Savannah Goldfields Limited · ASX:SVG

Savannah Goldfields — Noosa Mining Conference 2025

23 slides from Savannah Goldfields's conference presentation, Jul 23, 2025

  1. Slide 1: Noosa Mining Conference July 2025

    For personal use only ASX Code: SVG 23 July 2025 Noosa Mining Conference July 2025

  2. Slide 2: Competent Persons Statement & Disclaimer

    Competent Persons Statement & Disclaimer Competent Persons Statements The information in this report that relates to Exploration Results and Exploration Targets is based on information compiled by Mr Scott Hall who is a member of the Australian Institute of Mining and Metallurgy. Mr Hall is a former

  3. Slide 3: Resuming gold production this year

    Savannah Goldfields - Resuming gold production this year Gold production campaign H2 2025 For personal use only • Georgetown Gold Processing Plant final maintenance before restart • Initial feed: • ~13,000 tonnes from existing stockpiles • ~18,000 tonnes from mining at Big Reef • subject to Environm

  4. Slide 4: Gold's rally continues

    Gold’s rally continues With an established mine and processing infrastructure Savannah offers near-term exposure to strong Gold prices: For personal use only Current Australian Dollar denominated Gold price is above A$5,000/oz Savannah’s 2023/24 production campaign indicated steady state cash produc

  5. Slide 5: Location: Far North Queensland's developing gold producer

    ASX: SVG Location Far North For personal use only Queensland’s developing gold producer Optimising gold production as part of Savannah Goldfields’ regional expansion strategy in a highly prospective and under explored gold-rich region. ASX:SVG Page 5 5

  6. Slide 6: The Georgetown gold processing plant

    The Georgetown gold processing plant • 200,000-240,000 tpa conventional CIP plant. For personal use only • Gravity circuit. • Wet placement of tails. • Georgetown and Agate Creek feed typically have high component of gravity recoverable gold. • Gold recoveries +95% for Agate Creek material processed

  7. Slide 7: Georgetown Project – 'The Hub'

    Georgetown Project – ‘The Hub’ GOLD MINE AND PROCESSING HUB For personal use only Exploration potential Extensive package of additional exploration and mining leases in proximity to the processing plant Toll processing opportunities Only gold plant within 400km by road providing opportunity to comme

  8. Slide 8: Potential long life for Georgetown gold processing plant

    Potential long life for Georgetown gold processing plant Source Tonnes Au g/t Oz Au For personal use only Georgetown Inferred Mineral Resource1 950,000 3.9 119,500 Agate Creek Mineral Resource higher grade2 1,300,000 2.4 101,800 Total 2,250,000 3.1 221,500 Exploration Targets3 870,000 to 2,230,000 2

  9. Slide 9: Growth options

    Growth options 1. Increase oxide feed available to Georgetown gold processing plant • Explore to create options to increase the oxide processing life or scale of processing or both. For personal use only • Recent definition of 5 new Exploration Targets is first step. • Drilling programme planned to

  10. Slide 10: Growth Options - Red Dam

    Growth Options - Red Dam Red Dam – ML 30203 For personal use only • Red Dam is located 41km northeast of Georgetown on an existing Mining Lease • In 2010, previous owners mined 22,600t at @ 13.6 g/t gold by open cut, to 15m deep. • 28,000t @ 21g/t gold remains below the existing pit to a depth of 50

  11. Slide 11: Growth Options - Electric Light

    Growth Options - Electric Light Electric Light – ML 3548 For personal use only • Electric Light is located 13km north of Georgetown on an existing Mining Lease • In 2011, previous owners mined 23,000t @ 8.7 g/t gold by open cut, to a depth of approximately 15m. • Mineral Resource of 49,000t @ 7.92 g

  12. Slide 12: Growth Options - Big Reef

    Growth Options - Big Reef Big Reef – ML 3278,3279,3280 and EPM 156547 For personal use only • Big Reef is located approximately 50 km from the Georgetown and close to the town of Forsayth • In 2013, previous owners mined 22,700t at @ 2.5 g/t gold by open cut, to 20m deep. • Historical underground mi

