Voltaic Strategic Resources Limited · ASX:VSR

Voltaic Strategic Resources — Incremental Oil and Gas — IPO Roadshow (March 2011)

21 slides from Voltaic Strategic Resources's IPO roadshow presentation, Mar 22, 2011

  1. Slide 1: Incremental Oil and Gas Initial Public Offer Roadshow

    Slide 1: Incremental Oil and Gas Initial Public Offer Roadshow

    Incremental Oil and Gas Limited INCREMENTAL OIL and GAS (asx: IOG) Initial Public Offer ROADSHOW March 22/23 2011 www.incrementaloilandgas.com 1

  2. Slide 2: Disclaimer and Important Notice

    Slide 2: Disclaimer and Important Notice

    DISCLAIMER AND IMPORTANT NOTICE This presentation contains forward looking statements that are subject to risk factors associated with oil and gas businesses. It is believed that the expectations reflected in these statements are reasonable but they may be affected by a variety of variables and chan

  3. Slide 3: Incremental Business model

    Slide 3: Incremental Business model

    Incremental Business model – A producing oil company with a cash flow focus – We acquire underperforming oilfields and increase production – Focus is Onshore California • Four projects: – Sheep Springs producing Oilfield – Round Mountain development project – Guijarral Hills development project – Ra

  4. Slide 4: Capital Structure

    Slide 4: Capital Structure

    Capital Structure • Formed 2009 as Private Company • Listed January 2011 after raising $5.3m at 30 cents. • 110.5m shares (Directors and management 42%) 92.8m unlisted options1 • Market cap about $40 million IOG Daily Closing Share Price Chart 0.40 • $5m CON notes (July 2011, 20 cents) 2 0.38 Share

  5. Slide 5: IOG Team

    Slide 5: IOG Team

    From left: IOG TEAM Asquith: 20 years CPA. MacDonald: 13 years in Senate, LLB CALIFORNIA Cronin: No 2 in Woodside (23 years) M Pet Eng, Stowell: Founder of Anvil and Mawson West, CPA Over 25 years in McGann: 40 years geologist worldwide, CPG California CFO DIRECTORS

  6. Slide 6: The team have done it before...

    Slide 6: The team have done it before...

    The team have done it before... SELMO FIELD PROJECTED PRODUCTION PROFILE • INCREMENTAL PETROLEUM formed 2005. 5000 4500 • Raised $61m, bought second largest oilfield in 4000 3500 3000 TURKEY BOPD 2500 • Built production from 1500 bopd to 2000 bopd 2000 1500 • Commercialized West Turkey Gas 1000 500

  7. Slide 7: Why California?

    Slide 7: Why California?

    Why California ? – Significant bypassed oil left by early producers – Few mid-sized oil companies operate in California – Cheap and competitive service suppliers – Excellent Fiscal regime Sacramento Basin The San Joaquin Basin has: • 10 times Australia’s reserves • 150% Australia’s production San Jo

  8. Slide 8: Why California?

    Slide 8: Why California?

    Why California ? – Significant bypassed oil left by early producers – Few mid-sized oil companies operate in California – Cheap and competitive service suppliers – Excellent Fiscal regime 8

  9. Slide 9: Why California?

    Slide 9: Why California?

    Why California ? – Significant bypassed and undeveloped oil reserves left by early producers – Few mid-sized oil companies, the innovators in the oil business, operate in California – Cheap and competitive service suppliers – Excellent Fiscal regime DRILLING WORKOVER CEMENTING LOGGING UNITS RIGS RIG

  10. Slide 10: Why California?

    Slide 10: Why California?

    Why California ? – Significant bypassed oil left by early producers – Few mid-sized oil companies operate in California – Cheap and competitive service suppliers – Excellent Fiscal regime Comparison of Fiscal Terms Turkey Royalties 5-10% lower Spain Argentina USA Portugal than Texas G. Mexico New Ze

  11. Slide 11: Incremental Projects

    Slide 11: Incremental Projects

    Incremental Projects • PRODUCING SHEEP SPRINGS •SHALLOW ROUND MOUNTAIN •HIGH PRODUCTIVITY GUIJARRAL HILLS •RAVEN PASS Exploration 11

  12. Slide 12: Sheep Springs Oilfield

    Slide 12: Sheep Springs Oilfield

    Sheep Springs Oilfield 300 Daily Field Production 250 • 100% owned since January 2010 200 BOEPD 150 • Revenue $500k/month 100 • 4 Undeveloped reservoirs 50 0 Q4 2009 Q1 2010 Q2 2010 Q3 2010 Q4 2010 BOPD GAS BOEPD 12

  13. Slide 13: Sheep Springs Oilfield

    Slide 13: Sheep Springs Oilfield

    Sheep Springs Oilfield 300 Daily Field Production 250 • 100% owned since January 2010 200 BOEPD 150 • Revenue $500k/month 100 • 4 Undeveloped reservoirs 50 0 Q4 2009 Q1 2010 Q2 2010 Q3 2010 Q4 2010 BOPD GAS BOEPD 13

  14. Slide 14: Sheep Springs Oilfield (3)

    Slide 14: Sheep Springs Oilfield (3)

    Sheep Springs Oilfield (3) Shallow heavier oil (15-17 API) Produced nearby Steam pilot in H1 2011 14

  15. Slide 15: Round Mountain

    Slide 15: Round Mountain

    Round Mountain • Field has produced 110m barrels • Shallow, 18-20° API gravity oil • 100% Working Interest • Production in the total RM oilfield now 8000 bopd 15

  16. Slide 16: SMOOT 1, Round Mountain

    Slide 16: SMOOT 1, Round Mountain

    SMOOT 1, Round Mountain Show Pay Sand Oil • >550’ shows • Over 100’ of net pay • Cores and high tech logs • Testing >100 bopd from 40’ • Will form basis of full development plan 100 ft 16

  17. Slide 17: Guijarral Hills

    Slide 17: Guijarral Hills

    Guijarral Hills • Prolific Oilfield in 1950’s • Light oil • 80-100% Working Interest 17

  18. Slide 18: Guijarral Hills (cont)

    Slide 18: Guijarral Hills (cont)

    Guijarral Hills (cont) • Potential for high rates • Still acquiring leases. Plan to drill mid year WAS NEVER PRODUCED IN 1950’s 18

  19. Slide 19: Raven Pass

    Slide 19: Raven Pass

    Raven Pass • Flowed light oil in 1942. Not drilled since • 200 m barrel potential • True wildcat 19

  20. Slide 20: Unrisked Reserves and Resources

    Slide 20: Unrisked Reserves and Resources

    Unrisked Reserves and Resources PROJECT 2P/2C RESERVES SOURCE MMB SHEEP SPRINGS 2.8 2P RPS, certified ROUND 4.1 2C RIGEL MOUNTAIN GUIJARRAL HILLS 1.8 2C RIGEL 20

  21. Slide 21: Projected 12 Month News Flow

    Slide 21: Projected 12 Month News Flow

    Projected 12 Month News Flow • Drill Sheep Springs well • Drill Round Mountain vertical well • Declare after tax profit in first year • Drill two wells Round Mountain • Re-enter old well Guijarral Hills • Drill two wells Round Mountain • Drill new well Guijarral Hills (optional) • Raven Pass seismic

Source: Internet Archive copy of voltaicresources.com

More decks from Voltaic Strategic Resources Limited

All 28 Voltaic Strategic Resources decks