Ptt Exploration & Production Plc · SET:PTTEP
Ptt Exploration & Production — ESG Presentation
22 slides from Ptt Exploration & Production's sustainability presentation
Slide 1: Climate Management Plan
Climate Management Plan Energy Partner of Choice
Slide 2: Climate Management Process
Climate Management Process Energy Partner of Choice
Slide 3: PTTEP Climate Change Management Process
PTTEP Climate Change Management Process “all E&P phases, existing & new operations under PTTEP operational control shall implement this process” Process Driver “External “Internal Driver” “External Driver” Top Management & Corporate Oversight Driver” Energy Partner of Choice
Slide 4: Climate Management Plan
Climate Management Plan Climate Management Plan Mitigation Adaptation Resilience Actions to reduce or Actions to adjust society Actions related to prevent emission of GHGs. and system to withstand adaptation effort, mostly in the climate change terms of community, Mitigation can mean using impact. s
Slide 5: Climate-Related Risks
Climate-Related Risks Energy Partner of Choice
Slide 6: Physical Risks
Physical Risks What are Physical Risks? Scenario Analysis ** RCP = Representative Concentration Pathway “Physical risks” = risks arising from the impacts of a changing climate on corporations due to RCP 2.6 changes in the probability and intensity of an ‘aggressive’ mitigation that may lead to (extr
Slide 7: Physical risk scenarios and assumptions
Physical risk scenarios and assumptions — = Overview Heavy a 5 Hazard precipitation Droughts Heatwaves Tropical cyclones Water risks Hotspot — Hotspot — Seaneio Methodology Trend and scenario analysis frequency intensity analysis analysis analysis ¥ . Intergovernmental Panel on Climate Change (IPCC)
Slide 8: General approach
General approach A four-step approach was used to assess the physical climate risks. ° Baseline exposure and vulnerability assessment for five physical risks . Describing how climate risks emerge from weather hazards A trends-analysis of historical ERA-Interim data using a Theil-Sen regression estim
Slide 9: Physical Risks in Conclusion by Assets
Physical Risks in Conclusion by Assets Risk Type Asset Impacted Risk Level Physical Risk Heatwaves 2026-2035 GBN, GBS, ART, S1& L22/43, SPH, ZOC, Sarawak Medium 2035-2050 GBN, GBS, ART, S1& L22/43, SPH, ZOC, Sarawak Medium Heavy Precipitation 2026-2035 PSB, RSB, S1& L22/43, Thakita, ZOC, Sarawak, BO
Slide 10: Transition Risks
Transition Risks What are Transition Risks? Scenario Analysis “Transition risks” = those risks resulting from a transition IPCC to a 2°C economy. According to the Task Force on Intergovernmental Panel on Climate Change Climate-related Financial Disclosures (TCFD): ○ database of hundreds of scenarios
Slide 11: Transition scenarios and assumptions
Transition scenarios and assumptions — _* } tects Hazard Methodology Scenarios Scenario analysis and literature review IEA Sustainable Development Scenario. (SDS) and IPCC 1.5°C scenarios Carbon cost (USD), compliance cost . Carbon price based on IEA SDS . O8&G prices based on US EIA projections Lit
Slide 12: Transition Risks in Conclusion by Countries
Transition Risks in Conclusion by Countries Risk Type Country Impacted Risk Level Transition Risk Policy 2020-2025 - - 2026-2035 Malaysia Medium 2036-2050 Myanmar Medium Legal/Litigation 2020-2025 Thailand, Malaysia Medium 2026-2035 Malaysia Medium 2036-2050 Myanmar Medium Technology 2020-2025 - - 2
Slide 13: Climate Management Plan
Climate Management Plan Energy Partner of Choice
Slide 14: Adaptation Plan for Physical Risks: Heat Waves
Adaptation Plan for Physical Risks to be implemented since 2026 onward Risk Code & Description Mitigation/Adaptation/Resilience Plan Heat Waves • High temperatures leading to heat strokes and 1. Reduce the number of working hours during heatwaves unsafe working conditions. 2. Postpone scheduled main
Slide 15: Adaptation Plan for Physical Risks: Heat Waves (cont.)
Adaptation Plan for Physical Risks to be implemented since 2026 onward Risk Code & Description Mitigation/Adaptation/Resilience Plan Heat Waves (cont.) • Lowered performance / premature failure of electrical 1. Identify critical motors motors due to overheating resulting in increased 2. Engage motor
Slide 16: Adaptation Plan for Physical Risks: Heat Waves (cont.)
Adaptation Plan for Physical Risks to be implemented since 2026 onward Risk Code & Description Mitigation/Adaptation/Resilience Plan Heat Waves (cont.) • Heatwaves impacting the percentage of LPG 1. Installation of vapour recovery compression system to reduce loss of product recovery. Resulting in a
Slide 17: Adaptation Plan for Physical Risks: Tropical Cyclones
Adaptation Plan for Physical Risks to be implemented since 2026 onward Risk Code & Description Mitigation/Adaptation/Resilience Plan Tropical Cyclones • Tropical cyclones causing production interruption 1. Implement monitoring to include cyclone early detection. 2. Monitor swell height reaching or e
Slide 18: Adaptation Plan for Physical Risks: Heavy Precipitation
Adaptation Plan for Physical Risks to be implemented since 2026 onward Risk Code & Description Mitigation/Adaptation/Resilience Plan Heavy Precipitation • Heavy precipitation during the raining season leads 1. Equip with a diesel generator to disruptions in the general power grid, leading to possibl
Slide 19: Adaptation Plan for Physical Risks: Droughts
Adaptation Plan for Physical Risks to be implemented since 2026 onward Risk Code & Description Mitigation/Adaptation/Resilience Plan Droughts • Drought leading to bushfires affecting the facility by 1. Monitor the bushfires potentially causing damages and potential production 2. Develop an emergency
Slide 20: Management Plan for Transition Risks 2020
Management Plan for Transition Risks to be implemented 2020 onward Risk Code & Description Mitigation/Adaptation/Resilience Plan L1- Future costs of climate litigation in court of country of question 1. Monitor the development of climate litigation in operating countries. In addition, preemptively m
Slide 21: Management Plan for Transition Risks 2026
Management Plan for Transition Risks to be implemented 2026 onward Risk Code & Description Mitigation/Adaptation/Resilience Plan P1- Emergence of carbon pricing regulations (increased 1. The revenue from the internal carbon price should be used to implement pricing of GHG emissions) further emission
Slide 22: Management Plan for Transition Risks 2036
Management Plan for Transition Risks to be implemented 2036 onward Risk Code & Description Mitigation/Adaptation/Resilience Plan T1- Risk of renewable and energy efficiency technologies 1. Dedicate …. percentage of PTTEP's revenue to invest in technology reducing PTTEP's products demand opportunitie
PTT Exploration and Production (PTTEP) — ESG Presentation on 6ix