  1. Slide 1: Bear Lodge Rare Earth Project Overview

    Bear Lodge Rare Earth Project Project Overview Crook County Commissioners Sundance, Wyoming Meeting | August 3, 2026 1

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation This presentation contains forward-looking statements and forward-looking information (collectively, the “forward-looking statements”) within the meaning of securities legislation in the United States and Canada. Except for statements of historical fact, certain informat

  3. Slide 3: Why We Are Here

    WHY WE ARE HERE RER is committed to a thorough, transparent permitting process—federal NEPA, State of Wyoming licensing, and local requirements. These processes invite stakeholder input as design, impacts, alternatives, and mitigation are evaluated. We know stakeholders have questions and encourage

  4. Slide 4: Why Rare Earths Matter — Sundance vs. China

    WHY RARE EARTHS MATTER — SUNDANCE VS. CHINA Defense Precision munitions, radars, jet engines, satellites, and advanced systems rely on rare earth permanent magnets. Advanced Energy High-performance motors for vehicles and direct-drive generators in modern power systems. High Tech Smartphones, hard d

  5. Slide 5: Rare Earth Element (REE) Supply Chain

    RARE EARTH ELEMENT (REE) SUPPLY CHAIN • RER’s Bear Lodge Project targets the upstream half of the domestic rare earth market, from mine to separated rare earth oxides (NdPr Oxide). 5

  6. Slide 6: Bear Lodge Project Snapshot: Facts at a Glance

    BEAR LODGE PROJECT SNAPSHOT: FACTS AT A GLANCE 132 acre 287 acres ~22 2030 total est. new NFS Years (construction Target start after all pit on NFS land disturbance through reclamation) permits and licensing What the project is: What the project is not: • Open-pit rare earth mine at Bull Hill, ~12 •

  7. Slide 7: Mineral Deposit & Company

    MINERAL DEPOSIT & COMPANY • The Bear Lodge deposit is a USGS recognized world-class mineral deposit that has some of the highest total rare earth oxide (TREO) concentration in the world. • Measured resource concentration is 4.53% TREO or 45,300 ppm…more than 11X more concentrated than other comparab

  8. Slide 8: Bear Lodge Project: Bull Hill Plan Summary

    BEAR LODGE PROJECT: BULL HILL PLAN SUMMARY Main Project Features: • Open-pit mine • Dewatering into a pond • Haul road and mine access road • Ancillary facilities - guardhouse, substation, topsoil stockpile, fencing • Transmission line • Barren rock facility • PUG mill, truck shop, and office • Sedi

  9. Slide 9: Bear Lodge Project: Bull Hill Site Layout

    BEAR LODGE PROJECT: BULL HILL SITE LAYOUT 9

  10. Slide 10: Transparency: Permitting Dashboard Online

    TRANSPARENCY: PERMITTING DASHBOARD ONLINE https://www.permits.performance.gov/permitting -project/fast-41-covered-projects/bear-lodge- rare-earth-project 10

  11. Slide 11: Key Federal Authorizations

    KEY FEDERAL AUTHORIZATIONS Agency Authorization / Action Purpose / Notes NEPA Environmental Impact Full environmental review of the U.S. Forest Service (USFS) Statement (EIS) + Record of proposed action on National — Lead Agency Decision Forest System lands Approval of final Mine Plan of Includes re

  12. Slide 12: Key State Authorizations

    KEY STATE AUTHORIZATIONS Agency / Program Authorization / License Purpose / Notes WDEQ – Land Quality Mining and reclamation on both Permit to Mine Division (LQD) NFS and private land portions Dust, PM10/PM2.5, and other WDEQ – Air Quality Air Quality Permit (construction & emissions; includes monit

  13. Slide 13: Other Important Approvals

    OTHER IMPORTANT APPROVALS • Mine Safety and Health Administration (MSHA) – Mine safety plan and ongoing compliance • Crook County / road authorities – Road use, maintenance, and any county road-related agreements or permits • Powder River Energy Corporation (PRECorp) + USFS – Power line design, ease

