLAT TRANSACTION A compelling offer with significant strategic, operational, financial and social benefits ▪ Competition approval received in November 2022 Delivers and Secures a Strengthens sustains significant Implats’ ▪ Compliance certificate meaningful Western Limb competitive remains outstand

Slide 10: Social projects
SOCIAL PROJECTS Sustainable livelihoods in mine communities during and beyond mining EDUCATION & SKILLS ESD & INCLUSIVE COMMUNITY WELLBEING INFRASTRUCTURE DEVELOPMENT PROCUREMENT Programmes benefitted Trained and supported >50 000 people reached 49 schools and > 200 SMMEs through various programmes

Slide 11: ESG
ESG DECARBONISATION STAKEHOLDER PERCEPTIONS ▪ Implats scored 66 out of 100 (FY2021: 61 out of 100) in the ▪ Progressing renewable electricity annual DJSI assessment procurement ▪ Ranked in 89th percentile of the mining and metals industry ▪ Impala Rustenburg – pre- feasibility for 160MW solar plant

Slide 12: Operations review
02 OPERATIONS REVIEW Mark Munroe IMPLATS INTERIM RESULTS FY2023

Slide 13: Impala
13 IMPALA PRODUCTION* 670 Description H1 FY2023 H1 FY2022 Var (%) Remarks 642 626 608 koz 572 Tonnes milled kt 5 168 4 981 4% • Improved safety and lower disruption from Industrial action 6E head grade g/t 3.82 3.96 (4%) • Treatment of lower grade material FY2021 FY2022 FY2023 • Higher throughput of

Slide 14: 6E ounces stock-adjusted vs H1 FY2022
6E OUNCES STOCK-ADJUSTED VS H1 FY2022 650 1 1 1 1 640 2 Cable theft in prior year DMR stoppages in prior year 3 Industrial action in prior year Load curtailment Lower efficiencies 4 14 Lower efficiencies 630 7 Lower efficiencies Reduced board length and LHD driver industrial action DMR stoppages in

Slide 15: Sustaining operating momentum
SUSTAINING OPERATING MOMENTUM DEVELOPMENT SAFETY 7.57 7.43 102.7 10 8 92.6 94.2 6.54 84.7 86.9 85.1 82.6 7 8 5.43 5.66 5.06 5.19 4.89 6 m (000) 6 5 46.5 4 9 4 3 7 6 6 2 2 4 4 1 1 1 0 0 FY2016 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 H1 FY2023 FY2016 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 H1 FY20

Slide 16: Operations review
03 OPERATIONS REVIEW Gerhard Potgieter IMPLATS INTERIM RESULTS FY2023

Slide 17: Marula
MARULA PRODUCTION* 135 125 128 121 110 Description H1 FY2023 H1 FY2022 Var (%) Remarks koz Tonnes milled kt 1 007 1 020 (1%) • Lower sweepings and load curtailment FY2021 FY2022 FY2023 6E head grade g/t 4.40 4.56 (3%) • Lower sweepings and development tonnage COST** 14 219 14 906 6E in concentrate k

Slide 18: Zimplats
18 ZIMPLATS PRODUCTION* 300 301 Description H1 FY2023 H1 FY2022 Var (%) Remarks 291 288 koz 284 Tonnes milled kt 3 680 3 406 8% • Third Concentrator commissioned in September 2022 • Impact of development ore from Mupani, Rukodzi closed in 6E head grade g/t 3.38 3.42 (1%) FY2022 FY2021 FY2022 FY2023

Slide 19: Impala Canada
IMPALA CANADA PRODUCTION* 142 Description H1 FY2023 H1 FY2022 Var (%) Remarks 133 127 126 koz 123 Tonnes milled Kt 1 960 1 894 3% • Improved operating environment, plant de-coupling FY2021 FY2022 FY2023 3E head grade g/t 2.79 2.58 8% • Higher underground production COST** 1 381 1 161 1 224 1 033 1 0

