Big Ridge Gold Corp · TSXV:BRAU
Big Ridge Gold — Technical Presentation (June 2022)
4 slides from Big Ridge Gold's technical presentation, Jun 28, 2022
Slide 1: Hope Brook Gold Project Drill Plan
417600E 417400E 417800E 418000E 418400E 418200E 5288100N 5288100N Plan View 5287900N 5287900N Legend Reporting Drill Hole Collars 5287700N 5287700N Reported Drill Hole Collars HB-21-152 High Grade Resource Shell Low Grade Resource Shell HB-21-150 Chetwynd Granite HB-21-148 HB-21-145 Silicic-Pyritic
Slide 2: Hope Brook Gold Project Drilling Results June 28 2022 - Longitudinal Section
Hope Brook Gold Project Drilling Results June 28 2022 Longitudinal Section looking NW HB-21-139 HB-22-164 SW 230 050 NE HB-21-143 HB-22-165 2.53 g/t Au, 0.15% Cu / 16.6m 5.63 g/t Au, 0.24% Cu / 2.7m 1.22 g/t Au, 0.08 % Cu / 6.8m 1.42 g/t Au, - % Cu / 5.0m (incl. 3.86 g/t Au, 0.26% Cu / 6.0m) HB-21-1
Slide 3: Sections U-U' and W-W'
lism Section U - U’ 51500 usm Section W - W’ NW 320 140 SE NW 320 140 SE Boson! Grin 5000] 4850: au BULLS BUS
Slide 4: Sections Y-Y' and E-E'
ism Section Y - Y’ sis0m Section E - E” sion NW 320 140 SE — _— NW 320 140 SE et a O L] LJ L] 400 4000 L| L] o