Voltaic Strategic Resources Limited · ASX:VSR
Voltaic Strategic Resources — Incremental Oil and Gas — IPO Roadshow (March 2011)
21 slides from Voltaic Strategic Resources's IPO roadshow presentation, Mar 22, 2011

Slide 1: Incremental Oil and Gas Initial Public Offer Roadshow
Incremental Oil and Gas Limited INCREMENTAL OIL and GAS (asx: IOG) Initial Public Offer ROADSHOW March 22/23 2011 www.incrementaloilandgas.com 1

Slide 2: Disclaimer and Important Notice
DISCLAIMER AND IMPORTANT NOTICE This presentation contains forward looking statements that are subject to risk factors associated with oil and gas businesses. It is believed that the expectations reflected in these statements are reasonable but they may be affected by a variety of variables and chan

Slide 3: Incremental Business model
Incremental Business model – A producing oil company with a cash flow focus – We acquire underperforming oilfields and increase production – Focus is Onshore California • Four projects: – Sheep Springs producing Oilfield – Round Mountain development project – Guijarral Hills development project – Ra

Slide 4: Capital Structure
Capital Structure • Formed 2009 as Private Company • Listed January 2011 after raising $5.3m at 30 cents. • 110.5m shares (Directors and management 42%) 92.8m unlisted options1 • Market cap about $40 million IOG Daily Closing Share Price Chart 0.40 • $5m CON notes (July 2011, 20 cents) 2 0.38 Share

Slide 5: IOG Team
From left: IOG TEAM Asquith: 20 years CPA. MacDonald: 13 years in Senate, LLB CALIFORNIA Cronin: No 2 in Woodside (23 years) M Pet Eng, Stowell: Founder of Anvil and Mawson West, CPA Over 25 years in McGann: 40 years geologist worldwide, CPG California CFO DIRECTORS

Slide 6: The team have done it before...
The team have done it before... SELMO FIELD PROJECTED PRODUCTION PROFILE • INCREMENTAL PETROLEUM formed 2005. 5000 4500 • Raised $61m, bought second largest oilfield in 4000 3500 3000 TURKEY BOPD 2500 • Built production from 1500 bopd to 2000 bopd 2000 1500 • Commercialized West Turkey Gas 1000 500

Slide 7: Why California?
Why California ? – Significant bypassed oil left by early producers – Few mid-sized oil companies operate in California – Cheap and competitive service suppliers – Excellent Fiscal regime Sacramento Basin The San Joaquin Basin has: • 10 times Australia’s reserves • 150% Australia’s production San Jo

Slide 8: Why California?
Why California ? – Significant bypassed oil left by early producers – Few mid-sized oil companies operate in California – Cheap and competitive service suppliers – Excellent Fiscal regime 8

Slide 9: Why California?
Why California ? – Significant bypassed and undeveloped oil reserves left by early producers – Few mid-sized oil companies, the innovators in the oil business, operate in California – Cheap and competitive service suppliers – Excellent Fiscal regime DRILLING WORKOVER CEMENTING LOGGING UNITS RIGS RIG

Slide 10: Why California?
Why California ? – Significant bypassed oil left by early producers – Few mid-sized oil companies operate in California – Cheap and competitive service suppliers – Excellent Fiscal regime Comparison of Fiscal Terms Turkey Royalties 5-10% lower Spain Argentina USA Portugal than Texas G. Mexico New Ze

Slide 11: Incremental Projects
Incremental Projects • PRODUCING SHEEP SPRINGS •SHALLOW ROUND MOUNTAIN •HIGH PRODUCTIVITY GUIJARRAL HILLS •RAVEN PASS Exploration 11

Slide 12: Sheep Springs Oilfield
Sheep Springs Oilfield 300 Daily Field Production 250 • 100% owned since January 2010 200 BOEPD 150 • Revenue $500k/month 100 • 4 Undeveloped reservoirs 50 0 Q4 2009 Q1 2010 Q2 2010 Q3 2010 Q4 2010 BOPD GAS BOEPD 12

Slide 13: Sheep Springs Oilfield
Sheep Springs Oilfield 300 Daily Field Production 250 • 100% owned since January 2010 200 BOEPD 150 • Revenue $500k/month 100 • 4 Undeveloped reservoirs 50 0 Q4 2009 Q1 2010 Q2 2010 Q3 2010 Q4 2010 BOPD GAS BOEPD 13

Slide 14: Sheep Springs Oilfield (3)
Sheep Springs Oilfield (3) Shallow heavier oil (15-17 API) Produced nearby Steam pilot in H1 2011 14

Slide 15: Round Mountain
Round Mountain • Field has produced 110m barrels • Shallow, 18-20° API gravity oil • 100% Working Interest • Production in the total RM oilfield now 8000 bopd 15

Slide 16: SMOOT 1, Round Mountain
SMOOT 1, Round Mountain Show Pay Sand Oil • >550’ shows • Over 100’ of net pay • Cores and high tech logs • Testing >100 bopd from 40’ • Will form basis of full development plan 100 ft 16

Slide 17: Guijarral Hills
Guijarral Hills • Prolific Oilfield in 1950’s • Light oil • 80-100% Working Interest 17

Slide 18: Guijarral Hills (cont)
Guijarral Hills (cont) • Potential for high rates • Still acquiring leases. Plan to drill mid year WAS NEVER PRODUCED IN 1950’s 18

Slide 19: Raven Pass
Raven Pass • Flowed light oil in 1942. Not drilled since • 200 m barrel potential • True wildcat 19

Slide 20: Unrisked Reserves and Resources
Unrisked Reserves and Resources PROJECT 2P/2C RESERVES SOURCE MMB SHEEP SPRINGS 2.8 2P RPS, certified ROUND 4.1 2C RIGEL MOUNTAIN GUIJARRAL HILLS 1.8 2C RIGEL 20

Slide 21: Projected 12 Month News Flow
Projected 12 Month News Flow • Drill Sheep Springs well • Drill Round Mountain vertical well • Declare after tax profit in first year • Drill two wells Round Mountain • Re-enter old well Guijarral Hills • Drill two wells Round Mountain • Drill new well Guijarral Hills (optional) • Raven Pass seismic
Source: Internet Archive copy of voltaicresources.com
More decks from Voltaic Strategic Resources Limited
Shareholder Meeting (June 2024)16 slides · Jun 5, 2024
Shareholder Meeting (May 2024)15 slides · May 31, 2024
Investor Presentation (December 2023)30 slides · Dec 11, 2023
Investor Presentation (July 2023)37 slides · Jul 27, 2023
Investor Presentation (May 2023)28 slides · May 19, 2023
Investor Presentation (April 2023)26 slides · Apr 15, 2023