Belmont Resources Inc. · TSXV:BEA
Belmont Resources — Investor Presentation (April 2022)
24 slides from Belmont Resources's investor presentation, April 2022

Slide 1: A Rich Portfolio of Projects
A Rich Portfolio Of Projects Caution: Drilling in Progress April 2022

Slide 2: Drilling in Progress
Drilling in Progress Drilling in Progress Drilling May 2022

Slide 3: Cautionary Statement
Cautionary Statement Except for historical information contained herein, this presentation may contain forward‐looking statements including, but not limited to, comments regarding predictions and projections. Forward‐looking statements address future events and conditions and therefore involve inher

Slide 4: Acquiring past producing mines in one of the most prolific mining camps
Acquiring past producing mines in one of the most prolific mining camps of western North America • The prolific Greenwood mining camp of southern British Columbia and the adjacent Republic camp of Washington state, have a rich history of mining. It is considered to be one of the most concentrated mi

Slide 5: Come By Chance (CBC) Property
Come By Chance (CBC) Property Drilling in Progress Come By Chance Magnetic Survey 5

Slide 6: Come By Chance (CBC) Property
Come By Chance (CBC) Property • Drilling targeting potential deep‐seated copper/gold porphyritic, bulk tonnage, mineral resource. • Mineralized skarns and epithermal zones potentially associated with concealed porphyry intrusive of copper/gold mineralization. • High‐gold and copper values at surface

Slide 7: Come By Chance Property: Belmont 2020 Magnetic Survey
Come By Chance Property Belmont 2020 Low Level, Hi Res Mag Survey Further Supports The Potential For Finding a Large Copper‐Gold Porphyry Model • The aeromagnetic survey results revealed two magnetic lows within a magnetic high which are indicated as structurally controlled mineralized zones with as

Slide 8: Come By Chance Property IP Survey
Come By Chance Property IP Survey The IP survey results substantiated some of the indications of the potential for a structurally controlled concealed mineralized intrusive. The results revealed three anomalous chargeability high (more than 23 ms) zones correlative or associated with an anomalous lo

Slide 9: Come By Chance Property 2022 Drill Targets
Come By Chance Property 2022 Drill Targets Drilling will test some of these correlative zones for any indications of a potential deep‐seated copper/gold porphyritic, bulk tonnage, mineral resource 9

Slide 10: Lone Star Mine
Lone Star Mine Drilling in Progress 10

Slide 11: Lone Star Mine
Lone Star Mine A 6,000m drill program is in progress to: 1) Validate the historical 250 drill hole database and resource model; 2) Achieve an infill drill hole spacing that is appropriate for advancing the 2007 historic inferred mineral resource to a current measured and indicated resource category;

Slide 12: Lone Star Mine
Lone Star Mine Drilling in Progress July 2021, Belmont acquired the past producing Lone Star mine along with a significant exploration database which included: • data from 250 drill holes • an historic high grade copper resource In 2007 the previous owner, Merit Mining, published a 43‐101 resource r

Slide 13: Lone Star Mine
Lone Star Mine • The Lone Star property is located in northern Washington State on the northeastern tip of the Republic Graben, an important geological feature which hosts several gold and copper mines. • The property lies on a 3‐kilometer long trend of gold‐copper mineralization linked by geology,

Slide 14: Lone Star Mine 2007 Historic Resource
Lone Star Mine 2007 Historic Resource *“Technical Report and Resource Estimate on the Lone Star Deposit, Ferry County Washington (September 23, 2007)” for Merit Mining Corp. and authored by P&E Mining Consultants Inc. NI 43‐101 Disclosure: A qualified person has not done sufficient work to classify

