Maple Gold Mines Ltd · TSXV:MGM
Maple Gold Mines — Investor Presentation (November 2024)
27 slides from Maple Gold Mines's investor presentation, November 2024
Slide 1: Corporate Presentation
Corporate Presentation TSX.V: MGM OTCQB: MGMLF NOVEMBER 2024
Slide 2: Disclaimer
DISCLAIMER Cautionary Notes Regarding Forward-Looking Statements This Corporate Presentation (“Presentation”) includes “forward-looking information” and “forward-looking statements” (collectively referred to as “forward-looking statements”) within the meaning of applicable Canadian securities legisl
Slide 3: Maple Gold Investment Highlights
EXPLORING MAPLE GOLD Maple Gold Investment Highlights 100% control of a ~400 km2 District-Scale Property with: 1. Established ~3.0 Moz Gold Mineral Resource1 (Douay) 2. Past-Producing High-Grade Mining Complex (Joutel) 3. Significant Blue-Sky Exploration Potential Strategically Located in Québec’s A
Slide 4: Strategic Transformation and Achievements
STRATEGIC TRANSFORMATION AND ACHIEVEMENTS 1-Year Milestones Achieved Go-Forward Strategy and Growth Catalysts Financial and Strategic Data-driven exploration approach focused on adding economic gold ounces and making new discoveries Negotiated a company-friendly restructuring transaction providing 1
Slide 5: JV Restructuring & Financing Transaction Highlights
JV RESTRUCTURING & FINANCING TRANSACTION HIGHLIGHTS Maple Gold gains 100% control and a clear path to advance Douay/Joutel according to its own timeline without near-term dilution risk at the project level Upon Maple Gold achieving key development milestones1, Agnico Eagle has the option to purchase
Slide 6: Key Deposits in the Region
KEY DEPOSITS IN THE REGION Located Among Abitibi’s Gold Giants Parallel Alignment with Major Gold- Bearing Structures Deep, mantle-tapping structure (Casa Berardi) w/porphyry emplacement, lamprophyre and carbonatite in core Warp in structure over kilometric scale Multiple styles of mineralization on
Slide 7: Organic Growth Pipeline
ORGANIC GROWTH PIPELINE Objectives: Economic Gold Ounces and Project Development Low cost + Moderate risk = Douay High Rewards Priority 1: Douay Moderate cost + Low risk = Empiric Systematic Geological compilation Eagle-Telbel High Rewards Increasing Resources (continuity at depth) Under-evaluated h
Slide 8: Finding Giants: AEM's Malartic and Odyssey
FINDING GIANTS AEM’S MALARTIC AND ODYSSEY Odyssey Deposits Implications for the Douay Project Odyssey Gold Deposits Douay Gold Features (AEM) Deposits (MGM) Major Structures/Breaks Cadillac Larder Lake fault Casa Berardi fault Deep Seated, Mantle Tapping Yes Yes Structure Multiple Favourable Host Ro
Slide 9: Finding Giants: AEM's Malartic and Odyssey
FINDING GIANTS AEM’S MALARTIC AND ODYSSEY The Douay-Joutel JV was based on the Canadian Malartic JV Partnership Canadian Malartic is now one of Canada’s largest gold mines 1.9 Moz 6.4 Moz NW-SE vertical longitudinal section (all zones) showing distribution of below-pit-shell underground Canadian Mal
Slide 10: Douay Conceptual Open Pit Mine Plan (2022 MRE)
DOUAY CONCEPTUAL OPEN PIT MINE PLAN (2022 MRE) One of Quebec’s Largest Undeveloped Gold Resources 21% conversion from Inferred to Indicated based on only Indicated: 6% of total metres drilled (SLR 2022) 10.0 Mt @ 1.59 g/t Au for 511 koz Au Inferred: 76.7 Mt @ 1.02 g/t Au for 2.53 Moz Au The 2022 MRE
Slide 11: Vectoring to Improve Targeting
VECTORING TO IMPROVE TARGETING Lithology Layering + Porosity + Reactivity Rock Features + Structures Lithostructural Structural Geology Fold + Faults + Fractures Rock Structures + Ore Traps Geophysics Physical Properties (magnetic and electrical) Underground Mapping Geochemistry Geophysics Gold Geoc
Slide 12: Setting the Stage for Transformation
SETTING THE STAGE FOR TRANSFORMATION Winter 2023: Compilation and evaluation of all previous data and assays Douay West Plan Map Douay West Plan Map N Figure 1: Plan Map showing the gold assays from drill holes at the Douay West zone. Figure 2: Apparent structures interpreted from Mag-survey and Lid
Slide 13: Setting the Stage for Transformation: Winter 2024
SETTING THE STAGE FOR TRANSFORMATION Progression - Winter 2024: Building lithostructural layers based on selective drill hole relogging with new deposit-wide cross-sections, longitudinal sections and level plans Douay West Level Plan Douay West- Cross Section 100m Mafic Intrusive Mafic Volcanic Grap
