Gemfields Group Limited · JSE:GML
Gemfields — Technical Presentation (April 2017)
68 slides from Gemfields's technical presentation, April 2017

Slide 1: Analyst site visit 28th March – 2nd April 2017
A leading supplier of responsibly sourced coloured gemstones Analyst site visit 28th March – 2nd April 2017 Gemfields Plc

Slide 2: Legal disclaimer
Legal disclaimer This document, which has been issued by Gemfields Plc (the “Company”), This document does not and is not intended to constitute an offer of securities for comprises the written materials/slides for a presentation concerning the distribution or sale in the United States or any other

Slide 3: Kagem Emerald Mine
Kagem Emerald Mine Dibya Baral Gemfields Plc 3

Slide 4: Gemfields & The Government of Zambia
Gemfields & The Government of Zambia A Model Collaboration GEMFIELDS Plc GOVERNMENT OF ZAMBIA 75% 25% THE KAGEM EMERALD MINE World’s largest Employees: 891 Location: ZAMBIA emerald mine 50% 50% THE KARIBA AMETHYST MINE World’s largest Location: ZAMBIA Employees: 251 amethyst mine Kagem license over

Slide 5: Kagem Emerald Mine: Location Map
Kagem Emerald Mine: Location Map Kitwe Kagem Emerald Mine Lusaka Kariba Gemfields Plc 5

Slide 6: Kagem Location in Ndola Rural Restricted Area
Kagem Location in Ndola Rural Restricted Area 606 000mE 616 000mE 626 000mE 636 000mE NDOLA RURAL EMERALD RESTRICTED AREA 406 407 410 408 414 403 409 402 405 435 404 229 223 444 412 401 411 443 449 447 450 322 400 324 323 8 560 000mN 443A 8 560 000mN 413 432 436 433 440 295 260 416 355 314 296 317 2

Slide 7: Kagem Location In Emerald Area
Kagem Location In Emerald Area Gemfields Plc 7

Slide 8: Geology and Prospectivity
Geology and Prospectivity Geology Gemfields Plc 8

Slide 9: Kagem Licence Overview Map
Kagem Licence Overview Map Geology Gemfields Plc 9

Slide 10: Kagem Turnaround
Kagem Turnaround Pre 2008 - 2017 • Loss making • Environmentally Degrading • Short-term plan and deferred mine development • Widespread Pilferage • Unsafe operations • Little or no geological knowledge • Demotivated Workforce • No Community engagement Today • Profit making, Tax and Dividend Paying •

Slide 11: Exploration Work Flow
Exploration Work Flow Exploration • Aeromagnetics CURRENT DUMP • Airborne Radiometrics ILLEGAL WORKING MOBILE POLICE CAMP ILLEGAL WORKINGS • Mapping and Trenching PIT I • Ground Magnetics PIT II • Ground Radiometric PIT III DUMP PIT IV • Drilling / Logging DUMP • Geochem (XRF/LIBS/ICP- 0 MS) DUMP PI

Slide 12: Prospects
Prospects Total Blocks No. of DHs Total meters 6 835 85,988 Gemfields Plc 12

Slide 13: Kagem JORC Resource and Reserves update
Kagem JORC Resource and Reserves update Resource Summary Proved/Probable Measured, Indicated and Post-tax NPV Average annual Open pit mine Ore Reserves Inferred Mineral Resource production plan until 1.1bct at diluted ore grade (E+B) 1.8bct at diluted ore grade (E+B) US$520m 44.7mct 10% discount rat

Slide 14: Mine Geology
Mine Geology LAT/SOIL MS Pegmatite Discordant QT QT shear QT shear TMS AMPH FMS FW shear Pegmatite concordant Gemfields Plc 14

Slide 15: Geology
Geology Emerald Mineralisation EMERALD MINERALISATION • Occurrence of Host rock (TMS) and presence of Chromoferic elements (Cr, V) in its composition • Intrusion of Pegmatite containing Beryllium elements • Alteration / Reaction / Ionic exchange between the pegmatitic fluids and the host rocks • Inc

Slide 16: Mine Development
Mine Development Gemfields Plc 16 PB-5, looking to high wall

Slide 17: Chama Progress in Mine Footprint
Chama Progress in Mine Footprint Gemfields Plc 17

Slide 18: Mine technology
Mine technology Mine Geology Chama Geology Gemfields Plc 18 Block Model looking to high wall

Slide 19: Mine Planning and Scheduling
Mine Planning and Scheduling Gemfields Plc 19

Slide 20: Fibolele Sector Bulk Sampling
Fibolele Sector Bulk Sampling Successful Bulk Sampling Operation W V` U` T` R` S` Exposed TMS Q` P` O` Gemfields Plc 20 N`

