Basin Energy Limited · ASX:BSN

Basin Energy — Investor Presentation (June 2023)

22 slides from Basin Energy's investor presentation, Jun 19, 2023

  1. Slide 1: Investor Presentation: Exploring for High Grade Uranium in the Athabasca Basin

    For personal use only Investor Presentation Exploring for High Grade Uranium in the Athabasca Basin June 2023 ASX : BSN

  2. Slide 2: Disclaimer & Competent Persons Statement

    Disclaimer & Competent Persons Statement Disclaimer This presentation has been prepared by Basin Energy Limited (“Basin Energy” or the “Company”) to assist in informing interested parties about the Company and its progress. It should not be For personal use only considered as an offer or invitation

  3. Slide 3: Why invest in Basin Energy?

    Why invest in Basin Energy? Direct exposure to high grade uranium within Experienced and dedicated team with For personal use only the world class uranium mining district of the relevant uranium exploration and development Athabasca Basin, Saskatchewan, Canada – a top track record three global urani

  4. Slide 4: Board and Management

    Board and Management Blake Steele - Non-Executive Chairman Blake Steele is an experienced metals and mining industry executive and director with extensive knowledge across public companies and For personal use only capital markets. He was formerly President and Chief Executive Officer of Azarga Uran

  5. Slide 5: Pureplay Uranium in a proven neighborhood

    Pureplay Uranium in a proven neighborhood For personal use only Pureplay uranium exploration company Direct exposure to high grade uranium within the with interests in three projects. Ongoing active world class uranium mining district of the Athabasca exploration Basin, Saskatchewan, Canada – a top

  6. Slide 6: Athabasca Basin discovery success

    Additional recent Athabasca Basin discovery success exploration success includes Athabasca Basin discoveries have delivered significant shareholder returns, • 92 Energy’s Gemini discovery¹43m @ even through downturns For personal use only 0.6% U3O8 (incl 6m @ 2.2% U308) • Baselode Energy’s ACKIO dis

  7. Slide 7: Exploring for Athabasca Basin uranium

    Exploring for Athabasca Basin uranium Exploring for Athabasca uranium For personal use only style mineralisation, with basement hosted (Arrow style) and unconformity hosted targets (McArthur River style) Basin’s projects share the same fundamentals; Geological settings (lithology, structure) Evidenc

  8. Slide 8: Basin Energy in the Athabasca

    For personal use only Basin Energy in the Athabasca 8

  9. Slide 9: Geikie

    Geikie Shallow exploration strategically located in proximity to recent high-grade, shallow uranium discoveries For personal use only Tenure • 339km2 landholding located 7km southeast of the present edge of the Athabasca Basin and 10km west of highway 905 • Adjacent to 92 Energy’s Gemini discovery 4

  10. Slide 10: Radiometric and magnetic data – Confirms favourable structural setting

    Radiometric and magnetic data – Confirms favourable structural setting For personal use only 4 “deep-seated” regionally significant Tabbernor aged faults identified • Deemed suitable for fluid conduits, allowing deep circulation of uranium ore-forming fluids • Structural analysis from major deposits

  11. Slide 11: Maximising historical exploration data

    Maximising historical exploration data Drill hole logs identified for three historic exploration holes For personal use only conducted within the Geikie Project • Drilling was for base metal exploration in the early 1970’s • Strong lithological similarities to observed to those of proximal recent si

  12. Slide 12: AEM mapping suitable uranium host sequence?

    AEM mapping suitable uranium host sequence? For personal use only • A strong coherent northeast trending conductor, classified as a primary target, within the southern half of the Project is clearly defined in preliminary airborne electromagnetic data • A series of splays and offsets of this conduct

  13. Slide 13: AEM mapping suitable uranium host sequence?

    AEM mapping suitable uranium host sequence? For personal use only • A strong coherent northeast trending conductor, classified as a primary target, within the southern half of the Project is clearly defined in preliminary airborne electromagnetic data • A series of splays and offsets of this conduct

  14. Slide 14: 2023 Summer drilling

    2023 Summer drilling For personal use only • Initial 2,000 metres drilling planned for 8 drill holes • Drilling to target shallow prospects, deemed favourable for high grade uranium • Three prospects selected over the 15km trend for initial testing • Preston Creek • Hourglass Lake • Aero Lake • Firs

  15. Slide 15: Preston Creek Drilling

    Preston Creek Drilling For personal use only • Eastern most target within the 15km trend • 5 drill holes proposed • Drilling targeting; • Multiple significant structures including regional deep seated Tabbernor faults • Offsets and disruptions to a steep dipping VTEM Conductor • “Stacked” subparalle

  16. Slide 16: Aero and Hourglass Lake Drilling

    Aero and Hourglass Lake Drilling For personal use only • 3 drill holes proposed • Hourglass Lake drilling targeting; • Interpreted disruption of a steeply dipping VTEM conductor, where an apparent 500 metre offset is observed • Weakening of the modelled response from the VTEM conductor, interpreted

  17. Slide 17: Basin Energy in the Athabasca

    Basin Energy in the Athabasca Three projects located in proximity to world-class high-grade uranium discoveries and mining For personal use only operations Geikie • Shallow targets amenable to rapid exploration in an overlooked part of the district • Historic surface geochemistry demonstrates presen

  18. Slide 18: North Millennium

    North Millennium Basement conductor trend is an interpreted extension of the Mother fault hosting the Millennium Deposit For personal use only Tenure • Located 40km southwest of Cameco’s flagship McArthur River Mine (674.9 Mlbs U3O8 @ 16.9%)1 and 7km immediately north of the Cameco’s Millennium depo

  19. Slide 19: Marshall

    Marshall Strong magnetic and conductive structure interpreted as a significant unconformity-type uranium target For personal use only Tenure • 112km2 landholding located 11km west of the Millennium Deposit in the southeast corner of the Athabasca Basin History • Between 1979 and 2009 soil geochemist

  20. Slide 20: Corporate Overview

    1. Cash at March Quarterly 2. 5.0m options exercisable at $0.25 to Board & Management expiring 3 years from the date of issue Corporate Overview subject to 2 years escrow, 5.3m options exercisable at $0.25 to Advisors expiring 3 years from the date of issue subject to 2 years escrow & 3.0m options e

  21. Slide 21: Project Ownership & Joint Venture Structure

    Project Ownership & Joint Venture Structure Low risk staged earn-in via value adding stages, with the flexibility to accelerate or stop For personal use only North Millennium & Geikie (Earn up to 80%) Marshall (100%) Stage 1 - Completed Stage 2 - Underway Stage 3 Stage 1 - Completed Timing/ 24 month

  22. Slide 22: For personal use only

    For personal use only Pete Moorhouse Chloe Hayes M: +61 (0) 7 3667 7449 M: +61 (0) 458 619 317 E: pete.m@basinenergy.com.au E: chloe@janemorganmanagement.com.au This presentation has been authorised for release by the Basin Energy Board

Basin Energy — Investor Presentation (June 2023) on 6ix