Goldquest Mining Corp. · TSXV:GQC

Goldquest Mining — Investor Presentation (May 2019)

24 slides from Goldquest Mining's investor presentation, May 27, 2019

  1. Slide 1: GoldQuest Corporate Presentation May 2019

    GOLDQUEST TSXV: GOC opper in the jing Mine L ploration May 2019

  2. Slide 2: Forward-Looking Statements

    Statements contained in this presentation that are not historical facts are forward-looking information that involves known and unknown risks and uncertainties. Forward- looking statements in this presentation include, but are not limited to, statements with respect to the pre-feasibility study for

  3. Slide 3: A Growth Company

    A Growth Company Developing – Romero Discovery  Multi-million oz. Au/Cu discovery in 2012  Latest PFS Nov. 2016: 28% IRR, NPV (5%) US$202 million  Exploitation License approved by Mines Ministry Jan 2018  Awaiting Presidential Approval  EIA/BFS to follow Approval Exploring – Discovery in 2017 

  4. Slide 4: The Dominican Republic

    The Dominican Republic Canada Romero Project Tireo USA Concessions Puerto Plata Dominican Republic Falcondo Pueblo Viejo Mine Mine  Strong relationship with the government and community San Juan  No Government Royalties Santo Domingo  Reasonable Taxes (32%) source www.barrack.com Cerro de Maimon

  5. Slide 5: Veteran Team with DR experience

    Veteran Team with DR experience Dave Massola CEO • Former CFO GlobeStar • Former CEO Continental Nickel • Former CFO DeBeers Canada Felix Mercedes Country Manager • Director of Mining & Petroleum Chamber in the Paul Robertson, CA,CPA DR CFO JP LeBlanc • Former CFO Grayd Resources (acquired by Agnico

  6. Slide 6: Technical & Financial Expertise

    Technical & Financial Expertise Bill Fisher, P.Geo Julio Espaillat, M.Eng Non-Executive Chairman Director • Former CEO Globestar • Retired as full-time CEO Q3 ‘17 • Chairman Aurelian • Former Country Manager • VP Exploration of Boliden Globestar Florian Siegfried, MBA Patrick Michaels Director Direc

  7. Slide 7: DR - Push for Exploitation license

    DR - Push for Exploitation license License = 75 years with tax stability agreement for 25 years Immediate acceleration of ESIA and FS work upon receipt Non - DR Business Development - Seeking projects to invest Target : gold, copper, other opportunities Target : North, Central and South America Cons

  8. Slide 8: Prefeasibility Study NPV $203M, IRR 28%

    Prefeasibility Study (to be upgraded in BFS) NPV*5% IRR* AISC* PAYBACK $203M 28% $595/OZ. 2.5YRS AFTER TAX AuEq.** LTP-94 158.6m to 160.0m 288.6 g/t Gold 5.6% Copper  Currently in the permitting phase – to achieve * Net Present Value (“NPV”), Internal Rate of Return (“IRR”), All-In Sustaining Costs

  9. Slide 9: PFS: Responsible Mine Design

    PFS: Responsible Mine Design Minimal Surface Impact  Small surface footprint over underground mine, thus minimal affect on landscape Return Wasterock Underground  Wasterock will be returned underground as backfill No use of Cyanide or other Contaminates  A gold/copper concentrate product will be

  10. Slide 10: 2016 PFS Highlights

    2016 PFS Highlights Low Capex, High IRR, Scalable Deposit After-Tax NPV & IRR Sensitivity to Gold Price PFS Summary Results At US$1300 Au / US$2.50.lb Cu After Tax NPV5% After Tax IRR Start-Up CAPEX $158M $350 35% Sustaining CAPEX $92M $300 30% After Tax NPV5% (US$M) Throughput 2,800 tpd $250 25% Af

  11. Slide 11: Gold-Copper Starter Mine

    Gold-Copper Starter Mine only considers 35% of current M&I Resource Surface Portal Ventilation Access Ramp View Looking North Production Ramp  2,800 tpd – 75% Longhole  Large Stopes (up to 20m x 20m x 50m)  Options to expand mine as metal prices rise Remaining Mineral Resources www.goldquestcorp.

