Harmony Gold Mining Co. Ltd. · JSE:HAR
Harmony Gold Mining — H1 FY2024 Earnings Presentation
44 slides from Harmony Gold Mining's earnings presentation, Feb 28, 2024
Slide 1: H1FY24 Results Presentation
H1FY24 RESULTS PRESENTATION Peter Steenkamp, CEO 28 February 2024 © Harmony
Slide 2: Safe Harbour Statement and Disclaimer
2 PRIVATE SECURITIES LITIGATION REFORM ACT SAFE HARBOUR STATEMENT AND DISCLAIMER Interim results for the six-month period ended 31 December 2023 FORWARD LOOKING STATEMENTS This presentation contains forward-looking statements within the meaning of the safe harbour provided by Section 21E of the Exch
Slide 3: Strategy
STRATEGY Peter Steenkamp, CEO © Harmony
Slide 4: Harmony asset overview and key operating statistics
4 Doornkop Kalgold (open pit) Kusasalethu Mine Waste Solutions Mponeng Savuka Phoenix Eva Copper project (proposed open pit) Hidden Valley mine Moab Khotsong Central Plant Reclamation (open pit) Tshepong North Tshepong South Wafi-Golpu Target 1 (block cave Joel mining project) Masimong LEGEND Surfac
Slide 5: Goals achieved: H1FY24 operational and financial results
5 GOALS ACHIEVED H1FY24 OPERATIONAL AND FINANCIAL RESULTS Interim results for the six-month period ended 31 December 2023 A safe mine is a Returning capital to Net cash position Increased margins Added quality ounces profitable mine shareholders Focus on Record interim Working towards increasing Met
Slide 6: Operational Results
OPERATIONAL RESULTS Peter Steenkamp, CEO © Harmony
Slide 7: Operational excellence and flexibility
7 Strong Operational Excellent Stable and Partners Substantial safety and flexibility and underground predictable of resource to operational culture predictability grades – from cost structure reserve © Harmony driven by high grade choice conversion experienced underground opportunities in managemen
Slide 8: Continuous improvement in safety
8 CONTINUOUS IMPROVEMENT IN SAFETY Lost time injury frequency rate (LTIFR) – Group Interim results for the six-month period ended 31 December 2023 7,21 6,23 6,26 6,16 6,33 6,18 5,65 5,49 5,38 5,19 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 H1FY23 H1FY24 Loss of life injury frequency rate (LLIFR) – Grou
Slide 9: Excellent grade growth and production consistency since 2016
9 Interim results for the six-month period ended 31 December 2023 EXCELLENT GRADE GROWTH AND PRODUCTION CONSISTENCY SINCE 2016 South African Operations Total gold production (kgs) underground recovered grade (g/t) 6,29 FY24 5,78 Guidance: 5,48 5,59 5,51 47 755 5,45 5,37 46 236 45 651 46 033 44 734 5
Slide 10: Driving real all-in sustaining costs down
10 DRIVING REAL ALL-IN SUSTAINING COSTS DOWN SECURING HIGHER MARGINS Interim results for the six-month period ended 31 December 2023 Total All-in sustaining cost (R/kg) Total All-in sustaining cost (US$/oz) 1 709 889 766 1 558 1 403 843 043 835 891 © Harmony FY22 FY23 H1FY24 FY22 FY23 H1FY24 H1FY24
Slide 11: Strong positive free cash flow generation enables growth
11 Interim results for the six-month period ended 31 December 2023 STRONG POSITIVE FREE CASH FLOW GENERATION ENABLES GROWTH Total operating free cash flow (Rm) Total operating free cash flow (US$m) 424 7 112 381 6 528 6 031 339 228 3 573 207 191 3 008 2 905 122 1 735 86 1 166 59 755 © Harmony FY16 F
Slide 12: Higher margins drive significant operating free cash flows
