Impala Platinum Holdings Limited · JSE:IMP
Impala Platinum — Technical Presentation (March 2026)
34 slides from Impala Platinum's technical presentation, Mar 25, 2026

Slide 1: Implats / BofA Site Visit
IMPLATS / BOFA SITE VISIT 25/26 March 2026 IMPLATS 1 MARCH 2026 SITE VISIT

Slide 2: Forward-looking and cautionary statement
FORWARD-LOOKING AND CAUTIONARY STATEMENT Certain statements contained in this presentation, other than statements of historical fact, contain forward-looking statements within the meaning of applicable securities laws. Forward looking statements include, but are not limited to statements regarding I

Slide 3: Integrated, global PGM producer
INTEGRATED, GLOBAL PGM PRODUCER Implats’ diversified, world-class asset base spans key PGM bearing regions across the globe OWNERSHIP We mine, process, refine and market LAC DES ILES 100% WATERBERG 15% high-quality metal products ― Platinum Group Metals Ltd, 85% JOGMEC, Hanwa safely, efficiently and

Slide 4: Impala Rustenburg
IMPALA RUSTENBURG Moses Motlhageng, Chief Executive Impala Rustenburg IMPLATS 4 MARCH 2026 SITE VISIT

Slide 5: Impala's operations
IMPALA’S OPERATIONS We are focused on securing lower-cost, sustainable mining and processing operations M&I RESOURCES* P&P RESERVES* PROCESSING 143.5 Moz 6E 24.0 Moz 6E Maseve NORTH CY2025: SHAFTS Styldrift 91koz 6E MINED PRODUCTION# REFINED PRODUCTION# CY2025: 1.76 Moz 6E 2.75 Moz 6E 494koz 6E REFI

Slide 6: South Africa underpins primary PGM supply
SOUTH AFRICA UNDERPINS PRIMARY PGM SUPPLY Western Limb supply has sustained global PGM markets for over 50 years The Northern Limb The North-Eastern Limb The Western Limb 1% 2% 6% 11% 13% • 7% of global PGM supply 3% 1% 3% 3% • c.2 925 direct employees 1% 39% 8% 8% 41% 51% 47% 38% 25% • 3% of global

Slide 7: Our operating context
OUR OPERATING CONTEXT Balancing diverse stakeholder needs within South Africa’s unique operating context SHAREHOLDERS EMPLOYEES UNIONS COMMUNITIES GOVERNMENT REGULATORS CUSTOMERS OUR PRIORITIES Partner with host Operate safely, Foster a supportive, communities amid Engage proactively with Allocate c

Slide 8: Operational strategy
OPERATIONAL STRATEGY Deliver a safer, lower-cost and more sustainable business OPERATIONAL PORTFOLIO INFRASTRUCTURE LIFE-OF-MINE ENGAGED STAKEHOLDERS EXCELLENCE REVIEW EXTENSIONS EMPLOYEES Build a resilient, Proactively reshape Maintain and Sustain and extend Create a workplace Strengthen sustainabl

Slide 9: Our ESG framework
OUR ESG FRAMEWORK Our purpose is to create a better future – we respect, care and deliver ENVIRONMENT SOCIAL GOVERNANCE LIMITING SUSTAINING LIVELIHOODS ETHICAL, OUR IMPACT AND RELATIONSHIPS TRANSPARENT, BEYOND MINING ACCOUNTABLE • Climate change • Health and safety • Corporate governance • Energy •

Slide 10: Consistent improvement in safety performance
CONSISTENT IMPROVEMENT IN SAFETY PERFORMANCE We are committed to ensuring every colleague returns home safely, every day 16 14.53 TIFR 14 13.14 12.81 Disciplined Rigorous risk Culture of leadership management care 12 11.38 10.91 10.63 10.01 10.00 10 9.10 8.29 FOCUS AREAS 8 6.90 LTIFR 6.16 • Driving

Slide 11: Our portfolio approach
OUR PORTFOLIO APPROACH Operating model differentiation to match strengths, weaknesses, opportunities and threats GROWTH SHAFTS STEADY-STATE SHAFTS SHORT-LIFE SHAFTS PROCESSING • 16 Shaft • 20 Shaft • Styldrift • • Re-mining • Concentrators (UG2, • 12 Shaft • 14 Shaft • 10 Shaft • 1 Shaft • 6 Shaft •

