Auris Minerals Ltd. · ASX:AUR

Auris Minerals — Resource and Investment NL — Shareholder Meeting (November 2013)

19 slides from Auris Minerals's shareholder meeting presentation, November 2013

  1. Slide 1: An Emerging Western Australian Miner

    Slide 1: An Emerging Western Australian Miner

    An Emerging Western Australian Miner With a dominant copper-gold exploration portfolio Resource and Investment NL ASX: RNI November 2013 AGM Presentation 1

  2. Slide 2: Corporate Snapshot

    Slide 2: Corporate Snapshot

    Corporate Snapshot Chairman: Capital Structure Miles Kennedy Share Price1 A cents 5.3 • 28 years’ corporate experience. Former Chairman of Sandfire Resources, Macraes Mining and Kimberley Shares on Issue2 M 298.5 Diamond Co Market Cap A$m 15.8 Technical Director: Cash A$m 3 Albert Thamm Debt3 A$m 13

  3. Slide 3: Project Overview

    Slide 3: Project Overview

    Project Overview • NEAR-TERM PRODUCTION PATHWAY: RNI is pursuing a low-cost and near-term production pathway for the Grosvenor and Peak Hill gold projects, which have combined resources of ~2Moz • STRATEGIC INFRASTRCTURE: 100% ownership of the 1Mtpa Grosvenor gold processing plant and supporting inf

  4. Slide 4: Current Gold Inventory

    Slide 4: Current Gold Inventory

    Current Gold Inventory • 100% owned Grosvenor Project includes JORC compliant gold resources of ~1.4Moz • Option to acquire the historic Peak Hill gold project (~550Koz) from Montezuma1 • Total resource inventory = ~2Moz • Significant scope for additional near-mine gold resources in proven mineralis

  5. Slide 5: Near-Term Gold Production Pathway

    Slide 5: Near-Term Gold Production Pathway

    Near-Term Gold Production Pathway • Updated feasibility studies completed in November 2013 using a range of independent consultants • Feasibility studies confirm low-cost and near-term gold production pathway for Grosvenor and Peak Hill projects • Studies confirm robust and sustainable returns 5

  6. Slide 6: Feasibility Studies – Key Outcomes

    Slide 6: Feasibility Studies – Key Outcomes

    Feasibility Studies – Key Outcomes • Gold production of ~850Koz over 8 years • Multiple processing options including conventional CIL through Grosvenor gold plant and heap leach processing of lower- grade material • Includes resources from Grosvenor and Peak Hill 6

  7. Slide 7: Feasibility Studies – Financial Model

    Slide 7: Feasibility Studies – Financial Model

    Feasibility Studies – Financial Model • Weighted average cash costs of ~$A990/oz over life of mine • Life of mine revenues of $1.1 billion using $A1,400 gold price • Net Present Value (pre-tax) of $149m • 2-year payback on pre-production capex of $40.5m • 82% internal rate of return 7

  8. Slide 8: Feasibility Studies – Mining Plan

    Slide 8: Feasibility Studies – Mining Plan

    Feasibility Studies – Mining Plan 8

  9. Slide 9: Grosvenor Gold Plant

    Slide 9: Grosvenor Gold Plant

    Grosvenor Gold Plant • 1Mtpa nameplate Grosvenor CIL gold processing plant • Low completion capex - ~$3.5m required to restart • Permitting processes well advanced • Supporting infrastructure in place • Potential to increase production capacity • Strategically located in historic but expanding gold

  10. Slide 10: Exploration Upside – Dominant Holding

    Slide 10: Exploration Upside – Dominant Holding

    Exploration Upside – Dominant Holding • Dominant 1,800km2 holding in the Bryah Basin, one of Western Australia’s exploration hot- spots • Favourable geological setting – prospective for gold and base metal discoveries. Includes ~80km strike of Narracoota Volcanics – host rocks for the DeGrussa coppe