  14. Slide 14: Preliminary Economic Snapshot

    PRELIMINARY ECONOMIC SNAPSHOT $175–$250M 150–225 80–110 $5–$10M Development Avg Construction Direct Operating Mineral Tax Range / Capital Jobs Jobs yr Mine, upgrading, 225–325 at peak $7–$9M annual payroll 4,000-tpa case roads, power, water (2-year build) 17-yr mine life $3.0–$5.9M / yr $3.5–$10M $5

  15. Slide 15: Why Miller Creek Access Road Is in the Draft MPO

    WHY MILLER CREEK ACCES RD IS IN THE DRAFT MPO — AND WHY THIS IS NOT FINAL The Draft MPO lists Miller Creek Access because that is the route the U.S. Forest Service selected and carried into the 2016 Draft EIS after reviewing the 2011 and 2012 third-party road engineering studies. That process never

  16. Slide 16: Air Quality, Dust & Naturally Occurring Materials (NORM)

    AIR QUALITY, DUST & NATURALLY OCCURRING MATERIALS (NORM) Background Monitoring Dust & Material Controls: Underway For Many Years: • Regular road watering and speed limits (30 mph on access roads) • One meteorological station and four high- volume air-sampling stations installed at • Covered ore and

  17. Slide 17: Water Quality, Usage, Treatment & the Pit Lake

    WATER QUALITY, USAGE, TREATMENT & THE PIT LAKE Long-term monitoring Discharge & treatment Any discharge is subject to a WYPDES Baseline hydrology work began in 2010. permit with strict water-quality limits. Current program includes continuous Dewatering water may be evaporated, surface-water station

  18. Slide 18: Reclamation, Closure & Long-Term Responsibility

    RECLAMATION, CLOSURE & LONG-TERM RESPONSIBILITY A detailed Reclamation Plan, cost estimate, and adequate financial assurance (bonding) must be approved by the State of WY before the final Mine Plan of Operations is authorized. 1 Progressive work 2 What remains 3 Timeline & oversight Reclamation occu

  19. Slide 19: The Review Process — Transparency & Your Voice

    THE REVIEW PROCESS — TRANSPARENCY & YOUR VOICE FAST-41 does not lower standards or eliminate review. It does not include any short cuts to NEPA requirements. It organizes agency coordination, creates a public permitting timetable, and improves transparency. It does not eliminate NEPA requirements, e

  20. Slide 20: The Draft MPO Is a Starting Point, Not the Final Decision

    THE DRAFT MPO IS A STARTING POINT NOT THE FINAL DECISION The Draft Mine Plan of Operations submitted July 29 is a living, evolving starting point for the NEPA process — not a final decision. NEPA is just starting The process started with the MPO submittal on July 29. It still must go through: Draft

  21. Slide 21: Process Just Commenced: Stakeholders Have a Voice

    PROCESS JUST COMMENCED STAKEHOLDERS HAVE A VOICE Cooperating Agencies You Are Not Late • Crook County and the Conservation • The NEPA process formally began District are cooperating agencies in with the MPO submittal on July 29, the NEPA process. last week. This is the beginning, not the end. • That

  22. Slide 22: Key Takeaways

    KEY TAKEAWAYS Defined, limited footprint — 287-acre impact to public lands with reclamation and mitigation measures required. Mechanical (crushing & screening of rock) upgrading only at the mine; chemical processing / separation is off-site near Upton. The final access route has not been decided, al

  23. Slide 23: Questions

    QUESTIONS We are here to listen and provide factual answers. Rare Element Resources, Inc. Kelli Kast, Senior Vice President, General Counsel, & Chief Admin Officer Paul Bonifas, Director of Business Development Cameo Flood, NEPA Coordinator WSP, Engineering Firm 23