Maple Gold Mines Ltd · TSXV:MGM

Maple Gold Mines — Investor Presentation (June 2021)

32 slides from Maple Gold Mines's investor presentation, Jun 4, 2021

  1. Slide 1: Corporate Presentation June 2021

    CORPORATE PRESENTATION JUNE 2021

  2. Slide 2: Disclaimer

    DISCLAIMER Cautionary Notes Regarding Forward-Looking Statements This Corporate Presentation (“Presentation”) includes “forward-looking information” and “forward-looking statements” (collectively referred to as “forward-looking statements”) within the meaning of applicable Canadian securities legisl

  3. Slide 3: Investment Highlights

    INVESTMENT HIGHLIGHTS Located in Quebec’s Strategic Major Company Established Gold Robust Balance Sheet Strong Institutional prolific Abitibi Greenstone Partnership with Major Management & Board Resource and Past Shareholders Belt Producer Producer 2.77Moz Au Resource + Detour Lake Gold Mine High-Gr

  4. Slide 4: Why Quebec Rocks

    WHY QUEBEC ROCKS Top Mining Jurisdiction: Consistently 1 ranked top 10 global mining jurisdiction.* 2nd largest gold producing province in 2 Canada: 35% of total production in 2019. M&A Hotspot: +$12 Billion in gold 3 transactions since 2013. Abitibi Greenstone Gold Belt Low-Cost Exploration: Signif

  5. Slide 5: Remarkable Geological Setting

    REMARKABLE GEOLOGICAL SETTING 5 5 PAGE

  6. Slide 6: Exceptional Infrastructure Access

    EXCEPTIONAL INFRASTRUCTURE ACCESS  2.5-hour drive north of Val d’Or, Quebec along paved 2-lane provincial highway (Hwy #109), which runs through the property  Next to 1 of 6 major power lines in the province  55 km SW of Matagami with skilled labour, local airport and rail access  Douay covers ~

  7. Slide 7: 50-50 Partnership with Agnico Eagle

    50-50 PARTNERSHIP WITH AGNICO EAGLE  NO. 1 GOLD PRODUCER IN CANADA & TOP 10 GOLD PRODUCER WORLDWIDE.  Takes extremely conservative and measured approach to investments and asset acquisition.  JV Definitive Agreement signed February 2021  MGM’s Douay Project and Agnico’s Joutel Project consolidat

  8. Slide 8: Key Management & Advisors

    KEY MANAGEMENT & ADVISORS Matthew Hornor Joness Lang Kiran Patankar Fred Speidel David Broughton President & CEO Executive VP SVP Growth Strategy VP Exploration Technical Advisor  10+ years Executive  B.Com/Finance  12 years of senior  30+ years exploration  Former Executive VP, VP for Ivanhoe

  9. Slide 9: Board of Directors

    BOARD OF DIRECTORS Sean Charland Matthew Hornor Gérald Riverin Michelle Roth Maurice Tagami Chairman President & CEO, Director & Technical Director Director & Technical Director Advisor Advisor • Capital markets  10+ years Executive • Internationally • Entrepreneur and business • VP, Mining Operati

  10. Slide 10: Two Gold Projects – Established Resource & Past Producer

    TWO GOLD PROJECTS – ESTABLISHED RESOURCE & PAST PRODUCER DOUAY GOLD PROJECT JOUTEL GOLD PROJECT Third Largest Undeveloped Gold Resource in Quebec Host of Agnico’s historical Telbel Mining Camp Indicated: 8.6Mt @ 1.52 g/t Au for 422Koz Au Past production of 6.2 Mt at 6.5 g/t Au for total of 1.15 Moz

  11. Slide 11: Douay Project - Established Gold Resource

    DOUAY PROJECT - ESTABLISHED GOLD RESOURCE • 2% NSR to Maple Gold over entire 357 km2 property package • 1% NSR to IAMGOLD on 11.9 km2 portion of property (covers only134k oz of resource) • 2017 Metlabs metallurgical results: Gold recovery via gravity followed by flotation averaged 89% (see appendix)

  12. Slide 12: Significant Resource Expansion Potential

    SIGNIFICANT RESOURCE EXPANSION POTENTIAL  Significant resource expansion potential across large 6 x 2 km resource area  Similar scale as Canadian Malartic – largest gold mine in Canada  Douay mineral resource occurs along major lithotectonic boundary (Casa Berardi North Fault) Sediments on the no

  13. Slide 13: 2020 Step-Out Drill Program

    2020 STEP-OUT DRILL PROGRAM Winter 2020 Step-Out Drill Success: 11 of 14 holes intersected higher-than-deposit average grade gold mineralization, indicating significant resource expansion potential at multiple zones such as Porphyry and NW. Porphyry Zone Cross Section NW Zone Cross Section RPA 2019

  14. Slide 14: Winter 2021 JV Drill Campaign

    WINTER 2021 JV DRILL CAMPAIGN  Maiden JV drill program with Agnico Eagle (with their technical oversight)  ~10,000 m in 22 holes aimed at expanding resources  Holes broadly distributed across established mineral resource and discovery targets  First hole from DW Zone (Hole DO- 21-294) intersecte

  15. Slide 15: 2021 Drill Program Success

    2021 DRILL PROGRAM SUCCESS Winter 2021 Maiden JV Drill Program with Agnico Eagle: designed to expand the existing Douay mineral resource by both step-out and discovery drilling as well as to upgrade resources with several infill holes. • First hole from DW Zone (Hole DO-21-294) intersected 15m @ 3.8