Slide 20: IRS
IRS MINE-TO-MARKET RECEIPTS* H1 FY2023 747 Description H1 FY2022 Var (%) Remarks 717 696 684 koz 632 Receipts 6Ekoz 853 905 (6%) FY2021 FY2022 FY2023 Mine-to-market 6Ekoz 684 717 (5%) • Deferred deliveries from Zimplats in prior period THIRD PARTY RECEIPTS* 3rd Party 6Ekoz 169 188 (10%) • Eskom and

Slide 21: Two Rivers
TWO RIVERS PRODUCTION* 155 Description H1 FY2023 H1 FY2022 Var (%) Remarks 150 150 koz 147 147 Tonnes milled kt 1 813 1 674 8% • Expanded processing capacity • Processed lower grade stockpile to mitigate impact of DMR FY2021 FY2022 FY2023 6E head grade g/t 3.02 3.20 (6%) safety stoppages COST** 13 6

Slide 22: Mimosa
MIMOSA PRODUCTION* 132 Description H1 FY2023 H1 FY2022 Var (%) Remarks 129 124 123 koz 122 Tonnes milled kt 1 375 1 416 (3%) • Metallurgical test work, limited milling rates FY2021 FY2022 FY2023 6E head grade g/t 3.78 3.85 (2%) • Mining from lower grade areas COST** 969 1 033 798 868 863 6E in conce

Slide 23: Financial review
04 FINANCIAL REVIEW Meroonisha Kerber IMPLATS INTERIM RESULTS FY2023

Slide 24: Financial performance
FINANCIAL PERFORMANCE production 1.48Moz 6E 1.52Moz 6E R38 117 / 6E oz Revenue Refined Ounces basket H1 FY2022: H1 FY2022: H1 FY2022: sold 1.62Moz 6E 1.55Moz 6E R36 230 / 6E oz -9% --2% -9% -9% 5% R57.8bn R24.5bn R19 346 / 6E oz Unit costs revenue EBITDA H1 FY2022: Gross H1 FY2022: H1 FY2022: R55.6b

Slide 25: Income statement
INCOME STATEMENT H1 H1 VARIANCE R MILLION • Revenue increased by R2.2bn or 4% to R57.8bn FY2023 FY2022 (%) • 10% decline on lower dollar metal prices -R5.7bn Revenue 57 797 55 620 4% • 1% lower sales volumes -R0.4bn Cost of sales (40 603) (37 675) -8% • Fair value movements +R0.5bn Cash costs (22 81

Slide 26: Stock adjusted unit costs
STOCK ADJUSTED UNIT COSTS 19 346 • Stock adjusted unit costs up 15% to R19 346/oz 6E 229 236 287 • Overall Implats mining inflation of 9.0% 1 430 145 • SA operations +8.6% • Zimplats US$ +10.8% • Impala Canada C$ +9.3% • Impact of weaker ZAR on translation of foreign subsidiaries’ 553 R / 6E oz cash

Slide 27: Cash flow and liquidity
2 7 CASH FLOW AND LIQUIDITY • Free cash flow generated of R11.0bn (H1 FY2022: R15.1bn) NET CASH H1 FY2023 • Capital expenditure of R4.8bn was 40% higher due to: 1 383 45 14 486 • Accelerated spend at Zimplats’ smelter, third concentrator and Mupani projects 300 • Impala on the 12 Shaft project, furn

Slide 28: Capital allocation
CAPITAL ALLOCATION CASH FROM OPERATIONS OF R17.7bn BALANCE SHEET STRENGTH OTHER NET INCOME R1.4bn inflow • R27bn gross cash R5.9bn • R15.5bn RBPlat acquisition provision INTEREST PAID R0.2bn outflow 50% • R3.6bn dividend payment • R8bn liquidity TAXES PAID R3.0bn outflow RETURNS TO SHAREHOLDERS CAPE

