Slide 1: Ireland Inc – Columbus Project
o IRELAND INC Columbus Project November 2008 Confidential For complete information on Ireland Inc, its projects and risk factors, please review Ireland Inc.’s SEC filings at http://www.sec.gov. a

Slide 2: Forward Looking Statements
Forward Looking Statements This Presentation may contain, in addition to historical information, forward-looking statements. Statements in this Presentation that are forward-looking statements are subject to various risks and uncertainties concerning the specific factors disclosed under the heading

Slide 3: Overview
Overview Gold, Silver and Calcium Carbonate Project At surface of a dry lake bed Mine Site Production permit has been granted Short Production Horizon Columbus Project Mill-site Facility

Slide 4: Location
Location The Columbus Project is located ~ halfway between Las Vegas and Reno, ~52 miles west of Tonopah, Nevada, USA. The Project is specifically located over the Columbus Salt Marsh in Esmeralda County, Nevada.

Slide 5: Regional History
Regional History Columbus Project is in a mineralized area : Candelaria Mine (Silver)* Original Claims in 1860’s 151 M oz of Silver identified 68 M oz of Silver mined ~ 5 miles from Columbus Project Clayton Valley (Lithium) Lithium salts in Aquifer Production since 1950’s Aquifer type similar to Col

Slide 6: Project Assets
Project Assets The Columbus Project consists of : - ~ 19,300 acres of mineral claims on federal land administered by the BLM, with an option for an additional ~23,000 acres. - 380 acres permitted for production of Calcium Carbonate (CaCO3) and precious mineral extraction (the Permitted Area) - 270 a

Slide 7: Technical Program Goals
Technical Program Goals Determine Project Resources Drilling and Sampling program to determine precious metals grade in project area Determine Project Feasibility Operation of Pilot Plant to determine precious metal recovery rates, costs of recovery and capital costs

Slide 8: Technical Team
Technical Team Retained independent engineering firms: Permitting Lumos & Associates – based in Reno, NV Project Resources McEwen Geological – Drill program Arrakis Inc. – Drill sample analysis AuRic Labs – Drill sample analysis Project Feasibility Arrakis Inc. – Pilot Plant Operations All reported

Slide 9: Project Resources
Project Resources Gold (Au) Anomaly Identified - Over 60 surface samples and 5 large bulk samples taken over an ~ 27,000-acre area at depths of 3’ to 20’ analyzed by Arrakis Inc. - Results of sediment analysis identified an ~5,000-acre area with samples of Au values of > 0.075 oz/t in the NW section

Slide 10: Drill Program Results
Drill Program Results Drill Program Details - 18 holes drilled to a maximum depth of 100 ft* in 380-acre Production Permitted Area - 2 ft composite samples taken every 10 ft Gold Results - 154 Sample Av. = 0.074 opt Au - 18 Drill Hole Av. = 0.070 opt Au * Holes were drilled to 100 ft or shallower du

Slide 11: Geology
Geology Aeromagnetic Survey - High resolution aeromagnetic survey completed October 2007 - Mag Highs = Volcanics surrounding basin - Mag Lows = Young Sediments in basin and older sediments around basin - A large NW-SE fault structure enters basin from the NW and could be main aquifer feed to basin -

Slide 12: Potential of Mineralized Area
Potential of Mineralized Area Parameter Area Depth Tons of Minable Material Permitted Area 320 Acres 25 ft 8.8 M Currently permitted to mine up to 790,000 tpy in a 320-acre area to a depth of 40 ft. (estimated mine life of over 17 years) SRK Consulting, an independent engineering firm based in Reno

Slide 13: Project Feasibility
Project Feasibility Prefeasibility Process Flow Diagram - Currently operating processing 15 to 30 tons of material per day - Purpose: Determine initial gold recovery, operating costs and capital costs

Slide 14: Project Photos
Project Photos Columbus Dredge Module 1: Hydro-Cyclone

Slide 15: Recent Milestones
Recent Milestones January - October 2008 - Completed Acquisition of Columbus Project - Announced results of 18-hole drill program - Received permits for 39-hole drill program to test the mineralization within the ~5,000 acre gold anomaly - Completed upgrades to 15,000 ft2 processing building - Comme

Slide 16: Next Steps
Next Steps Project Development – 2008 - Complete initial resource study to further define three-dimensional extent of potential resources - Determine initial precious metal recovery rates, operating and full production capital costs through operation of the Pilot Production Plant

Slide 17: Columbus Project Budget
Columbus Project Budget October To December 31st 2008 Drilling and Analysis $ 250,500 Plant and Feasibility $ 602,750 Permits $ 4,500 $ 857,750 Contingency (10%) $ 85,775 Estimated Costs $ 943,525 Cash Position as at Sept 30, 2008 : $ 4,049,737 Budget Cash Position as at Dec 31 : $ 2,250,000 Monthly

Slide 18: Summary
Summary The Columbus Project represents a solid exploration and production opportunity: - Full permit for the extraction of Gold and Silver and the production of Calcium Carbonate - “Big Box Store” of mining operations: high volume and low cost - Near term production horizon

Slide 19: Ireland Inc
Ireland Inc Corporate Office: 2441 West Horizon Ridge Parkway, Suite 100 Henderson, NV, 89044 (702) 932-0353 info@irelandminerals.com http://www.irelandminerals.com Investor Relations Contact: R. Jerry Falkner, CFA RJ Falkner & Company, Inc. 125 Piper Lane Spicewood, TX, 78669 Tel: 800-377-9893
Source: SEC EDGAR · 8-K filed Nov 18, 2008
More decks from Ireland Inc
Corporate Update (November 2012)18 slides · Nov 29, 2012
LD Micro Conference (December 2011)10 slides · Dec 8, 2011
Rodman & Renshaw Conference September 201121 slides · Sep 9, 2011
Sidoti Micro Cap Conference June 201021 slides · Jun 30, 2010
Chicago Resource Expo April 201021 slides · Apr 21, 2010
Investor Presentation (April 2010)21 slides · Apr 15, 2010