Auris Minerals Ltd. · ASX:AUR

Auris Minerals — Investor Presentation (July 2019)

16 slides from Auris Minerals's investor presentation, Jul 10, 2019

  1. Slide 1: Focused on Making the Bryah Basin's Next Discovery

    For personal use only FOCUSED ON MAKING THE BRYAH BASIN’S NEXT DISCOVERY CORPORATE UPDATE – JULY 2019

  2. Slide 2: Competent Person's Statement & Disclaimer

    COMPETENT PERSON’S STATEMENT & DISCLAIMER Information in this announcement that relates to exploration results is based on and fairly represents information and supporting documentation prepared and compiled by Matthew Svensson who is a For personal use only Member of the Australian Institute of Geo

  3. Slide 3: Corporate Snapshot

    CORPORATE SNAPSHOT For personal use only Board and Management Capital Structure Share Price (as at July 2019) 1.5c Neville Bassett Non-Exec Chairman Shares on issue 408m Rob Martin Non-Exec Director Market Capitalisation (as at July 2019) ~$6m Brian Thomas Non-Exec Director Cash & Liquid Investments

  4. Slide 4: Company Overview

    COMPANY OVERVIEW “… the Bryah Basin is the most prospective, high grade copper belt in Australia…” For personal use only - Sandfire Resources NL (ASX: SFR) Annual Report 2018  Auris Minerals holds some of the most prospective ground for both volcanic-hosted massive sulphide (VHMS) and gold in the B

  5. Slide 5: Prominent Position in a Top Mining Jurisdiction

    PROMINENT POSITION IN A TOP MINING JURISDICTION For personal use only Sandfire Resources: DeGrussa Cu-Au  Discovered 2009  Resource 2011 – 14.3Mt @ 4.6% Cu and 1.6g/t Au for 652kt Cu and 742koz Au1  Mine Life to Mid 2022 Sandfire Resources: Monty Cu-Au  Ore Reserve (Mar 2017): 80kt Cu & 42koz Au

  6. Slide 6: Foundations Set for Future Growth

    FOUNDATIONS SET FOR FUTURE GROWTH For personal use only Geophysical interpretations of geology: WEST BRYAH BASIN (1:100k), and FORREST & CASHMAN areas of interest (1:25k) Geochemical soil sampling at Geochemical soil Aircore drilling: MLEM follow-up Historic Exploration Review – Orient Prospect: CAS

  7. Slide 7: Forrest Project (AUR 80%)

    FORREST PROJECT (AUR 80%) Narracoota volcanic rocks under Ravelstone For personal use only sedimentary rocks Starlight (max. 5m drill holes) Project Overview  Forrest Project1 (AUR 80% / Fe Ltd 20% (ASX:FEL)) covers 227 km2 Fortnum Au in the northwest of the Bryah Basin  Equivalent position to Hor

  8. Slide 8: Forrest Prospect

    FORREST PROSPECT For personal use only S N Significant Copper Intersects New AC  Discovered in 2014 through re-assaying of gold focused drilling  RC and Diamond drilling significant intercepts include;  FGDD001: 9.65m @ 5.00% Cu and 1.91g/t Au from 142.4m*  FGDD003: 9.55m @ 2.25% Cu and 0.66g/t

  9. Slide 9: Wodger Prospect

    WODGER PROSPECT For personal use only Significant Copper Mineralisation New AC  Discovered in 2014 through re-assay of historic drill spoils  Air Core drilling in 2015/16, RC/Diamond Drilling in 2017  WDRC005: 25m @ 2.87% Cu and 0.48g/t Au from 193m* 1  WDRC002: 6m @ 3.14% Cu and 2.61g/t Au from

  10. Slide 10: Forrest Project Regional Prospectivity

    FORREST PROJECT1 For personal use only Regional Prospectivitiy Under-explored prospective  Aircore drilling completed between Wodger and Big Billy*; stratigraphy – Narracoota underlying Ravelstone  14m @ 0.29% Cu, from 28m to EOH Wilthorpe-Kinders  8m @ 0.13% Cu, from 24m Fault: VHMS and gold  1

  11. Slide 11: Cashman Project

    CASHMAN PROJECT2 Prospectivity For personal use only  The southern leases cover the most prospective VHMS unit – the Karalundi Formation (DeGrussa-host stratigraphy). Narracoota-Ravelstone contact may have potential for Horseshoe Lights style VHMS  Copper and gold deposits along strike from the te

  12. Slide 12: Horseshoe Well Project

    HORSESHOE WELL PROJECT3 Prospectivity For personal use only  Horseshoe Well project is regionally under explored  Edmund-Collier Group rocks cover prospective Bryah Group rocks • Depth to Narracoota likely only 200m in southern part of tenement package (E52/3166 and 3291) • Historic drilling north

  13. Slide 13: Sandfire Resources NL JV – Morck Well East / Doolgunna

    SANDFIRE RESOURCES NL JV – MORCK WELL EAST / DOOLGUNNA For personal use only  SFR paid $1.5m for Farm-in Right to Morck Well East and Doolgunna Projects in February 2018  Minimum expenditure of $2m within 2 years Bryah Group  SFR to sole fund exploration until a Feasibility Study is completed on

  14. Slide 14: Near-Term Value Drivers

    NEAR-TERM VALUE DRIVERS  Renewed focus with highly experienced technical team in place to pursue the ‘next’ discovery in the For personal use only Bryah Basin  Improved geological re-interpretations is driving the exploration of previously under-explored yet highly prospective areas of the Bryah B

  15. Slide 15: Project Summary

    PROJECT SUMMARY  High grade copper intersections at the Forrest-Wodger Project reinforce the prospectivity for VHMS For personal use only and gold potential along strike from WestGold’s Fortnum Gold and Starlight VHMS intersection  Renewed excitement for Horseshoe Well Project – unexplored ground

  16. Slide 16: Contact

    Mike Hendriks Level 3, Richardson Street, West Perth WA 6005 For personal use only PO Box 298, West Perth WA 6872 P +61 8 6109 4333 E general@aurisminerals.com.au W www.aurisminerals.com.au https://au.linkedin.com/company/auris-minerals-limited @AurisMinerals 16

Auris Minerals — Investor Presentation (July 2019) on 6ix