12 Interim results for the six-month period ended 31 December 2023 HIGHER MARGINS DRIVE SIGNIFICANT OPERATING FREE CASH FLOWS % production, operating free cash flow and operating free cash flow margins contribution per asset grouping 50% 45% 40% 34% 31% 25% 19% 17% 17% 11% 11% 12% © Harmony SA high-
Slide 13: Responsible Stewardship
RESPONSIBLE STEWARDSHIP Peter Steenkamp, CEO © Harmony
Slide 14: Sustainable benefits through tailings retreatment and water stewardship
14 SUSTAINABLE BENEFITS THROUGH TAILINGS RETREATMENT AND WATER STEWARDSHIP – SUPPORTING CIRCULAR ECONOMY Interim results for the six-month period ended 31 December 2023 Decarbonisation BALANCING • Energy efficiencies • Renewable energy programme E Effective waste • Green energy Benefit sharing manag
Slide 15: Mining with purpose: ESG ratings and recognition
15 Interim results for the six-month period ended 31 December 2023 © Harmony MINING WITH PURPOSE: IT IS WHAT WE ARE ALL ABOUT ESG RATINGS AND RECOGNITION ESG rating upgraded Score of 71.71% and disclosure to 4.1 out of 5.0 Harmony remained on a Harmony ranks in the score of 100% Score of ‘A’ Signifi
Slide 16: Growing Our Quality Ounces
GROWING OUR QUALITY OUNCES Peter Steenkamp, CEO © Harmony
Slide 17: Globally significant resource base including copper
17 GLOBALLY SIGNIFICANT RESOURCE BASE WHICH INCLUDES COPPER PRESENTS EXCELLENT RESERVE CONVERSION POTENTIAL Interim results for the six-month period ended 31 December 2023 Mineral Resources: gold and copper1 Mineral Reserves: gold and copper2 Australia copper 6% Papua New Guinea gold Papua New Guine
Slide 18: Long term value creation: investing in our own resources
18 LONG TERM VALUE CREATION INVESTING IN OUR OWN RESOURCES Interim results for the six-month period ended 31 December 2023 Execution Moab Khotsong – Zaaiplaats extension • 9g/t Permitting • 225koz per annum • 22-year life-of-mine (LOM) Mine Waste Solutions – Feasibility Kareerand • 14-year LOM • Str
Slide 19: Mponeng extension: extracting maximum value
MPONENG EXTENSION: EXTRACTING MAXIMUM VALUE TO CREATE LASTING BENEFITS 19 FOR ALL STAKEHOLDERS MEETS ALL INVESTMENT CRITERIA Interim results for the six-month period ended 31 December 2023 Lower risk profile: • Good safety record to be maintained, safety remains priority! All ESG1 factors considered
Slide 20: A de-risked, modular approach to access three high-grade blocks
20 A DE-RISKED, MODULAR APPROACH TO ACCESS THREE HIGH-GRADE BLOCKS TauTona Mponeng m bd Interim results for the six-month period ended 31 December 2023 Collar: 176.2mbd Collar: 275.8mbd North Driefontein boundary Ventilation Shaft Service Shaft Main Shaft Main Shaft 58 Level Sub Shaft 61 Level 66 Le
Slide 21: Sustaining our future through continuous investment
21 Interim results for the six-month period ended 31 December 2023 SUSTAINING OUR FUTURE THROUGH CONTINUOUS INVESTMENT 1 800 1 000 000 1 600 900 000 800 000 1 400 700 000 1 200 600 000 1 000 Oz'000 R/kg 500 000 800 400 000 600 300 000 400 200 000 © Harmony 200 100 000 - 0 FY16A FY17A FY18A FY19A FY2
Slide 22: Affordable growth capital intensity including Mponeng extension
22 AFFORDABLE GROWTH CAPITAL INTENSITY INCLUDING MPONENG EXTENSION Capital guidance (Rand)¹ Interim results for the six-month period ended 31 December 2023 10 000 9 530 9 429 9 000 1 277 972 8 000 7 598 1 155 1 425 7 000 1 514 844 6 442 6 192 6 000 407 983 1 096 2 733 Rm 5 000 327 2 236 957 2 049 22