Slide 21: Libwente Sector Bulk Sampling
Libwente Sector Bulk Sampling Accelerating the Search Libwente South pit Gemfields Plc 21 Ishuko South pit

Slide 22: Washing Plant - Last Year
Washing Plant Last Year Gemfields Plc 22

Slide 23: Washing Plant - Today
Washing Plant Today Gemfields Plc 23

Slide 24: Value Addition – Sort House
Value Addition – Sort House (i) Grading and Sorting (ii) Reliability (iii) Marketing (iv) Service Sorting and grading • Pioneered the world’s most comprehensive grading and sorting system for rough emeralds and rubies • Supported by the commensurate stock levels needed to ensure consistency of suppl

Slide 25: Highlights and Mine cost analysis for Kagem, Zambia
Highlights and Mine cost analysis for Kagem, Zambia A total of US$6.1m capex invested in Kagem in FY2016 Annual production Emerald and beryl of emerald and beryl grade for the year 30.0mct 241 ct/t 2015: 30.1 million carats (‘mct’) 2015: 242 carats per tonne (‘ct/t’) Total operating costs Unit opera

Slide 26: Kagem Monthly Excavation / Gemstone Production
Kagem Monthly Excavation / Gemstone Production TRH (t) $/ t Production Emerald+Beryl (carats) Gemfields Plc 26

Slide 27: Value Addition — Local Employment
Value Addition — Local Employment Increased mining activity created Employment Opportunities at Kagem 882 891 695 624 548 479 445 451 392 30 Jun 08 30 Jun 09 30 Jun 10 30 Jun 11 30 Jun 12 30 Jun 13 30 Jun 14 30 Jun 15 30 Jun 16 Gemfields Plc 27

Slide 28: Mining Outlook
Mining Outlook Production ramp up • Established the continuity of the host lithology all over the license and specifically over 300m along the dip and to a vertical depth of 150m by mining at Chama. • Further systematic exploration besides establishing the continuity over 500m down dip along the riv

Slide 29: Sustainability
Sustainability Gemfields Plc 29 Gemfields Plc

Slide 30: Corporate social responsibility
Corporate social responsibility Sustainability in Education, Health and Agriculture Gemfields Plc 30

Slide 31: Corporate social responsibility
Corporate social responsibility Sustainability in Education, Health and Agriculture Gemfields Plc 31

Slide 32: Corporate social responsibility
Corporate social responsibility Sustainability in Education, Health and Agriculture Gemfields Plc 32

Slide 33: Montepuez Ruby Mining
Montepuez Ruby Mining Gopal Kumar Gemfields Plc 33

Slide 34: Montepuez Ruby Mining Lda
Montepuez Ruby Mining Lda Mwiriti Lda 75% 25% Potentially the world’s single largest ruby deposit Gemfields Plc

Slide 35: Timeline
Timeline 2009 Rubies first discovered in Montepuez 3rd Jun 2011 JV agreement signed between Gemfields plc and Mwiriti Lda 30th Aug 2011 Registration of Montepuez Ruby Mining Lda (MRM) 11th Nov 2011 Mining licenses 4702 and 4703 granted in favour of MRM, which is valid till 11.11.2036 9th Mar 2012 Is

Slide 36: Location of Montepuez Ruby Mining
Location of Montepuez Ruby Mining MRM 4703 C • MRM received a 25-years of Mining and Exploration Licence (4702 & 4703c) in November 2011 for an area of 336 sqkm. • Subsequently, the Process of Amalgamation of concessions was accomplished in 2015 & a new concession no. 4703C for an area of 349 sqkm h

Slide 37: Ruby Formation
Ruby Formation Geological history The African setting The Asian setting The Pan-African orogeny (Figure 1) occurred 750–450 million years ago, and gave rise to deposits in Kenya, Tanzania, Mozambique, Madagascar, Sri Lanka and southern India. Many of these corundum are genetically related. In contra

Slide 38: Ruby Formation
Ruby Formation How? Gemfields Plc 38

Slide 39: Ruby Formation: Primary Ruby Mineralisation
Ruby Formation Primary Ruby Mineralisation • Corundum (Al2O3) can only form in a limited range of high pressures and high temperature condition in a Silica (SiO2) deficient condition. • When solutions rich in Alumina (Al2O3) intrudes a host rock rich in Cr, Fe and V. The corundum gains a red/pink co

Slide 40: Ruby Formation: Secondary Ruby Mineralisation
Ruby Formation Secondary Ruby Mineralisation • Ruby is liberated by physical and chemical weathering process from rocks, concentrated by water/gravity and deposited as alluvial/colluvial material over weathered bedrock. • The size, intensity variation and total area of this deposition is unknown and