  12. Slide 12: Gold Equivalent Ounces

    NPV5% IRR AISC PAYBACK AFTER TAX $595/OZ. 2.5 The Gold/Copper Concentrate $203M 28% AuEq. YEARS Gold Equiv. Payable Oz. Starter Mine (35% of resource only) 180 GOAL: maintain or exceed 150,000 oz per year (Remaining Resource = Potential) 160 153,600 Gold Equivalent Ounces 140 136,800 135,600 124,800

  13. Slide 13: All in Sustaining Costs

    NPV6% IRR AISC* PAYBACK $203M AFTER $595/OZ. 2.5 TAXES YEARS All in Sustaining Costs (AISC) 28% AuEq. $1,400 LOM LOM ($/tonne) ($/oz.) $1,200 Mining $27.7 $222.4 Gross Processing $11.6 $93.1 $1,000 Margin Tailings Management $1.3 $10.3 Gold Price $800 $705 G & A (Site) $5.4 $43.8 $600 Total Cash Cos

  14. Slide 14: Permitting a Mine in the Dominican Republic

    DEVELOPMENT Permitting a Mine in the Dominican Republic Exploration Concession Application Process Mineral Exploration & Environmental 2005 – Ore Deposit Discovery License Application Process 2012 Sequential and time Mine intensive process of gathering and testing data to Construction find economic

  15. Slide 15: Romero Project Exploration Focus

    Romero Project Exploration Focus www.goldquestcorp.com | 15

  16. Slide 16: The "String of Pearls"

    The “String of Pearls” Romero: 10.4 g/t - 234.8m Grab Samples Gold (g/t) 2.0 – 167.5 (201) BDL – 2.0 (3272) Las Tomates: 4.7 g/t - 6.8 m Tireo Land Package Perimeter Hydrothermal Alteration Romero South: 10.75 g/t - 28.5 m Ongoing Ex;loration Program Previously Reported Drilling Imperial: 8.5 g/t -

  17. Slide 17: Exploring the Tireo Belt

    Exploring the Tireo Belt Romero Deposit Romero South Deposit  Targets occur along the mineralized trend hosting the Cachimbo Discovery and the Romero Deposits  These deposits occur in clusters along plate IP Chargeability (mV/V) boundaries – we are on the Atlantic/Caribbean boundary  Target gener

  18. Slide 18: Romero style mineralization - Open in all directions

    Romero style mineralization - Open in all directions – now drilling eastwards No copper yet! Surface sample: 168 g/t gold ?? 5 m @ 14 g/t gold, 12% zinc, 74 g/t silver 100 metres 21m @ 7.9 g/t gold 1.8% zinc, 40 g/t silver ?? www.goldquestcorp.com | 18

  19. Slide 19: Upon receipt of Exploitation License

    Upon receipt of Exploitation License 1. ESIA – follow DR Ministry of Environment Terms of Reference 1. Mine, Road, Power line, Port 2. Develop existing Plan – simple, benign, “starter mine” 7 Mt Reserve 1. Project enhancement options 2. Examine upgrading options for 1. Resource base = 23 Mt resource

  20. Slide 20: An Emerging Developer with Exploration Upside

    COMPELLING SIGNIFICANT ECONOMICS CLEAR EXPLORATION DEVELOPMENT UPSIDE ROMERO: PATH Fully Scalable An Emerging Developer with Exploration Upside We have the money - we have the projects! www.goldquestcorp.com | 20

  21. Slide 21: Market Capitalization and Share Information

    Market Capitalization* ~C$27 M Shares Outstanding 257,067,384 Basic Shares Outstanding 277,418,384 Fully Diluted Cash* 17 M Stock Price** C$0.105 * Cash (Actual) as of March 3ast, 2019 **As of May 24th, 2019 close Management Contact Info: Share Information Dave Massola CEO Paul Robertson CFO Dave Ma

  22. Slide 22: Mineral Reserve & Resource Estimate

    Mineral Reserve & Resource Estimate Romero Mineral Reserve Estimate Mine Reserves Tonnes Au Ag Cu Au Eq(1) (Cutoff $70 (g/t) (oz) (g/t) (oz) (%) (M lb) (g/t) (oz) NSR)(2) Total Probable 7,031,000 3.72 840,000 4.33 980,000 0.88 136 4.9 1,117,000 (1) Au equivalent metal prices: Au $1,300/oz Cu $2.50/l

  23. Slide 23: GoldQuest's CSR Commitment

    GoldQuest’s CSR Commitment  The inclusion of communities in our activities The Planet  Implementation of sustainable • Environmental environmental practices Stewardship  Active participation in the sustainable economic development of the area  Commitment to the safety and health of CSR Company e

  24. Slide 24: Gold-Rich VMS Clan

    Gold-Rich VMS Clan 167.5 g/t Au at surface Au Zn-Au Au Au Cachimbo Zn-Au Discovery Cu-Au Romero Project Cu-Au Cu-Au www.goldquestcorp.com | 24 Image modified from Dubé, B; Gosselin, P; Mercier-Langevin, P; Hannington, M; Galley, 2007. Mineral deposits of Canada: a synthesis of major deposit-types, d

GoldQuest Mining — Investor Presentation (May 2019) on 6ix