Slide 1: Interruptible Load Program (ILP) Protocol
‘GD Interruptible Load Program (ILP) Protocol 1 April 2022 Webinar (I) MERALCO — OW STRICTLY CONFIDENTIAL - FOR INTERNAL USE ONLY
Slide 2: Program Background
© CD NOW (I) MERALCO | ——— Program Background ¢ ILP was promulgated under ERC Resolution No. 8 Series of 2010 and amended by Resolution No. 8 Series of 2013, No. 5 Series of 2015, and No. 3 Series of 2019 ¢ ILP was first implemented in Visayas and Mindanao to ration limited power supply and avert pr
Slide 3: Program Background
© CD NOW (I) MERALCO Program Background * Under the ILP Agreement, customers interested to participate in ILP are required to: (i) provide committed de-loading capacity and preferred de-loading window, (ii) identify contact person/s for notification, and (ili) finalize baseline consumption profile f
Slide 4: Notification
Notification Activation Determination of Compensable kWh Billing Settlement 4
Slide 5: Activation
Notification 1 Activation Determination of Compensable kWh Billing Settlement 5
Slide 6: Notification process and timeline
1st Notification: 5pm of prior day Yellow & Red System Alerts from NGCP Immediately 2nd Notification: 7am of current day confirm to Yellow & Red System Alerts updates from NGCP Customer Care: (1) receipt of notification/ confirmation, Final Confirmation of de-loading: 2 hours before and (2) ability
Slide 7: Notification Reminders
CD— OW (I) MERALCO © Notification Reminders * Make sure to provide the correct landline number, mobile number and email address * Depending on the level of reserves, the final confirmation notice may also be the first and only notice for de-loading should a large power plant unexpectedly breaks down
Slide 8: 5 Steps to Implementing ILP
5 Steps to Implementing ILP Notification 2 Activation A 10AM-1PM B 12NN-3PM Determination of Compensable kWh A B Billing Settlement 8
Slide 9: Activation Reminders
© CD— NOW (I) MERALCO Activation Reminders ¢ Always ensure ample fuel supply * De-load immediately once instructed by MERALCO * Depending on the level of deficiency and time of Red Alert pronouncement by NGCP, participants may be requested to extend de- oading or de-load outside preferred schedules
Slide 10: Determination of Billing
Notification 3 Activation Determination of Compensable kWh Billing Settlement 10
Slide 11: Billing Settlement
Notification 4 Activation Determination of Compensable kWh Billing Settlement 11
Slide 12: Billing and Compensation (Amendments)
© CD: MoW (I) MERALCO Billing and Compensation (Amendments) ERC De-loading Compensationpesos Where: Incremental De-loading Rate Generation Cost of Fuel Fuel Consumption Rate PC Average Rate Compensable kWh Maintenance Cost [Incremental De-loading Rate x Compensable kWh] + Maintenance Cost [Generatio
Slide 13: Settlement
Notification Activation Determination of Compensable kWh 5 Billing Settlement 13
Slide 14: How to join: volunteer to de-load
Volunteer to de-load a certain amount of your demand Choose a time slot: 10am-1pm only, 12nn-3pm only, flexible Establish a baseline load profile Designate 3 contact persons 14
Slide 15: Switching?
© NOW (I) MERALCO Switching? Finalize the tripartite ILP agreement with your Retail Electricity Supplier (RES) to participate!
Slide 16: Thank You!
THANK YOU!