Port Of Tauranga Limited · NZX:POT
Port Of Tauranga — Investor Day (March 2026)
46 slides from Port Of Tauranga's investor day presentation, Mar 12, 2026
Slide 1: Northport Group Ltd – Port of Tauranga Investor Day 2026
NORTHPORT GROUP LTD Port of Tauranga Investor Day 2026
Slide 2: Located – Marsden Point, Northland
L O C AT E D – M A R S D E N P O I N T, N O R T H L A N D Marsden Point
Slide 3: Northport Group Ltd – Structure
N O R T H P O R T G R O U P LT D - S T R U C T U R E
Slide 4: Marsden Maritime Holdings Ltd
M A R S D E N M A R I T I M E H O L D I N G S LT D.
Slide 5: MMH Masterplan (Under Review)
MMH MASTERPLAN – (UNDER REVIEW)
Slide 6: 240 Berth Marina
240 BERTH MARINA Ul ye - ee
Slide 7: Marsden Cove Boat Yard
M A R S D E N C O V E B O AT YA R D
Slide 8: Marina Commercial Precinct
MARINA COMMERCIAL PRECINCT
Slide 9: Light Industrial Complex
LIGHT INDUSTRIAL COMPLEX
Slide 10: 180Ha Port & Industrial Zoned Land
180HA PORT & INDUSTRIAL ZONED LAND
Slide 11: 40Ha Port Zoned Land
40HA PORT ZONED LAND
Slide 12: Northport
“Re, Northport
Slide 13: Northport Today
N O R T H P O R T T O D AY Only port in NZ built 100% under the RMA requiring comprehensive environmental management and reporting 49 hectare site : (34.6 hectare harbour reclamation) 38.1 hectare paved : (36.0 asphalt paved + 2.1 concrete woodchip pad) 6 hectares of additional storage under
Slide 14: Current Port Layout
CURRENT PORT L AY O U T
Slide 15: To-Date Predominantly a Forestry Export
TO-DATE PREDOMINANTLY A FORESTRY EXPORT]
Slide 16: Wood Availability & Export Forecast
W O O D AVA I L A B I L I T Y & E X P O R T F O R E C A S T
Slide 17: 2015 Move into Container Handling
2015 MOVE INTO C O N TA I N E R H A N D L I N G G OT T WA L D M O D E L - 4 HARBOUR MOBILE CRANE 1 . 3 H A C O N TA I N E R S T O R A G E YA R D
Slide 18: Weekly Coastal Service
W E E K LY C O A S TA L S E R V I C E N P - P O A L - LY T - N P
Slide 19: International Seasonal Service
I N T E R N AT I O N A L S E A S O N A L SERVICE
Slide 20: 2015-2020 Kone Cranes – Gottwald Harbour Mobile Cranes
2015-2020 2 x KO N E C R A N E S - G O T T WA L D HARBOUR MOBILE CRANES
Slide 21: New Equipment – Kone Reach Stackers
NEW EQUIPMENT 4 × KO N E C R A N E S R E A C H - S TA C K E R S
Slide 22: 2020–2023 International Container Line Ad-Hoc Calls
2 0 2 0 – 2 0 2 3 I N T E R N AT I O N A L C O N TA I N E R L I N E A D - H O C C A L L S
Slide 23: Cruise Ships 2024–2027
CRUISE SHIPS 3X2024/4X2025/1X2026/1X2027
Slide 24: Berth Occupancy
B E R T H O C C U PA N C Y 1 0 - Y E A R S AT 5 8 . 7 %
Slide 25: Overhanging Vessels
OVERHANGING VESSELS BY 85 m
Slide 26: Northport Expansion Options
N O R T H P O R T E X PA N S I O N O P T I O N S 2025/26: Log export downturn enables a reallocation of storage space providing for project cargoes and increased container volumes c.50,000 TEU/annum - COMPLETED Stage 1: Berth-3 Extension Construct an additional 175m of linear berth Reclaim a