Slide 23: Project capital remains well-sequenced and manageable
23 Interim results for the six-month period ended 31 December 2023 PROJECT CAPITAL1 REMAINS WELL-SEQUENCED AND MANAGEABLE FY25 FY27 FY29 Wafi-Golpu3 Hidden Valley Doornkop1 and Eva Copper 2,3 Stage 8 stripping • Doornkop 207/202 levels First production subject complete • Eva Copper in production to
Slide 24: Financial Results
FINANCIAL RESULTS Boipelo Lekubo, FD © Harmony
Slide 25: Excellent H1FY24 financial performance and earnings growth
25 EXCELLENT H1FY24 FINANCIAL PERFORMANCE AND OUTSTANDING EARNINGS GROWTH Interim results for the six-month period ended 31 December 2023 H1FY24 H1FY23 Metrics Change Group revenue up (Rm)1 (Rm)1 Group revenue2 35% 31 415 23 259 35% Net profit 220% 5 960 1 861 to R31bn EBITDA3 114% 17 432 8 139 Head
Slide 26: Balance sheet strong with R9.8 billion in available headroom
26 BALANCE SHEET STRONG WITH R9.8 BILLION IN AVAILABLE HEADROOM Interim results for the six-month period ended 31 December 2023 Headroom (ZAR) 3 436 2 867 R9.8bn R7.3bn 6 405 © Harmony 4 383 FY23 H1FY24 Undrawn facilities Cash and cash equivalents
Slide 27: Well-positioned to absorb adverse movements in gold price
27 WELL-POSITIONED TO ABSORB ADVERSE MOVEMENTS IN GOLD PRICE Protection against adverse movement Interim results for the six-month period ended 31 December 2023 R1 200 000/kg spot gold price in gold price through: 33% AIC margin 42% AISC margin 68% cash operating cost margin • Effective hedging prog
Slide 28: Returning cash to shareholders alongside investment
28 RETURNING CASH TO SHAREHOLDERS ALONGSIDE INVESTMENT IN OUR FUTURE Interim results for the six-month period ended 31 December 2023 RECORD INTERIM DIVIDEND DECLARED Solid cash flows and Confidence in our plans Delivering and ability to pay a dividend strong balance sheet positive total shareholder
Slide 29: Conclusion
CONCLUSION Peter Steenkamp, CEO © Harmony
Slide 30: This is Harmony: a specialist gold producer with growing copper footprint
30 THIS IS HARMONY: A SPECIALIST GOLD PRODUCER WITH A GROWING INTERNATIONAL COPPER FOOTPRINT Interim results for the six-month period ended 31 December 2023 R Embedded Quality ounces Geared exposure Significant Gold mining Flexible sustainability and to the copper exposure specialists with balance s
Slide 31: Thank You
THANK YOU CONTACT US harmonyir@harmony.co.za © Harmony
Slide 32: Annexures
32 PNG MINING AND PETROLEUM CONFERENCE 2022 © Harmony ANNEXURES
Slide 33: South African underground high-grade operations
33 SOUTH AFRICAN UNDERGROUND HIGH-GRADE OPERATIONS*: DRIVING GROWTH AND LOWERING COSTS PER UNIT (H1FY24 VS H1FY23) Interim results for the six-month period ended 31 December 2023 Production increased All-in sustaining costs Operating free cash by improved by flow increased by SA SA 21% 7% >100% unde
Slide 34: South African underground optimised operations
SOUTH AFRICAN UNDERGROUND OPTIMISED OPERATIONS*: 34 SUBSTANTIAL INCREASE IN OPERATING FREE CASH FLOWS (H1FY24 VS H1FY23) Interim results for the six-month period ended 31 December 2023 All-in sustaining costs Operating free cash flow Production increased by increased by SA SA -2% 11% 71% underground
Slide 35: South African surface operations
35 SOUTH AFRICAN SURFACE OPERATIONS*: LOWERING RISK AND IMPROVING MARGINS (H1FY24 VS H1FY23) Operating Interim results for the six-month period ended 31 December 2023 All-in sustaining costs free cash flow increased Production improved by by SA underground high-grade SA underground optimised +24% 10