  13. Slide 13: Growth Options - Agate Creek

    Growth Options - Agate Creek Potential for future large-scale mining and on-site processing of gold mineralised halo surrounding high grade starter pits. For personal use only Section through pit 6A starter pit with selection of drill Plan view of Agate Creek high grade starter pits superimposed ASX

  14. Slide 14: Key milestones and news flow for 2025

    Key milestones and news flow for 2025 1. Financing undertaken 5. Prepare to resume mining at Agate Creek  Supported commencement of operational restart works  Mine design and production scheduling completed  New shareholders with capability to cornerstone operational restart • Develop restart pla

  15. Slide 15: Key objectives planned for 2026

    Key objectives planned for 2026 1. Amended Environmental Authority for Agate Creek project – approval expected Q2 2026 For personal use only 2. Mining of high-grade open pits at Agate Creek & processing at Georgetown expected to resume Q2 2026 • +20 months high grade feed to Georgetown gold processi

  16. Slide 16: Savannah Goldfields - recap

    Savannah Goldfields - recap Savannah Goldfields is primed to resume gold production from its established infrastructure in Far North Queensland: For personal use only Agate Creek Gold Mine which Operational Georgetown Gold has several discrete high-grade Current JORC compliant Processing Plant (GGPP

  17. Slide 17: Contact

    Contact For personal use only Savannah Goldfields Brad Sampson, CEO admin@savannahgoldfields.com www.savannahgoldfields.com 17

  18. Slide 18: Appendices

    For personal use only ASX:SVG Appendices

  19. Slide 19: Corporate Overview

    Corporate Overview A$0.018 1,141.6m 66.7m* $20.6m Share price Ordinary Shares Convertible Notes Market cap For personal use only as at close 22 July 2025 ($ 18.7 m face value) as at 24 July 2025 Board & Management. Shareholders Stephen Bizzell Rick Anthon Mark Baker Peter Wright Executive Chairman N

  20. Slide 20: Summary of Exploration Targets in Georgetown area

    Summary of Exploration Targets in Georgetown area Exploration Target* Tonnes Au g/t Oz Au Red Dam 430,000 to 1,060,000 3.3 to 5.4 45,000 to 185,000 For personal use only Electric Light 100,000 to 200,000 2.0 to 5.0 6,000 to 32,000 Jubilee Plunger 100,000 to 400,000 1.2 to 2.0 4,000 to 26,000 Big Ree

  21. Slide 21: Georgetown Mineral Resource

    Georgetown Mineral Resource Inferred For personal use only Mass Au Ag Density Au Mineral Tenement kt g/t g/t t/m koz* Resource ML30203, Red Dam 201 5.7 12.0 2.89 37 EPM9158 ML3548, Electric Light 388 3.7 0.7 2.59 46 EPM8545 Jubilee 87 3.2 21.3 2.58 9 ML3374 Plunger ML3280, ML3279, Big Reef 107 3.0 N

  22. Slide 22: Agate Creek Mineral Resource

    Agate Creek Mineral Resource Table 1: Total recoverable Mineral Resource at 0.5 g/t gold cut-off grade Sherwood Sherwood South Sherwood West Total Classification Mt Au g/t Au oz Mt Au g/t Au oz Mt Au g/t Au oz Mt Au g/t Au oz Measured 0.015 4.88 2,400 - - - - - - - - - For personal use only Indicate

  23. Slide 23: Agate Creek exploration opportunity

    Agate Creek exploration opportunity Agate Creek Mineral Resource is 471,000 oz Au2 and the area remains under explored with multiple exploration opportunities identified. For personal use only Sherwood West Sherwood Repeats Extensions to Sherwood Mineralisation Agate Creek is a modern exploration op

Savannah Goldfields — Noosa Mining Conference 2025 on 6ix