  11. Slide 11: Exploration Upside – Key Objectives

    Slide 11: Exploration Upside – Key Objectives

    Exploration Upside – Key Objectives • Ongoing review of historical database generates fresh pipeline of priority exploration targets – significant upside Key exploration objectives include: • Discovery of high-value gold deposits:  Minimum target size: 100,000oz @ >3g/t Au  Fast-track into product

  12. Slide 12: Exploration Upside – Grosvenor Project

    Slide 12: Exploration Upside – Grosvenor Project

    Exploration Upside – Grosvenor Project • Priority gold exploration area – potential remains to develop into a major gold camp • Close to existing mine infrastructure – opportunities on granted Mining Leases • Key targets include:  Forrest Gimp  Eastern Jasperoids  Yarlarweelor South  Erics  Che

  13. Slide 13: Exploration Upside – Grosvenor Project

    Slide 13: Exploration Upside – Grosvenor Project

    Exploration Upside– Grosvenor Project FORREST GIMP • High-priority gold target • Wide oxide gold intercepts returned in RAB drilling over 150m strike • 12km south of Grosvenor gold plant • Open down-plunge and along the strike trend to north and south • Design of Pre-Feasibility study underway Resul

  14. Slide 14: Exploration Upside – Cashmans Project

    Slide 14: Exploration Upside – Cashmans Project

    Exploration Upside– Cashmans Project • Priority copper-gold exploration area; Targeting VMS and structural replacement-style deposits • Orient Prospect has highlighted a major VMS mineralised trend (~20km strike) • Other key targets include: Newport, Clancy’s, Seaview, Left Bank, Telegraph • Focus o

  15. Slide 15: Exploration Upside – Morck's Well Project

    Slide 15: Exploration Upside – Morck's Well Project

    Exploration Upside – Morck’s Well Project • Priority copper-gold exploration area adjoining Sandfire Resources’ flagship Doolgunna project; Targeting VMS and structural replacement-style deposits • 40km strike of prospective Narracoota Formation and regionally significant structures • Focus on colle

  16. Slide 16: Exploration Upside – Morck's Well Project

    Slide 16: Exploration Upside – Morck's Well Project

    Exploration Upside– Morck’s Well Project Collection of High Quality Regional Data Sets VTEM Channel 47 (late-time) + Anomalies AIRBORNE ELECTROMAGNETIC SURVEY REVIEW • Review focussed on identifying discrete, late-time VTEM anomalies only i.e. those most likely associated with strongly conductive ta

  17. Slide 17: Summary

    Slide 17: Summary

    Summary • Near-term gold production pathway for Grosvenor and Peak Hill projects – 850koz over 8 years • Robust independent financial model – weighted average cash costs of $A990/oz; pre-tax NPV of $149m; life of mine revenues of $1.1 billion (@ $A1,400 gold price); 2-year payback on pre-production

  18. Slide 18: Competent Person's Statement

    Slide 18: Competent Person's Statement

    RESOURCE AND INVESTMENT NL ABN 77 085 806 284 34 BAGOT ROAD SUBIACO WESTERN AUSTRALIA 6008 PO BOX 298 WEST PERTH WESTERN AUSTRALIA 6872 TEL (+61 8) 9489 9200 FAX (+61 8) 9489 9201 EMAIL general@rninl.com.au WEBSITE www.rninl.com.au Competent Person’s Statement The information released in this presen

  19. Slide 19: Appendix 1 - Grosvenor Project Resources - JORC 2004

    Slide 19: Appendix 1 - Grosvenor Project Resources - JORC 2004

    RESOURCE AND INVESTMENT NL ABN 77 085 806 284 34 BAGOT ROAD SUBIACO WESTERN AUSTRALIA 6008 PO BOX 298 WEST PERTH WESTERN AUSTRALIA 6872 TEL (+61 8) 9489 9200 FAX (+61 8) 9489 9201 EMAIL general@rninl.com.au WEBSITE www.rninl.com.au Appendix 1 - Grosvenor Project Resources - JORC 2004 Summary of Proj

Source: Internet Archive copy of aurisminerals.com.au

More decks from Auris Minerals Ltd.

All 19 Auris Minerals decks