Schaeffler Ag · XETR:SHA0

Schaeffler — Technical Presentation (July 2022)

22 slides from Schaeffler's technical presentation, Jul 18, 2022

  1. Slide 1: ProLink – Condition Monitoring System

    >> Name Präsentator << ProLink – Condition Monitoring System PUBLIC

  2. Slide 2: Schaeffler ProLink Condition Monitoring System

    Schaeffler ProLink Condition Monitoring System • Modular • Multiple interfaces for cloud communication • For universal application • Easy to use • Perfect integration into customer infrastructure ProLink - Condition Monitoring System 2 PUBLIC

  3. Slide 3: Agenda

    Agenda 1 Condition Monitoring 2 ProLink Condition Monitoring System 3 Areas of application 4 ProLink system integration 5 Advantages 6 Services 7 Further information 7/18/2022 Presentation title 3 PUBLIC

  4. Slide 4: Why Condition Monitoring?

    Condition Monitoring Why Condition Monitoring? Problem detected • Increasing machine Change of availability condition Vibration • Avoiding unplanned downtime Noise • Improving service and Machine state maintenance planning • Avoiding subsequent Temperature damage • Reduction of maintenance costs • P

  5. Slide 5: Simple application example

    Condition Monitoring Simple application example • Saw mill Kåge in Sweden Downtime costs per hour: 2,800 EUR • Annual production 4 hours of asset downtime: 11,200 EUR volume approx. 240,000 m³ of sawn timber Total: 11,200 EUR • 81 employees Amortisation time: after one unplanned downtime • Monitorin

  6. Slide 6: Product portfolio Schaeffler Condition Monitoring devices

    Condition 1 Monitoring Condition Monitoring Product portfolio Schaeffler Condition Monitoring devices OPTIME SmartCheck ProLink CMS The next generation of condition Sophisticated, one-channel condition Modular multi-channel condition monitoring: affordable, easy to install and monitoring system with

  7. Slide 7: Agenda

    Agenda 1 Condition Monitoring 2 ProLink Condition Monitoring System 3 Areas of application 4 ProLink system integration 5 Advantages 6 Services 7 Further information 7/18/2022 Presentation title 7 PUBLIC

  8. Slide 8: ProLink Condition Monitoring System in a nutshell

    ProLink 2 Condition ProLink Monitoring Condition System Monitoring System In a nutshell Additional modules Short info: SmartWeb • individually expanded with • Configuration assistant • Automatic learning mode additional measurement modules • Smallest unit consisting of 1 processor module (CPU) and 1

  9. Slide 9: Vibration module

    ProLink 2 Condition ProLink Monitoring Condition System Monitoring System Vibration module Function: The vibration module captures Vibration the signals important for monitoring such as vibration, speed, voltages, etc. and e.g. Temperature Switching output transmits them to the CPU. e.g. Load In the

  10. Slide 10: Input/Output module

    ProLink 2 Condition ProLink Monitoring Condition System Monitoring System Input/Output module Function: The input/output module is 0-20 mA used to record additional signals such as temperature, status 4-20 mA information (machine is 0-20 mA running), etc. 0-10 V In addition alarm states or 4-20 mA c

  11. Slide 11: Maximum expansion of the Monitoring System (available)

    ProLink 2 Condition ProLink Monitoring Condition System Monitoring System Maximum expansion of the Monitoring System (available) Internal Ethernet bus Max. 100 m each • Max. 8 modules • 16 IEPE inputs … • 8 pulse inputs (A/B coded) • 16 switching outputs (digital) • 32 input/output signals (adjustab

  12. Slide 12: Agenda

    Agenda 1 Condition Monitoring 2 ProLink Condition Monitoring System 3 Areas of application 4 ProLink system integration 5 Advantages 6 Services 7 Further information 7/18/2022 Presentation title 12 PUBLIC

  13. Slide 13: Applicable across all industries

    Areas 3 ofof Areas application application Applicable across all industries • Motors • Steel industry • Fans • Paper industry • Compressors • Raw materials processing • Gear boxes • Vibration screens • Wind power • Crushers/Mills • Production/Manufacturing • Spindles • Marine sector • Rolling mills

  14. Slide 14: Agenda

    Agenda 1 Condition Monitoring 2 ProLink Condition Monitoring System 3 Areas of application 4 ProLink system integration 5 Advantages 6 Services 7 Further information 7/18/2022 Presentation title 14 PUBLIC

  15. Slide 15: System integration in customers infrastructure

    ProLink 4 system ProLink integration System integration System integration in customers infrastructure Easy integration in process automation via: • Profinet* • OPC/UA Server • SLMP Client Cloud communication via: • OPC/UA Server • MQTT * Next development step ProLink - Condition Monitoring System 1

  16. Slide 16: Direct integration in ERP and Cloud

    ProLink 4 system ProLink integration System integration Direct integration in ERP and Cloud Direct integration via standard communication channels: • OPC/UA Server • Web services • E-Mail ProLink - Condition Monitoring System 16 PUBLIC

  17. Slide 17: Agenda

    Agenda 1 Condition Monitoring 2 ProLink Condition Monitoring System 3 Areas of application 4 ProLink system integration 5 Advantages 6 Services 7 Further information 7/18/2022 Presentation title 17 PUBLIC

  18. Slide 18: Advantages

    Advantages 5 Advantages Advantages Immediately ready for use No additional software necessary • The pre-installed basic configuration of the ProLink CMS allows • Software integrated in the ProLink device for configuration, general monitoring of standard equipment such as motors, fans and viewing tre

  19. Slide 19: Agenda

    Agenda 1 Condition Monitoring 2 ProLink Condition Monitoring System 3 Areas of application 4 ProLink system integration 5 Advantages 6 Services 7 Further information 7/18/2022 Presentation title 19 PUBLIC

  20. Slide 20: Range of services

    Services 6 Services Range of services • On-site service Definition of measuring points, commissioning, reference measurements, measuring routes, system integration, rout cause analysis in case of problems • Remote monitoring Remote servicing (analysis and reporting) and system maintenance (adjustmen

  21. Slide 21: Agenda

    Agenda 1 Condition Monitoring 2 ProLink Condition Monitoring System 3 Areas of application 4 ProLink system integration 5 Advantages 6 Services 7 Further information 7/18/2022 Presentation title 21 PUBLIC

  22. Slide 22: Further information

    Further 7 information Further Information Further information Consulting and Contact Schaeffler Monitoring Services GmbH Kaiserstraße 100 D - 52134 Herzogenrath Phone.: +49 (0)2407 9149-0 E-Mail: industrial-services@schaeffler.com Further information to follow ProLink - Condition Monitoring System 2

Schaeffler — Technical Presentation (July 2022) on 6ix