Slide 41: Geology
Geology Multidisciplinary Approach: Core Drilling Geological • Typical association with certain rocks or minerals Geophysical Method • Airborne Geophysical survey – Magnetics & Radiometric Geochemical Method • Chemical signatures of hidden mineral deposits often dispersed over wide areas by chemical

Slide 42: Exploration Strategy
Exploration Strategy Primary Ruby Mineralisation GEOLOGICAL MAP SRTM IMAGERY RADIOMETRIC MAGNETICS Gemfields Plc 42

Slide 43: Exploration Strategy
Exploration Strategy Secondary Ruby Mineralisation Shuttle Radar Topography Mission (SRTM) data. Digital Elevation Models Gemfields Plc 43

Slide 44: Exploration
Exploration Core and Auger Drilling • The exploration program continued with: • (i) Two In-house Mechanical core drilling rigs • (ii) Recently procured hydraulic core drilling rig. • Total auger drilling completed 21,012 m @ 2948 holes • in the concession area. • Total Core drilling completed is 24,

Slide 45: Maninge Nice Area
Maninge Nice Area Amphibolite Gravel Bed Figure 1 Bore holes Figure 2 Figure 1 showing the 3D model of paleo channel with gravel bed ( > 10 cm) with ruby mineralisation in the two exploration blocks covering an area of 77 Sqkm. Figure 2 showing 3D model of primary mineralised Amphibolite body (Green

Slide 46: Reserve Estimation
Reserve Estimation SRK’s JORC complied report • Ore Reserves of Montepuez Ruby Mining in accordance with the JORC Code (2012) released on 22nd July 2015. • 467 million carats of indicated & 432 million carats of probable mineral reserve. • This relates to only about 10% of the license area explored

Slide 47: Mining
Mining Performance • Average stripping ratio of 1:5 (Ore:Waste) • Total ore mined until February 2017: 1.9 million tonnes. • Total waste mined until February 2017 : 9.1 million tonnes. • 9 pits actively mined. Gemfields Plc 47

Slide 48: MRM Progression
MRM Progression 2012 - 2016 Year 1: 90, 000 tons total rock handling and 1.9 million carats Year 2: 1.6 million tons total rock handling and 6.5 million carats Year 3: 3 million tons total rock handling and 8.4 million carats Year 4: 3.5 million tons total rock handling and 10.3 million carats. Year

Slide 49: Processing
Processing Upgradation Initially a 50 tph pilot wash plant was set up and the same was augmented to a 70 tph and more efficient capacity since its arrival in Nov 2012 with additions and modifications in the processing technology. Water treatment plant added to the circuit in August 2016. The newly u

Slide 50: Expertise in Sorting & Grading
Expertise in Sorting & Grading Sort House Presently, hand sorting is conducted in a highly secure environment by a team of highly skilled sorters. Gemfields has developed the worlds’ first grading system for rough rubies. This system has been widely accepted by customers as it helps them assurance o

Slide 51: Sort house upgradation
Sort house upgradation • A State-of-the-Art ruby recovery plant to be added to the circuit by Q1 2018. • To produce 20million carats by FY 2018-19. • Installation of four optical sorting units for the first time in the world. • Hands off sorting and classifying. • Total cost of the new recovery plan

Slide 52: Sustainability
Sustainability • The MRM Community Development Strategy (MRM-CDS) has been prepared with an objective to ensure that the local community benefits from the presence of MRM, in a way that is both sustainable and meaningful • MRM-CDS seeks to enhance the socio-economic standards of the surrounding comm

Slide 53: Community Development
Community Development Community and Social Investment • Further to the country’s economy benefitting from rubies as a natural Mozambican resource, we also strongly feel that the local communities should directly benefit from our presence. Our CSR programme is built around: Community development Ø He

Slide 54: Community Development
Community Development Community and Social Investment • Development of local farming associations and empowering women by forming Women’s chicken farming cooperative • Development of secondary schools and skills schools. • Development of Medical centres Namanhumbir Chicken Farm RAP Model House Nanhu

Slide 55: Environmental Conservation
Environmental Conservation Conservation funding We are committed to mining in a way that not only has the least impact on the environment but to leave it in a better state than what we found • Old pits to be re-filled, re-planted or filled with water and seeded with fish • No harmful chemicals used

Slide 56: Thinking Ahead
Thinking Ahead We have improved the living conditions of our employees by investing huge amount in camp infrastructure of about US$ 5 million. We have a robust training program to develop the skills of our employees and we certificate them for every course that they complete. The security personnel

Slide 57: Economic Impact
Economic Impact • Building Mozambican rubies as a valuable natural resource • Paying Taxes - MRM pays approximately 20% of the corporate tax generated in Cabo Delgado. • Generating foreign exchange for the country • Creating Employment - Most of our workforce is sourced from local villages and for t