Slide 12: Enabling sustainable production
ENABLING SUSTAINABLE PRODUCTION Sufficient ‘factory floor’ to deliver sustainable, stable medium-term production MINING FLEXIBILITY MINING MIX MILLED GRADE MINEABLE FACE LENGTH, km +25% TONNES MILLED, Kt MILLED GRADE, 6Eg/t 35.0 20 000 4.40 1 30.0 17 500 4.20 0.9 25.0 15 000 4.00 Underground Reminin

Slide 13: Delivering the Styldrift ramp up
DELIVERING THE STYLDRIFT RAMP UP Leadership change and revised strategic focus delivering on inherent potential MINING FLEXIBILITY MONTHLY WEIGHLINE TONNES, kt LTIFR, pmmhw 250 4 6 months LTI free in H126 • Expand the available ledged footprint • Improving IMS section compliance to the mining 200 3

Slide 14: Costs
COSTS Sustained improvement in relative cost positioning – with structural levers to drive further gains CASH OPERATING COST, R/oz 6E PGM Premium (Discount) to weighted SA average, R/oz 6E PGM 30 000 30% 25% 25 000 20% 20 000 15% 15 000 10% 5% 10 000 0% 5 000 -5% 0 -10% 1H 2H 1H 2H 1H 2H 1H 2H 1H 2H

Slide 15: Costs
COSTS Well-capitalised assets, mining mix and processing differential to drive competitive cost positioning FY2025 AISC, R/oz 6E PGM* 40 000 BRPM South & Central Styldrift 35 000 30 000 25 000 20 000 15 000 10 000 5 000 - 0.0 2.0 4.0 6.0 8.0 10.0 Cumulative 6E PGM production, Moz IMPLATS *Producer s

Slide 16: Step change in reserve optionality
STEP CHANGE IN RESERVE OPTIONALITY Reduced operating depth, higher grade, increased mining width and step-change in mechanisation IMPALA RUSTENBURG SHAFT RESERVES AND DEPTH RESERVES AND RESOURCES, 6E Moz RESERVES, 6E oz PGM VS DEPTH, m 160 16 000 4 000 144Moz 6E 140 resources 14 000 3 500 120 12 000

Slide 17: Unlocking LOM through integration
UNLOCKING LOM THROUGH INTEGRATION Key strategic underpin and source of material synergies on higher baseload of sustainable production IMPALA RUSTENBURG IMPALA BAFOKENG PRE-INTEGRATION – 30 YR LOM TONNAGE PROFILE PRE-INTEGRATION – 30 YR LOM TONNAGE PROFILE 18 18 FY2025 stated LoM: 6 Shaft FY2025 sta

Slide 18: Unlocking LOM through integration
UNLOCKING LOM THROUGH INTEGRATION Suite of low capital-intensity LoM extensions and replacement options being progressed IMPALA RUSTENBURG • 14# LoM I − +4 years LoM extension POST-INTEGRATION – 30 YR LOM TONNAGE PROFILE − MER extension into 18# • BRPM N# LoM II 6 Shaft 18 EF Shaft 1 Shaft − +10 yea

Slide 19: Group Processing
GROUP PROCESSING Adelle Coetzee – Executive: Metallurgy

Slide 20: Introduction
INTRODUCTION Delivering a competitive advantage through beneficiation • Asset diversification • Process capacity and flexibility • Operational excellence IMPLATS’ METALLURGICAL PORTFOLIO 14 metallurgical complexes across three countries and two continents • 11 concentrator complexes – South Africa,

Slide 21: Safety and environmental management
SAFETY AND ENVIRONMENTAL MANAGEMENT We are committed to ensuring every colleague returns home safely, every day SAFETY MANAGEMENT FATALITY FREE* • Emphasis on high-risk work and critical controls CONCENTRATING SMELTING REFINING • Continue to strengthen our safety maturity and culture • Embedding les

Slide 22: Our people
OUR PEOPLE Depth and diversity in skills and experience provides firm foundation ~7 200 EMPLOYEES* Impala Rustenburg + 3 680 Impala Refineries + 1 870 Zimplats + 1 240 Female** 27% Marula + 180 Impala Canada + 180 Male** 73% SKILLS DEVELOPMENT • Several PhD and Masters degrees • ~ 200 metallurgical/

Slide 23: 2021: Strategic beneficiation
2021: STRATEGIC BENEFICIATION Delivering a competitive advantage through beneficiation Debottleneck capacity constraints caused by a changing mining profile and mineralogy IDENTIFIED EXECUTED CONSTRAINTS PROJECTS Smelting Zimplats’ 38MW furnace - January 2025 Base metal refining Impala BMR capacity