Slide 14: Turning Challenges into Insights
TURNING CHALLENGES INTO INSIGHTS Spring 2024: Robust lithostructural layer with structural constraints to predict gold mineralisation Geological Map - Douay West Plan Map - Douay West N Open Deposit Site Lithological + Structural Interpretation Figure 1: Geological map showing lithostructural contro
Slide 15: Douay West Zone
DOUAY WEST ZONE Douay West Zone (DW): Highest Drilling Density 190 holes for a total of 57,512m drilled core Metal Content Resource Type Tonnes (Mt) Grade (g/t Au) (K oz Au) OP-Indicated 4.2 2.13 286 OP-Inferred 3.7 1.39 169 UG-Inferred 1.4 1.77 _ 82__ 537 Table: Resource Estimation for Douay West z
Slide 16: Douay 531 Zone
DOUAY 531 ZONE Douay 531 Zone (531): Best drill intercept showing 28m at 8.8 g/t Au 65 holes for a total of 27,630m drilled core Metal Content Resource Type Tonnes (Mt) Grade (g/t Au) (K oz Au) OP-Indicated 0.6 2.85 58 OP-Inferred 6.2 1.47 291 UG-Inferred 1.4 1.8 __79__ 428 Table: Resource estimatio
Slide 17: Identifying Structural Controls
IDENTIFYING STRUCTURAL CONTROLS Unveiling Douay Deformation Corridor: Dextral Strike-Slip Fault Showing Delta-Type Deformation TSX.V: MGM OTCQB: MGMLF NOVEMBER 2024 | 17
Slide 18: Geochemical Reclassification & Vectoring
GEOCHEMICAL RECLASSIFICATION & VECTORING Geochemical Classification: Leveraging Extensive Multi-Element Assay Data Crucial reclassification that enhances understanding of the structural system Geochemistry can now be used as a mineralization vector, guiding us towards potential mineral-rich areas TS
Slide 19: Agnico Eagle's 1st Gold Mine: Joutel Mine Complex
AGNICO EAGLE’S 1ST GOLD MINE: JOUTEL MINE COMPLEX (1974- 1993) Joutel Mine Site Entrance Telbel Headframe Eagle Mine Mill Complex Note: Historical photos. All surface infrastructure has been reclaimed. TSX.V: MGM OTCQB: MGMLF OCTOBER 2024 | 19
Slide 20: Joutel Long Section Shows Significant Drilling Gaps
JOUTEL LONG SECTION SHOWS SIGNIFICANT DRILLING GAPS A High-Grade Restart Opportunity with Excellent Near-Mine Expansion Potential PAGE 20 TSX.V: MGM OTCQB: MGMLF NOVEMBER 2024 | 20
Slide 21: The Douay One-Year Transformation
SETTING THE STAGE THE DOUAY ONE-YEAR TRANSFORMATION WHERE WE STARTED? WHAT WE DID? WHAT WE LEARNED? 48 Years of exploration work on the Overhauled drillhole database; Major advancements in terms of Project (1976-2024) additional data entry and digitizing understanding of Douay geology of historic re
Slide 22: Developing Drill Targets for Fall / Winter 2024
DEVELOPING DRILL TARGETS FOR FALL / WINTER 2024 Ranking of Potential Zones on the Douay/Joutel Property Level 1: Expansion of Economic Gold Ounces Level 2: Confirmation of ore-bodies continuity Level 3: Investigation of mineralised zones Level 4: Evaluation of potential zones N Mineral Reserves 11 M
Slide 23: Project Infrastructure
PROJECT INFRASTRUCTURE Core logging facilities Core logging facilities Headframe (Circa 1997) Full-service 46-person camp Mine Dry TSX.V: MGM OTCQB: MGMLF NOVEMBER 2024 | 23
Slide 24: Experienced Management / Board / Advisors
EXPERIENCED MANAGEMENT / BOARD / ADVISORS Senior Management Team Kiran Patankar Michael Rukus Ian Cunningham- Josh Pelletier, P.geo. Wilma Lee Stephane Tremblay President, CEO & Director Interim CFO Dunlop, P.Eng. Chief Geologist VP HR, Compliance & Project Manager VP, Technical Services Corp Secret
Slide 25: Market Snapshot
MARKET SNAPSHOT Capital Structure (as of September 30, 2024) Research Coverage Shares Outstanding 376.2M Michael Gray Options1 15.6M Fully Diluted2 396.0M Lauren McConnell Market Data (as of November 1, 2024) Mark Reichman 52-week high/low share price C$0.09/ C$0.05 Basic Market Capitalization ~C$30
Slide 26: Maple Gold Summary
MAPLE GOLD SUMMARY Pure Canadian gold play in a top tier jurisdiction (Québec) with excellent infrastructure Established ~3.0 Moz gold resource1 (Douay) and high-grade, past-producing mine trend (Joutel) Highly prospective ~400 km² property package with 55 km of strike length on the Casa Berardi Bre
Slide 27: Contact Information
CONTACT INFORMATION MAPLE GOLD MINES LTD. 1111 WEST HASTINGS STREET, SUITE 600 VANCOUVER, BC, V6E 2J3, CANADA PHONE: +1 (647) 265-8688 EMAIL: INFO@MAPLEGOLDMINES.COM WEBSITE: WWW.MAPLEGOLDMINES.COM Northern lights at the Douay Gold Project TSX.V: MGM OTCQB: MGMLF
Maple Gold Mines — Investor Presentation (November 2024) on 6ix