  1. Slide 1: Dakota Access, LLC Crude Oil Pipeline Project Iowa Informational Meetings

    Slide 1: Dakota Access, LLC Crude Oil Pipeline Project Iowa Informational Meetings

    Dakota Access, LLC Crude Oil Pipeline Project Iowa Informational Meetings

  2. Slide 2: Agenda

    Slide 2: Agenda

    Agenda • Project Overview • Project Benefits to Iowa • Project Purpose and Need • Project Commitments • Project Footprint • Facility Requirements • What Landowners Can Expect • Project Iowa Permitting Timeline • Conclusion 2

  3. Slide 3: Project Map

    Slide 3: Project Map

    Project Map Project() = DAPL x South Dakota y= Se ENERGY TRANSFER | 3

  4. Slide 4: Iowa Project Map

    Slide 4: Iowa Project Map

    lowa Project Map : ee _ {DAPL Project] — Bs Bo = boa Fis ae + lowa * La : SS CENERGY TRANSFER | 4

  5. Slide 5: Project Overview

    Slide 5: Project Overview

    Project Overview New Pipeline to Deliver 100% Domestically Produced Crude to U.S. Refineries. 1,134 mile pipeline system to safely carry up to 570,000 barrels per day of U.S. light sweet crude (450,000 bpd initially) from rapidly expanding Bakken and Three Forks production areas through the states

  6. Slide 6: Project Benefits

    Slide 6: Project Benefits

    Project Benefits  $3.8 Billion Investment Into the Overall US Economy  $1.04 billion Iowa capital investment ($630 million direct spending)  Provide Valuable Tax Dollars for Short- and Long-Term. The pipeline will translate into millions in state and local revenues during the construction phase,

  7. Slide 7: Project Benefits

    Slide 7: Project Benefits

    Project Benefits  Up to 12,000 American Jobs along the Route. Millions of hours of labor will be needed during the construction phase, putting welders, mechanics, electricians, pipefitters, heavy equipment operators and others within the heavy construction industry to work.  Approximately 4,000 Co

  8. Slide 8: Project Purpose and Need

    Slide 8: Project Purpose and Need

    Project Purpose and Need Improves Overall Safety to the Public and Environment. The Dakota Access Pipeline will reduce crude oil shipped by truck and rail, increasing public safety. Pipelines are the safest and most efficient means to transport crude oil, according to statistics published by the U.

  9. Slide 9: Project Commitments

    Slide 9: Project Commitments

    Project Commitments Construction Commitment. Pipeline will meet or exceed all applicable requirements for safety systems and will be designed, constructed, operated and maintained in accordance with all applicable State and Federal standards and regulations. Safety and Monitoring Commitment. We wi

  10. Slide 10: Project Commitments

    Slide 10: Project Commitments

    Project Commitments We know your land is a valuable natural resource, and the care with which we treat land and topsoil is of our utmost priority – after all, it’s your livelihood. We will work to minimize any effects from land surveys and pipeline construction. We intend to work diligently to bui

  11. Slide 11: Project Footprint

    Slide 11: Project Footprint

    Project Footprint Right of Way. The pipeline will parallel existing pipelines, power lines, or existing roads where possible. During construction, an additional 25–100 feet of workspace may be needed adjacent to a 50-foot permanent easement. Pipeline Footprint. The pipeline will be covered by a mi

  12. Slide 12: Facility Requirements

    Slide 12: Facility Requirements

    Facility Requirements Pipeline Facilities to Be Constructed in Iowa COUNTY APPROX. LENGTH Lyon County 10.55 miles Sioux County 32.68 miles O’Brien County 10.86 miles Cherokee County 18.16 miles Buena Vista County 28.41 miles Sac County 0.32 miles Calhoun County 30.77 miles Webster County 19.11 miles

  13. Slide 13: What Landowners Can Expect

    Slide 13: What Landowners Can Expect

    What Landowners Can Expect Next Steps. Beginning after IUB Open House Meetings, Dakota Access personnel will begin contacting landowners in person (and by phone) and present a written offer for the permanent easement, temporary easement/workspace and anticipated impacts (including damages to crops)

  14. Slide 14: What Landowners Can Expect

    Slide 14: What Landowners Can Expect

    What Landowners Can Expect Permanent Easement. Dakota Access will seek to acquire a 50-foot permanent easement. Payments will be based upon the valuation per acre as presented on the following slide.  Payments will be made based on 100% of valuation Temporary Easement. Dakota Access may seek a te

  15. Slide 15: What Landowners Can Expect

    Slide 15: What Landowners Can Expect

    What Landowners Can Expect Payments  Easements  As part of the landowner’s rights, once an easement is executed, terms and conditions agreed upon and the money or payment for the easement finalized, the landowner has 7 days to cancel the terms of the deal (Iowa Code Section 479.B24). Therefore, D

  16. Slide 16: What Landowners Can Expect

    Slide 16: What Landowners Can Expect

    What Landowners Can Expect 16

  17. Slide 17: Iowa Permitting Timeline

    Slide 17: Iowa Permitting Timeline

    Project Iowa Permitting Timeline • INITIAL MEETING w/ IUB STAFF JULY 29, 2014 • PROJECT INFORMATIONAL MEETINGS DECEMBER 2014 • PIPELINE PERMIT FILED JANUARY 2015 • PIPELINE PERMIT DECISION 3rd QUARTER 2015 • PIPELINE CONSTRUCTION BEGINS Upon Permit Issuance • PIPELINE PROJECTED IN-SERVICE 4th QUARTE

  18. Slide 18: DAPL Commitment to Landowners

    Slide 18: DAPL Commitment to Landowners

    DAPL Commitment to Landowners • Treat all landowners with respect, honesty and integrity. It is our intent to live up to our promises during and after construction and throughout operations. At any time you do not feel we are living up to our obligations, please call 844-708-2635. • Safety is DAPL’s