Slide 24: Implats' beneficiation value chain - overview
IMPLATS’ BENEFICIATION VALUE CHAIN - OVERVIEW Capacity capability provides flexibility Milling rate Smelting rate Base metal refining rate Precious metal refining rate Impala ~ 22 Mtpa Impala Smelter ~ 950 Ktpa Impala BMR: Impala PMR: South Africa Marula ~ 2.0 Mtpa Nickel ~ 18 Ktpa TRP M PGE ~ 4.5 M

Slide 25: Tailings beneficiation
TAILINGS BENEFICIATION Tailings beneficiation provides source of low-cost ounces and enhances environmental performance Tails CURRENT ARISINGS TAILINGS TAILINGS STORAGE FACILITIES Tailings scavenging Re-mining of tailings Chrome beneficiation plants dams plants High-energy flotation • Impala Tailing

Slide 26: World-class tailings storage facilities
WORLD-CLASS TAILINGS STORAGE FACILITIES Safe and robust facilities conform to regulatory requirements and meet industry best practices 12 active dams 6 dormant dams size 3 099 Ha Spigot deposition 1 re-mining & cyclone method EXTERNAL REVIEWS COMPLIANCE Quality assurances Local regulations and indus

Slide 27: Re-mining – Impala tailings dams 1 & 2
RE-MINING – IMPALA TAILINGS DAMS 1 & 2 Source of low-cost, low-risk PGM ounces at Impala to FY2034 PURPOSE • Reduce tailings footprint • Financial return PROJECT STATUS • Capital spent R240 million • Hydro mining commenced in FY2019 • 35 Mt tonnes still available • PGM grade >0.7 g/t 6E • c.165 koz

Slide 28: Chrome ore beneficiation
CHROME ORE BENEFICIATION Expected to deliver > 1 Mtpa chromite concentrate production by 2028 IMPALA MARULA TWO RIVERS GROUP Current: Current: Current: Current: • 2 chrome plants • 1 chrome plant • 1 chrome plant • 700 Ktpa • c.355 Ktpa • c.180 Ktpa • c.165 Ktpa Growth: Growth: Growth: • North chrom

Slide 29: Strategic outlook
STRATEGIC OUTLOOK Leveraging our competitive advantage through our assets, people and strategy IMPALA IMPALA SMELTER BMR and PMR CONCENTRATING Optimisation Maintenance Optimisation Consolidated Impala Re-design – ‘ furnace of Optimise current capacity Rustenburg: the future’ Concentrator feed optimi

Slide 30: Impala concentrator strategy
IMPALA CONCENTRATOR STRATEGY Consolidated management and optimisation of installed capacity to unlock envisaged synergies Consolidated Impala Rustenburg: • Ore movement strategy • Feed strategy • Excess capacity utilisation Merensky ore UG2 ore Tailings Maseve BRPM Central UG2 IMPLATS 30 MARCH 2026

Slide 31: Smelting strategy
SMELTING STRATEGY Industry-leading smelter maintenance protocols and operational strategies to leverage installed capacity IMPALA SMELTERS ZIMPLATS SMELTER Feed Operational excellence Optimise feed blend for Optimise new 38MW sustainable operation furnace Operation Feed Maintenance approach and Posi

Slide 32: Refining
REFINING Responding timeously and cost-effectively to anticipated capacity constraints through investment • A 10% increase in base metal refining capacity was commissioned in early FY2026 • Record production levels were achieved in H1 FY2026 • BMR at capacity in medium-term: − 50% Impala North − Two

Slide 33: Conclusion
CONCLUSION • Implats has a world-class portfolio of processing assets in three different countries • The diversification of the Group’s concentrating, smelting and refining assets creates processing flexibility. IMPLATS 33 MARCH 2026 SITE VISIT

Slide 34: Questions?
QUESTIONS? Johan Theron, Group Executive: Corporate Affairs IMPLATS 34 MARCH 2026 SITE VISIT
Source: company website
More decks from Impala Platinum Holdings Limited
FY2026 Earnings Presentation30 slides · Sep 3, 2026
H1 FY2026 Earnings Presentation34 slides · Mar 5, 2026
FY2025 Earnings Presentation40 slides · Aug 28, 2025
H1 FY2025 Earnings Presentation40 slides · Feb 27, 2025
Fact Sheet (February 2025)8 slides · February 2025
Fact Sheet (February 2025)8 slides · February 2025