Slide 58: Transparency
Transparency AUCTION RESULTS JUNE’14 DECEMBER’14 APRIL’15 JUNE’15 DECEMBER’15 JUNE’16 DECEMBER'16 (RUBY & CORUNDUM) AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION Dates 12-17 June’14 3-8 Dec’14 17-22 April’15 16-21 June’15 14-18 Dec’15 13-19 June’16 12-16 Dec'16 Location Singapore Singapore

Slide 59: Appendix
Appendix Gemfields Plc 59

Slide 60: Gemfields Locations
Gemfields Locations World’s leading supplier of responsibly sourced rare coloured gemstones Key 1 75% owned Kagem Emerald Mine 2 50% owned Kariba Amethyst Mine 3 75% owned Montepuez Ruby Mine Prospective licences Gemfields and Fabergé global offices 1 2 3 Gemfields Plc 60

Slide 61: Kagem JORC Resource and Reserves update
Kagem JORC Resource and Reserves update Target to increase production to more than 40mct per year over the next three years at Kagem • Measured, Indicated and Inferred Mineral Resource of 1.8 Beryl-II Beryl-I billion carats (“bct”) of emerald and beryl at an in-situ grade 50,000 Emerald Opex (RHS) P

Slide 62: Montepuez JORC Maiden Resource and Reserves
Montepuez JORC Maiden Resource and Reserves Target to achieve 20mct annual production within the next three years at Montepuez • Indicated and Inferred Mineral Resource of 467mct at in-situ ore grade of 62.3ct/t • Projected 21-year LoM producing a total of 432mct over LoM • Projected real cash flow

Slide 63: Company overview: Directors and Management
Company overview Directors and Management Analyst Forecasts Target Price BMO Capital Markets – 1 November 2016 80p FinnCap – 6 October 2016 100p Investec Securities – 31 August 2016 80p JP Morgan Cazenove – 29 September 2016 44p Graham Mascall Ian Harebottle Janet Boyce Macquarie – 30 September 2016

Slide 64: Gemstone Price Index
Gemstone Price Index Upper Fine Quality Gemstones Price Index: 1 - 1.5 Carat Lower Quality Commercial Gemstones Price Index: 1 – 1.5 Carat 2.00 3.5 1.80 3 1.60 1.40 2.5 1.20 2 1.00 0.80 1.5 0.60 1 0.40 0.5 0.20 0.00 0 2010 2011 2012 2013 2014 2015 2016 2010 2011 2012 2013 2014 2015 2015 Source: Gemg

Slide 65: Rough emerald and beryl sales (Commercial quality)
Rough emerald and beryl sales (Commercial quality) AUCTION RESULTS MAR ’10 MAR ’11 NOV ’11 JUN ’12 APR ’13 NOV ‘13 AUG’14 FEB ’15 NOV ’15 MAY ’16 SEP ‘16 (COMMERCIAL AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION QUALITY) Dates 11-15 Mar ‘10 10-14 Mar ‘11 21-

Slide 66: Rough emerald and beryl sales (Higher quality)
Rough emerald and beryl sales (Higher quality) JUL ‘09 NOV ‘09 JUL ‘10 DEC ‘10 JUL ‘11 MAR ‘12 NOV ‘12 JUL ‘13 FEB ‘14 NOV ‘14 SEPT ‘15 APR ’16 FEB’17 AUCTION RESULTS AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION 20-24 Jul 23-27 Nov 19-23 Jul

Slide 67: Rough ruby and corundum auctions
Rough ruby and corundum auctions (Mixed quality) AUCTION RESULTS JUNE ’14 DEC ‘14 APRIL ’15 JUNE ‘15 DEC ‘15 JUNE ‘16 DEC ’16 (RUBY & CORUNDUM) AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION Dates 12-17 June ‘14 3-8 Dec ‘14 17-22 April ‘15 16-21 June ‘15 14-18 Dec ‘15 13-19 June ‘16 12-16 D

Slide 68: Contact us
Contact us Gemfields Plc 4th Floor 1 New Burlington Place London W1S 2HR United Kingdom Tel: +44 (0)20 7518 3400 Fax: +44 (0) 20 7197 8193 Gemfields Plc
Source: Internet Archive copy of gemfieldsgroup.com
More decks from Gemfields Group Limited
FY2025 Earnings Presentation26 slides · Mar 26, 2026
H1 2025 Earnings Presentation74 slides · Sep 26, 2025
FY2024 Earnings Presentation30 slides · Apr 11, 2025
Investor Presentation (November 2024)39 slides · November 2024
FY2023 Earnings Presentation37 slides · Mar 25, 2024
FY2022 Earnings Presentation71 slides · Mar 24, 2023