Slide 29: Market review
05 MARKET REVIEW IMPLATS INTERIM RESULTS FY2023

Slide 30: Achieved group metal price performance
ACHIEVED GROUP METAL PRICE PERFORMANCE IMPALA BASKET PRICE PLATINUM PRICE Description H1 FY2023 H1 FY2022 Var (%) 60 000 4 000 1 400 3 500 50 000 1 200 Platinum 927 1 022 -9% 3 000 (US$/oz) 40 000 2 500 1 000 R/6E oz US$/oz US$/oz 30 000 2 000 1 500 800 20 000 Palladium (US$/oz) 2 009 2 200 -9% 1 00

Slide 31: PGM revenue baskets H1 FY2023
PGM REVENUE BASKETS H1 FY2023 REVENUE CONTRIBUTION BY METAL -2% 1% 2% 5% 3% 8% 15% -4%4% 9% 20% 4% 20% 24% TWO IMPALA MARULA RIVERS IMPLATS Revenue of Revenue of Revenue of Revenue of R23.1bn 46% 34% 25% 35% 40% R4.5bn 52% R4.8bn R57.8bn 24% 32% -2% 9% 7% 7% 3% 9% 20% -10% 23% 20% 5% 10% IMPALA ZIMP

Slide 32: Supply and demand balances
SUPPLY AND DEMAND BALANCES SUPPLY/DEMAND BALANCES* 2023 PLATINUM MARKET to tighten 1 200 - Demand expected to increase by 4% • LDV and HDD production recovery and higher switching 1 000 • China reopening and India to support jewellery on softer US and Europe • Diversified industrial demand remains e

Slide 33: PGM market outlook
PGM MARKET OUTLOOK PRIMARY AND MACRO OUTLOOK PLATINUM PRICING PALLADIUM AND GLOBAL MARKET SECONDARY RHODIUM DEMAND TRENDS SUPPLY Pt Pd Rh Operational China reopening Near-term platinum Resilient medium- Continually assess impact headwinds creates demand pricing dictated by term demand and of global

Slide 34: Business outlook
06 BUSINESS OUTLOOK Nico Muller IMPLATS INTERIM RESULTS FY2023

Slide 35: Group outlook
GROUP OUTLOOK Actual GUIDANCE NEW GUIDANCE Business area Unit FY2022 FY2023 FY2023 REFINED PRODUCTION: 6E koz 3 087 3 000 - 3 150 3 000 - 3 150 CONCENTRATE PRODUCTION: 3 171 3 100 – 3 300 3 100 – 3 300 Impala 6E koz 1 174 1 175 – 1 275 1 175 – 1 275 Zimplats 6E koz 589 620 – 650 620 – 650 Two Rivers

Slide 36: Appendix
07 APPENDIX IMPLATS INTERIM RESULTS FY2023

Slide 37: Environmental performance
ENVIRONMENTAL PERFORMANCE ESG INDICATORS H1 FY2023 H1 FY2022 Var (%) Remarks Level 4 or 5 environmental incidents Count 0 0 - • No major or severe impact incidents • Limited impact incidents related to: ‒ Water release from Marula emergency water storage dam Level 3 environmental incidents Count 4 2

Slide 38: Eskom power curtailment
ESKOM POWER CURTAILMENT Significant impact on the business Strategic longer-term responses • Compromises the safety of employees • Working closely with industry / government • Impacts mining and processing output • Investment in supplementary green power • Affects efficiencies • Expanded processing

Slide 39: Interim Results FY2023
INTERIM RESULTS FY2023 2 March 2023
Source: company website
More decks from Impala Platinum Holdings Limited
FY2026 Earnings Presentation30 slides · Sep 3, 2026
Technical Presentation (March 2026)34 slides · Mar 25, 2026
H1 FY2026 Earnings Presentation34 slides · Mar 5, 2026
FY2025 Earnings Presentation40 slides · Aug 28, 2025
H1 FY2025 Earnings Presentation40 slides · Feb 27, 2025
Fact Sheet (February 2025)8 slides · February 2025