Slide 27: 2025/26 Port Reconfiguration
2025/26 PORT R E C O N F I G U R AT I O N
Slide 28: Stage 1: Berth-3 Extension Option
S TA G E 1 : B E R T H - 3 E X T E N S I O N O P T I O N
Slide 29: Northport Draft Expansion Plan Concept
NORTHPORT DRAFT EXPANSION PLAN CONCEPT 1 Ro sxe["Ot
Slide 30: Stage 1 Berth-3 Extension & Port Layout
S TA G E 1 B E R T H - 3 E X T E N S I O N & P O R T L AY O U T
Slide 31: Stage 2: Eastern End Container Terminal
S TA G E 2 : E A S T E R N E N D C O N TA I N E R T E R M I N A L CONSENTED 2 OCTOBER 2025
Slide 32: Uff
Uff Wf) cunne TERMINAL SERVICESETD NORTHPORT MARSDEN POINT PO tox 191, Whangareé 0140 wear reyournandbryantc0.n2
Slide 33: Northport Final Footprint 1090M Berthage and 65Ha Site
NORTHPORT FINAL FOOTPRINT 1090M BERTHAGE AND 65HA SITE
Slide 34: Northland Corridor – Lane Highway
N O R T H L A N D C O R R I D O R – 4 L A N E H I G H WAY
Slide 35: North Auckland Line
NORTH AUCKLAND LINE North Auckland Line upgraded from Swanson (Auckland) to Whangarei. All rail now ‘heavy weight’ 50kg/m and all ‘short plated’ joints either welded or long plated and suitable for 18t axle weight. All tunnels upgraded to concrete sleepers and 50kg/m rail, track re-laid and lo
Slide 36: Marsden Point Rail Link
MARSDEN POINT RAIL LINK KiwiRail has now purchased all the land needed for the rail line. An updated business case for building the 19km spur line was submitted to the Government July 2025. $410m was allocated by the Government as part funding for the rail link in 2021 but additional funding w
Slide 37: causeway crm WORKS Was-#zr.4038
ae) VL: causeway crm WORKS Was-#zr.4038 IMPRL MANNE -Ws-821-040.08 STRUCTURES NANGAPALRAIL BRIDGE - WS-021-40-7 SPRINGFIELD RAIL BRIOGE - WBS-s21-04016 TOTARA RAIL BRIDGE - WB5-221.00-19 ‘STRUCTURES. cc MATA HL CWI Wor MPRL MAINLINE -WBS-027.04008 = as-821.040.39 HEWLETT ROAD BRIDGE - Was.871.040-20
Slide 38: Other Opportunities
OTHER OPPORTUNITIES
Slide 39: Project Cargoes – Sustainable Energy
P R O J E C T C A R G O E S – S U S TA I N A B L E E N E R G Y
Slide 40: Manufacturing & Distribution Hubs
M A N U FA C T U R I N G & D I S T R I B U T I O N H U B S
Slide 41: Innovative Import Vehicle Distribution Hub
I N N O VAT I V E I M P O R T VEHICLE DISTRIBUTION HUB
Slide 42: Options for a NZ Defence Force Training Hub
OPTIONS FOR A NZ DEFENCE FORCE TRAINING HUB
Slide 43: Western End Shipyard / Drydock
W E S T E R N E N D S H I P YA R D / D R Y D O C K
Slide 44: Shipyard / Drydock – Listed Project in the Fast-Track Approvals Act
S H I P YA R D / D R Y D O C K L I S T E D P R O J E C T I N T H E FA S T - T R A C K A P P R O VA L S A C T
Slide 45: j He) soi dian iia
j He) soi dian iia ae a
Slide 46: Northport Group – The Upper North Island's Freight Future
NORTHPORT GROUP THE UPPER NORTH ISLAND’S FREIGHT FUTURE