Slide 1: Tshepong and Phakisa integration - Analyst Site Visit
© Harmony | Tshepong and Phakisa integration 1 24 – 25 August 2017 ANALYST SITE VISIT
Slide 2: Safe Harbour Statement
2 PRIVATE SECURITIES LITIGATION REFORM ACT SAFE HARBOUR STATEMENT This presentation contains forward-looking statements within the meaning of the safe harbor provided by Section 21E of the Securities Exchange Act of 1934, as amended, and Section 27A of the Securities Act of 1933, as amended, with re
Slide 3: Agenda
3 AGENDA 1 Safety – Beyers Nel 2 SA operational structure – Beyers Nel 3 Tshepong/Phakisa integration – Simphiwe Kubheka 4 Conclusion and questions © Harmony | Tshepong and Phakisa integration 5 Tshepong/Phakisa mine visit agenda
Slide 4: Safety
© Harmony | Tshepong and Phakisa integration 4 SAFETY
Slide 5: Safety remains our top priority
5 SAFETY REMAINS OUR TOP PRIORITY Fatality injury frequency rate 0.30 0.28 Achieved milestone 0.27 fatality free quarter 0.25 (June 2017 qtr) 0.22 0.22 0.21 0.21 Per million hours worked 0.20 0.18 0.17 0.16 0.15 0.13 © Harmony | Tshepong and Phakisa integration 0.11 0.11 0.10 0.07 0.05 0.00 FY05 FY0
Slide 6: Safety is key to achieving our operational plans
6 SAFETY IS KEY TO ACHIEVING OUR OPERATIONAL PLANS Pro-active and risk based Safety and health The four layered approach More pro-active Harmony Culture of continuous learning and care Risk controls are actively managed with a focus on preventive controls Safety drivers: • Risk assessment in
Slide 7: SA Operational Structure
© Harmony | Tshepong and Phakisa integration 7 Beyers Nel STRUCTURE SA OPERATIONAL
Slide 8: SA EXCO - Experienced team
8 SA EXCO - EXPERIENCED TEAM Jaco Boshoff Anton Buthelezi Melanie Dr Tumi Legobye Thomas Robert Hart Danie Muller Mineral resources Human Resources Naidoo-Vermaak Health van den Bergh Acting Technical Acting Finance and reserves Sustainability Safety © Harmony | Tshepong and Phakisa integration Mose
Slide 9: Operational excellence - strategy and approach
9 OPERATIONAL EXCELLENCE – STRATEGY AND APPROACH Create an enabling environment Realistic Safety and Infrastructure Grade Capital production health management management allocation plans © Harmony | Tshepong and Phakisa integration Safety Focused Consistent, Asset campaigns capital predictable manag
Slide 10: Tshepong/Phakisa Integration
10 TSHEPONG/PHAKISA © Harmony | Tshepong and Phakisa integration INTEGRATION Simpiwe Kubheka
Slide 11: Tshepong/Phakisa integration
11 Tshepong TSHEPONG/PHAKISA INTEGRATION Integration rationale: • synergies due to proximity of ore bodies • underutilisation of Tshepong infrastructure • overutilisation of Phakisa infrastructure Integration will: • alleviate the bottlenecks and constraints at Phakisa Phakisa • exploit synergie
Slide 12: Tshepong and Phakisa schematic layout
© Harmony | Tshepong and Phakisa integration 12 TSHEPONG AND PHAKISA SCHEMATIC LAYOUT
Slide 13: Optimisation area
13 OPTIMISATION N AREA Mined out ± 45 000 reef tonnes @ 1450 cmg/t Available to be mined will be cross trammed from Phk N to Tsh decline. Flow of ore 3 Shaft © Harmony | Tshepong and Phakisa integration
Slide 14: Tshepong and Phakisa combined - Tshepong operations
14 TSHEPONG AND PHAKISA COMBINED - TSHEPONG OPERATIONS Safety improvement in FY17, remains a priority: • Tshepong achieved 3 250 000 fatality free milestone Production • Fatality injury frequency rates improved Long life, growth mines: 33% • Basal Reef is the primary economic reef Tshepong Phaki
Slide 15: Focused capital allocation and prioritisation
15 FOCUSED CAPITAL ALLOCATION AND PRIORITISATION FY18 Capital expenditure (R'million) Major capital priority: • improving ventilation • Sub75 project at Tshepong 194 Ongoing development 160 focused on: • Phakisa ramp up © Harmony | Tshepong and Phakisa integration 709 • improving flexibility • a
Slide 16: Focused capital allocation and prioritisation (US$)
16 FOCUSED CAPITAL ALLOCATION AND PRIORITISATION FY18 Capital expenditure (US#039;million) 14 12 52 © Harmony | Tshepong and Phakisa integration On-going development Shaft capital and AE's Major capital 1US$=R13.74
Slide 17: Tshepong decline layout
17 TSHEPONG DECLINE LAYOUT Current Decline – Sub 71 Project area 66 Level Sub 66 Project (69 and 71 Level) Sub 71 Project (73 and 75 Level) Sub 75 Project (77 Level) 69 Level N 69 Level S 71 Level N 73 Level N 71 Level S 73 Level S © Harmony | Tshepong and Phakisa integration 75 Level 77 Level
Slide 18: Sub design and layout
18 SUB 75 DESIGN AND LAYOUT Chairlift Decline Single Drum Winder Capital Development OCD Development 76 Lev Station Landing Chairlift Decline Belt/Material Decline © Harmony | Tshepong and Phakisa integration 77 Lev Station 78 Lev Cross-Belt
Slide 19: Tshepong/Phakisa Mine Visit Agenda
19 TSHEPONG/PHAKISA MINE © Harmony | Tshepong and Phakisa integration VISIT AGENDA Simpiwe Kubheka
Slide 20: Agenda for Friday's mine visit
20 AGENDA FOR FRIDAY’S MINE VISIT Activity Time Bus/transport to leave guesthouses 06H00 to 06H30 Arrival, welcome & breakfast 07H00 to 07H30 Safety briefing for going underground 07H30 to 08H00 Underground © Harmony | Tshepong and Phakisa integration • 66 level – decline top infrastructure 08H00 to
Slide 21: Questions
© Harmony | Tshepong and Phakisa integration 21 QUESTIONS