  1. Slide 1: Silverton Wind Farm Community Consultative Committee

    1 Silverton Wind Farm Community Consultative Committee Thursday, 19 January 2017

  2. Slide 2: Agenda

    2 Agenda 1. Welcome Confirmation of October meeting minutes Review previous meeting actions 2. Project update 3. Community relations update 4. Topics of interest 5. Other business 6. Next meeting and close Silverton Wind Farm 19 January 2017

  3. Slide 3: Review previous meeting actions

    3 1. Review previous meeting actions Action item CCC Status Who Meeting 1 On behalf of CCC members, to remind media representatives October Ongoing KE about the protocols for interviewing and quoting CCC 2013 members when speaking to the media 2 AGL to send out copies of the TMP (currently still in

  4. Slide 4: Project update: ASX and Media Release

    2. Project update 4 ASX and Media Release › Powering Australian Renewables Fund (PARF) achieves financial close of Silverton Wind Farm. › “Reaching financial close on the Silverton wind farm is a major milestone for PARF”. › “Building more renewables is a key commitment of our Greenhouse Gas Policy”

  5. Slide 5: Silverton Wind Farm

    2. Project update 5 Silverton Wind Farm › Location: Barrier Ranges approximately 5 km north of Silverton › Capacity: 200 MW › Wind turbines: 58 x GE 3.43-130 › Generation: ~780,000 MWh (c.f 44.5%) » powering more than 137,000 average Australian homes › Connection: 220 kV TransGrid substation, Broken

  6. Slide 6: Wind farm layout

    2. Project update 6 Wind farm layout › General Electric (GE) wind turbines » 58 x GE 3.43-130 › Based on the Modification 3 layout approved by the Planning and Assessment Commission (PAC) on Thursday, 22 December 2016 › Layout uses the southern region of the approved wind turbines and is focused on

  7. Slide 7: Wind turbine GE 3.43-130

    2. Project update 7 Wind turbine GE 3.43-130 › Nameplate of 3.43 MW with a 130m rotor and hub height of 110m. › Modification 3 allowed for the advancement in wind turbine technology. › The GE 3.4-130 has up to 30% higher Annual Energy Production (AEP), compared to its predecessor the 3.2- 103. › The

  8. Slide 8: Wind Farm Works

    2. Project update 8 Wind Farm Works › GE-CATCON (joint venture) has been engaged to deliver the wind farm » Engineer, Procure and Construct (EPC) Contract › Scope of works, includes: » 58 x GE 3.43-130 wind turbines » 33kV electrical reticulation (underground and overhead) and 33kV switchroom » Road

  9. Slide 9: Connection Works

    2. Project update 9 Connection Works › TransGrid (Network Services Provider) has been engaged to deliver the connection works for the wind farm » Project Agreement (construction) › Scope of works, includes: » Wind farm 220kV substation » ~25km of 220kV transmission line » New circuit breaker in Tran

  10. Slide 10: Modification approval

    2. Project update 10 Modification 3 approval › Approved by the Planning Assessment Commission (PAC) on Thursday, 22 Dec 2016. › Increase in wind turbine dimensions for advancement in wind turbine technology › Decrease in the number of wind turbines from 282 to maximum of 167 › Concept Approval was a

  11. Slide 11: Community Enhancement Commitments

    2. Project update 11 Community Enhancement Commitments › Silverton Community Fund » $15,000 per year + CPI (life of project) › Solar Silverton Program » 5kW solar PV for leaseholder and residences within 10 km. › Water Tank Program › Mobile Reception Program » Contribute up to $50,000 for mobile rec

  12. Slide 12: Community relations update: Communications

    3. Community relations update 12 Communications • How would people like to be kept up-to-date? • Please register your contact details • Community office • Engagement • Complaints and Enquiries • Consultation on community engagement plan Silverton Wind Farm 19 January 2017

  13. Slide 13: Silverton Community Fund

    3. Community relations update 13 Silverton Community Fund • Governance • Criteria • Documentation • Guidelines • Application form • Evaluation • Community Fund Advisory Panel Silverton Wind Farm 19 January 2017

  14. Slide 14: Industry briefing

    14 3. Community relations updated Industry briefing › AGL together with GE-CATCON will be conducting an industry briefing on Tuesday, 31 January 2017 (time to be determined) › Contractor will be developing a local industry participation plan › Briefing is planned to be undertaken in conjunction with

  15. Slide 15: Traffic Management Plan

    15 4. Topics of interest Traffic Management Plan › Contractor to develop final Traffic Management Plan › Site access is off the Daydream Mine Road › Construction will involve the delivery of components which are oversized and/or overmass  Restricted Access Vehicles (RAV) will require special operat

  16. Slide 16: Heavy and over-dimensional vehicle routes

    16 4. Topics of interest Heavy and over-dimensional vehicle routes Silverton Wind Farm 20 October 2016

  17. Slide 17: Construction water

    4. Topics of interest 17 Construction water › Umberumberka reservoir » Photos showing reservoir previously full and the empty earlier in 2016. » Water restrictions eased from Level 3 to Level 1 on 29 August 2016 » We have approval from Essential Water for 100 ML Silverton Wind Farm 19 January 2017

  18. Slide 18: Horses and wind farms

    4. Topics of interest 18 Horses and wind farms › Delabole Wind Farm is the UK’s first commercial wind farm, established in 1991. › A horse stud farm and riding centre has been operating at the Delabole Wind Farm since 1991 › Originally the wind farm consisted of 10 turbines, a few years ago these we

  19. Slide 19: Visual Impact Assessment

    19 4. Topics of interest Visual Impact Assessment › Subject to final investment decision – prepare photomontages » Silverton township, Mundi Mundi lookout, Umberumberka House, Desert Sculpture. Silverton Wind Farm 19 January 2017

  20. Slide 20: Other business

    20 5. Other business › AGL Viewing Platform Art and Design Competition (Broken Hill Solar Plant) › Questions from group and observers? Silverton Wind Farm 19 January 2017

  21. Slide 21: Next meeting and close

    21 6. Next meeting and close › Next meeting: » Date » Time » Location Silverton Wind Farm 19 January 2017