Slide 36: International: Big Red delivers exceptional results
36 INTERNATIONAL: AS PLANNED, BIG RED DELIVERS EXCEPTIONAL RESULTS (H1FY24 VS H1FY23) Interim results for the six-month period ended 31 December 2023 Production increased All-in sustaining costs Operating free by decreased by cash flow increased by SA SA 52% 46% >100% underground underground high-gr
Slide 37: Strong H1FY24 financial performance (US$)
37 STRONG H1FY24 FINANCIAL PERFORMANCE AND OUTSTANDING EARNINGS GROWTH Interim results for the six-month period ended 31 December 2023 H1FY24 H1FY23 Group revenue up Metrics Change (US$’m)1 (US$’m)1 25% Group revenue2 27% 1 681 1 343 Net profit 196% 320 108 to US$1.7bn EBITDA3 99% 954 479 Headline e
Slide 38: Balance sheet flexible with US$385 million headroom
38 BALANCE SHEET REMAINS FLEXIBLE WITH US$385 MILLION IN AVAILABLE HEADROOM (US$) Interim results for the six-month period ended 31 December 2023 Headroom (US$) 187 152 US$537m US$385m 350 © Harmony 233 FY23 H1FY24 Undrawn facilities Cash and cash equivalents
Slide 39: Hedge table as at December 2023
39 HEDGE TABLE AS AT 31 DECEMBER 2023 FY24 FY2025 FY2026 Interim results for the six-month period ended 31 December 2023 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Total Rand gold Forward contracts koz 78 78 78 78 72 72 68 34 558 R'000/kg 1 134 1 165 1 190 1 234 1 316 1 362 1 361 1 394 1 256 Dollar gold Forward Contra
Slide 40: FY24 cost and grade guidance per operation
40 FY24 COST AND GRADE GUIDANCE (PER OPERATION) • Plan to produce ~1.38Moz to 1.48Moz in FY24, at • an average underground recovered grade of ~5.60g/t to 5.75g/t, Interim results for the six-month period ended 31 December 2023 • an all-in sustaining cost of R975 000/kg for total Harmony Adjusted re
Slide 41: FY24 production guidance per operation
41 FY24 PRODUCTION GUIDANCE (PER OPERATION) FY23 production FY24 guidance Life of mine Interim results for the six-month period ended 31 December 2023 Operation (oz) (oz) (years) Moab Khotsong 214 381 187 600 – 195 600 21 Mponeng 239 490 232 900 – 245 200 20 Tshepong North 107 834 99 300 – 104 500 7
Slide 42: FY24 capital guidance per operation (Rand)
42 Interim results for the six-month period ended 31 December 2023 FY24 CAPITAL GUIDANCE PER OPERATIONS - UNCHANGED (RAND) 3 000 2 500 2 000 1 277 Rm 1 500 1 000 370 732 1 396 90 © Harmony 389 256 18 500 578 92 56 272 170 140 369 152 7 453 142 281 328 309 287 96 88 207 81 58 152 187 124 133 135 20 -
Slide 43: FY24 capital guidance per operation (US$)
43 Interim results for the six-month period ended 31 December 2023 FY24 CAPITAL GUIDANCE PER OPERATIONS - UNCHANGED (US$) 140 120 100 69 80 US$m 60 20 40 5 75 40 21 14 1 © Harmony 31 5 3 15 9 20 20 8 8 24 8 18 17 15 5 5 11 15 4 3 8 10 7 7 7 1 5 - - - Hidden MWS Moab Mponeng Doornkop Target 1 Tshepon
Slide 44: Securing our future by investing in our assets
44 Interim results for the six-month period ended 31 December 2023 SECURING OUR FUTURE BY INVESTING IN OUR ASSETS Moab Khotsong Hidden Valley Project Target 1 optimisation Kareerand Doornkop 207/212 Renewables extension (Zaaiplaats) extension • Project is now • Project on track • Project on track •
Harmony Gold Mining Company — H1 FY2024 Earnings Presentation on 6ix