  16. Slide 16: 2021 Drill Program Success

    2021 DRILL PROGRAM SUCCESS Results from second drill hole returned 132 m of 1.58 g/t Au – one of the best grade-thickness intercepts ever encountered at Douay. N-S cross section looking west, 25m corridor either side, showing >0.45 g/t Au blocks from RPA 2019 model. Blocks >1 g/t Au highlighted in r

  17. Slide 17: Significant Depth Extension Potential at Douay

    SIGNIFICANT DEPTH EXTENSION POTENTIAL AT DOUAY  Average vertical drill depth at Douay less than 400 metres  Mines in the Abitibi famous for vertical continuity  Casa Berardi, Goldex and Canadian Malartic mines all have known resources/mineralization down to 1,500-2,000 metres*  Per RPA, potentia

  18. Slide 18: Joutel Project – High-Grade Past Producer

    JOUTEL PROJECT – HIGH-GRADE PAST PRODUCER  39 km2 land package located directly south of Douay; 1vended into the JV by Agnico  Hosted one of Agnico's first gold operations, producing ~1.15Moz of gold between 1974 and 1993  Historical mining at the Telbel mine had focused on exploitation of a sing

  19. Slide 19: Joutel Project – Untapped High-Grade Potential

    JOUTEL PROJECT – UNTAPPED HIGH-GRADE POTENTIAL Plan View  No exploration has been conducted at the Telbel mine area for nearly 30 years.  Minimal exploration work conducted in 2011-2012 focused on areas >1.6 km to the east of Telbel mine.  Potential for near-surface, higher-grade mineralization a

  20. Slide 20: Targeting the Next Major Abitibi Gold Camp

    TARGETING THE NEXT MAJOR ABITIBI GOLD CAMP Maple Gold’s goal is to establish a new multi-million (+5Moz) gold camp in the heart of the Abitibi In addition to growing resources at Douay and rediscovering the Telbel mine at Joutel, the JV’s ~400 km2 property hosts multiple highly prospective gold disc

  21. Slide 21: Major Catalysts - FY2021

    MAJOR CATALYSTS - FY2021 H1/2021 H2/2021  Sign Definitive JV Agreement with Agnico Eagle  Douay: Winter 2021 Drill Program Results  Douay: Fall 2020 Drill Program Results  Douay: 3D Model and Resource Optimization  Douay: Complete IP & Winter 2021 Drill Programs  Douay: Updated NI43-101 Resour

  22. Slide 22: Capital Structure, Financial Position & Ownership

    CAPITAL STRUCTURE, FINANCIAL POSITION & OWNERSHIP As of June 4, 2021 Share Ownership Mix Shares Outstanding 321.1M 2.7% Warrants1 56.9M 12.1% Options2 23.7M Management/Insiders/Closely Related Fully Diluted 405.4M 44.2% Agnico Eagle Mines 52-week high/low share price $0.56-$0.07 Market Capitalizatio

  23. Slide 23: Why Invest in Maple Gold Mines?

    WHY INVEST IN MAPLE GOLD MINES? PAGE 23

  24. Slide 24: Contact Information

    CONTACT INFORMATION Shirley Anthony - Director, Corporate Communications E-mail: santhony@maplegoldmines.com Phone: 778-999-2771 PAGE 24

  25. Slide 25: Largest Mines in Abitibi

    LARGEST MINES IN ABITIBI 25 25 PAGE

  26. Slide 26: The Canadian Hub for Mining

    THE CANADIAN HUB FOR MINING The Abitibi belt stretches from Wawa in Ontario to Chibougamau in Quebec – two of Canada’s top mining jurisdictions and hotbed for M&A activity. MAPLE GOLD 26 26 PAGE

  27. Slide 27: Quebec Abitibi M&A Activity

    QUEBEC ABITIBI M&A ACTIVITY The Region has Produced more than ~$12B in M&A Activity since 2013 27 27 PAGE

  28. Slide 28: Douay Exploration/Corporate History

    DOUAY EXPLORATION/CORPORATE HISTORY • Douay was staked in 1976 and initially explored for higher-grade underground resources. • Bulk tonnage potential first outlined in 2004-05 • Project acquired by Aurvista Gold Corporation in late 2010 and name changed to Maple Gold in late 2017 during management/

  29. Slide 29: The Path Forward to Value Creation

    THE PATH FORWARD TO VALUE CREATION Company Year Drill Holes Total Metres Cumulative Drill Holes Inco, SOQUEM and Aurizon 1976 to 1999 468 122,906 468 Vior 2004 to 2010 107 32,785 575 Aurvista/MGM 2011 to 2021 286 111,184 861 TOTAL 1976 to 2021 861 266,875 861 • Substantial drill core library well-ar

  30. Slide 30: RPA Resource Breakdown by Zone

    RPA RESOURCE BREAKDOWN BY ZONE Mineral Resources at Douay Deposit per Zone as of October 23, 2019 PAGE 30

  31. Slide 31: Preliminary Metallurgical Results

    PRELIMINARY METALLURGICAL RESULTS Preliminary gravity/flotation test on Douay samples • 2017 Metlabs Study: samples were evaluated with direct cyanidation, flotation and gravity recovery methods. Results were as follows: • Average gold gravity recovery was 26% • Average whole ore leach recovery was

  32. Slide 32: Regional Exploration – NE IP & P8 Targets

    REGIONAL EXPLORATION – NE IP & P8 TARGETS Northeast IP Target (NE IP Target) P8 Target Simplified geology map and structural context showing Douay resource conceptual pits Simplified geology map with structural context showing Douay resource conceptual pits and the NE IP Target area as a chargeabili

Maple Gold Mines — Investor Presentation (June 2021) on 6ix