Slide 15: Lone Star Mine - 2022 Drill Results
Lone Star Mine ‐ 2022 Drill Results From To Interval Hole_ID CuEq Cu % Au g/t Ag g/t (m) (m) (m) LS21‐001 41.5 50.3 9.1 0.75 0.6 0.2 3.2 LS21‐001 54.9 61.2 6.9 1.82 1.2 0.8 12.9 LS21‐001 65.8 110 44.2 1.46 1.3 0.2 4.6 inc. 65.8 88.7 19.8 2.78 2.4 0.5 6.7 LS21‐001 115.8 138.7 19.1 0.4 0.4 LS21‐001 14

Slide 16: Lone Star Mine - 2022 Drill Results
Lone Star Mine ‐ 2022 Drill Results From To Interval Hole_ID CuEq Cu % Au g/t Ag g/t (m) (m) (m) LS21‐007 107.9 125.6 17.7 3.48 1.6 2.8 5.9 inc. 112.2 116.3 4.1 6.41 5.3 1.5 16.8 inc. 117.4 122.3 4.9 5.7 0.5 7.9 2.6 LS21‐008 5.5 23.2 17.7 0.8 0.6 0.3 LS21‐009 6.4 46 39.6 0.4 0.4 LS21‐009 63.4 70.7 7

Slide 17: Lone Star Milestones
Lone Star Milestones • 6,000 m drill program expected to be completed May 2022 • Updated 43‐101/JORC resource report Q2 2022 • 2022 Preliminary Economic Assessment/Scoping Study Q2 2022 17

Slide 18: Kibby Basin Lithium Project, Nevada
Kibby Basin Lithium Project, Nevada Drilling to Start May, 2022 Drilling to target large conductive target (brine lithium) beneath playa. The Kibby Basin Lithium Project totaling 2,572 acres (10.4 sq kms) is located 60kms north of Clayton Valley Basin Lithium. Albemarle is located in the Clayton Val

Slide 19: The Kibby Basin Similar to Clayton Valley Basin
The Kibby Basin Similar to Clayton Valley Basin The Kibby Basin has similar features as the Clayton Valley basin which are conducive to the placement of lithium brines. • A pull‐apart drop down closed basin. • Basin has structural traps (faults) and is closed with no outlets for drainage. • The sett

Slide 20: The Kibby Basin Lithium Claims Marquee JV/Options
The Kibby Basin Lithium Claims Marquee JV/Options Kibby Playa Claim Block In November 2021, Belmont announced a Option/JV agreement with Marquee Resources (ASX.MQR) for the Kibby Block, one of six claim blocks on the Kibby Basin. The agreement terms are: • for Marquee to issue Belmont C$100,000 cash

Slide 21: The Kibby Basin Lithium Claims
The Kibby Basin Lithium Claims Drilling is planned for May 2022. 3 drill holes totaling 2,500m will test the conductive anomaly in various areas of the Kibby Playa Claim Block. 21

Slide 22: The Kibby Basin Lithium Claims Permitted for Water
The Kibby Basin Lithium Claims Permitted for Water The Kibby Basin lithium property is fully permitted by the state of Nevada to extract a maximum 2,896 acre‐feet (944 million gallons) annually of water for brine processing and production of lithium compounds. Obtaining a water permit for the Kibby

Slide 23: Key Facts
Key Facts Share Info As of March 1, 2022 Shares: 52.6M Warrants: 26.6M Options: 4.0M Fully Diluted: 83.2M Contact Info Belmont Resources Inc.– TSX‐V: BEA Suite 615 – 800 W. Pender Street Vancouver, British Columbia, Canada V6C 2V6 Telephone: (604) 505‐4061 E‐mail: george@belmontresources.com 23

Slide 24: Drilling in Progress
Drilling in Progress Drilling in Progress Drilling May 2022 April 2022
Source: Internet Archive copy of belmontresources.com
More decks from Belmont Resources Inc.
Investor Presentation (September 2025)32 slides · September 2025
Technical Presentation (April 2025)8 slides · April 2025
Investor Presentation (October 2024)16 slides · October 2024
Fact Sheet (September 2024)2 slides · September 2024
Investor Presentation (September 2024)26 slides · September 2024
Fact Sheet (August 2024)2 slides · August 2024