Serval Resources Plc · LSE:SRVL

Serval Resources — Investor Presentation (October 2026)

33 slides from Serval Resources's investor presentation, October 2026

  1. Slide 1: The future runs on copper

    The future runs on copper Unlocking the potential value in Africa’s under - explored copper belts Cu mineralisation hosted in quartz veins in Namibia AIM: SRVL October 2026 servalresources.com

  2. Slide 2: Disclaimer

    Disclaimer • This document, together with any oral briefing which accompanies it and which is personal to the recipient, has been issued by Serval Resources Plc (the “Company”) . This document does not constitute or form part of, and should not be construed as, any offer or invitation to sell or iss

  3. Slide 3: Investment Highlights

    Investment Highlights Ambition to create a pre - eminent copper vehicle for the London market Major Copper Opportunity • Copper is critical to modern and future society - third most - used metal • Major deficit forecast by 2040 without investment in new supply 1 Côte d’Ivoire Highly Experienced Team

  4. Slide 4: Our Portfolio

    Our Portfolio Major land positions in emerging copperbelts Namibia – 4 Exclusive Prospecting Licences¹ (EPLs) in the Kaoko Basin (788.77 km²) Location of Serval Licences • ca. 150 km of potential strike length • Multiple high - grade copper - silver (Cu - Ag) mineralisation targets with 13 defined p

  5. Slide 5: Successful Raise of £7.0m / US$9.2m

    Successful Raise of £ 7.0 m / US$9.2m Endorsement of high - quality Namibian assets via drilling for equity agreement with major shareholder Capital Drilling £ million US$ million Proceeds (cash) 3.2 4.2 Proceeds (Capital Drilling Limited & Associates) 3.8 5.0 Total proceeds 7.0 9.2 Existing funds 1

  6. Slide 6: Deal Structure

    Deal Structure Deal Timetable Raise of £ 7 million via issue of 28 ,178,612 shares in two tranches at 25 p • 15 Oct: Financing (incl. retail offer) closes • Deal cornerstoned by Capital Drilling and Associates contributing £ 3.8 million (US $5 million) • 16 Oct: Trading resumes on AIM • Serval to us

  7. Slide 7: Namibia Kaoko Basin

    Namibia Kaoko Basin servalresources.com

  8. Slide 8: Kaoko Basin – Namibia

    Kaoko Basin – Namibia Potential to be a major new copper district An emerging copper region of significance • Interpreted as an extension of the prolific Central African Copperbelt (CACB) • The CACB is the world’s largest province containing stratiform sediment - hosted copper mineralisation 2 • Hom

  9. Slide 9: Serval's Kaoko Basin Portfolio

    Serval’s Kaoko Basin Portfolio Multiple Cu - Ag mineralisation discoveries from surface 13 prospects on four EPLs to date • Historic work has identified Cu - Ag mineralisation within stratabound horizons • ca . 150 km of potential strike length along the prospective Nosib / Otavi contact • +9,000 me

  10. Slide 10: Geological Mapping and Sampling on EPL 7081

    Geological Mapping and Sampling on EPL 7081 Successfully found and mapped known and new high - grade Cu - Ag occurrences • Mapping of six prospects on EPL 7081 and new Cu mineralisation prospect now delineated ( Okamborombonga ) • Mineralisation in outcrop confirmed to stretch over a strike length o

  11. Slide 11: Work Confirms Scale of Prospectivity of the Region

    Work Confirms Scale of Prospectivity of the Region Mapping – Key Findings • Identification of hypogene and supergene mineralisation • Multiple types of Cu mineralisation identified at surface: Chalcocite sample bornite, chalcocite, chalcopyrite, malachite, azurite, dioptase, V isible supergene miner

  12. Slide 12: Kaoko Basin Next Steps

    Kaoko Basin Next Steps Systematic work aiming to design and execute major drilling campaign to establish MRE Activity Q4 2026 Q1 2027 Q2 2027 Q3 2027 Q4 2027 • High - resolution ground magnetic and orientation Induced Polarisation (IP) surveys • Definition of first drill targets • IP survey step out

  13. Slide 13: Botswana Kalahari Copper Belt (KCB)

    Botswana Kalahari Copper Belt (KCB) servalresources.com 13

  14. Slide 14: KCB – Botswana

    KCB – Botswana One of the most prospective regions for new sedimentary Cu discoveries An important source of new Cu supply Recently became home to two major operations • 2008: no resources in the KCB; now ca. 15 Mt contained Cu and growing • MMG bought Khoemacau for US$1.9 billion in 2024 • Sandfire

  15. Slide 15: KCB Highest Priority Prospects

    KCB Highest Priority Prospects Focus on the Sweet Thorn Pan and Somelo Prospects on strike to Khoemacau Contiguous to Khoemacau deposits • A long - life (+20 years) copper - silver mine • Total resource of 450 Mt at 1.4% Cu and 17.5 g/t Ag • MMG currently spending US $900 million to expand productio

  16. Slide 16: KCB 2026 Geophysics Work Programme

    KCB 2026 Geophysics Work Programme Geological background using low - resolution regional data: Sweet Thorn Pan and Somelo Sweet Thorn Pan (PL 235 Complex) geophysical survey traverse lines with regional Somelo (PL 232 Complex) geophysical survey traverse lines with regional geology geology backgroun

  17. Slide 17: KCB 2026/2027 Work Programme

    KCB 2026/2027 Work Programme Completed programmes • Sweet Thorn Pan (PL 235 - Complex): High - resolution drone magnetic survey completed Extensive visible mineralisation A sample of chalcocite… • Aim to achieve higher resolution imagery to establish more Land access permission on EPL 7081engagement

  18. Slide 18: KCB Next Steps

    KCB Next Steps Systematic work aiming to design and execute drilling campaign to confirm mineralised contact Activity Q4 2026 Q1 2027 Q2 2027 Q3 2027 Q4 2027 • Interpretation of geophysical results data for Sweet Thorn Pan and Somelo prospects • Soil sampling focused on areas where geophysics have i

  19. Slide 19: Côte d'Ivoire Duékoué

    Côte d’Ivoire Duékoué servalresources.com

  20. Slide 20: Duékoué – Côte d'Ivoire

    Duékoué – Côte d’Ivoire Potential Cu - Mo- Au project: joint venture with La Miniere de L’ Elephant SARL ( Laminele ) • An emerging copper belt proximate to the Archean / Proterozoic boundary with the potential to host Iron Oxide Copper Gold (IOCG) style province or porphyry deposit • Fieldwork in 2

  21. Slide 21: Our Approach

    Fundraising event for Hungua Combined School in Kunene Region, Namibia in August 2026 Our Approach servalresources.com

  22. Slide 22: The Right Team

    The Right Team Extensive experience developing high growth mining companies in Africa Robin Birchall Richard James Chief Executive Officer Chief Financial Officer Mr. Birchall has +25 years’ experience in the financing, Mr. James is a chartered accountant and has held CFO and management and developm

  23. Slide 23: Milestones

    Milestones Funded work programmes across all three projects to Q4 2027 Activity Q4 2026 Q1 2027 Q2 2027 Q3 2027 Q4 2027 Namibia – Kaoko Basin High - resolution ground magnetic and IP surveys Trenching and sampling to support geophysics Serval maiden drilling campaign of ca. 20,000 metres Maiden mine

  24. Slide 24: Investment Summary

    Investment Summary The right commodity • Copper is critical to modern and future society and demand is growing fast At the right time • Copper had a breakout year in 2025 and market deficit expected in 2026 • S&P see potential 10 Mt deficit by 2040 without investment in new supply¹ In the right plac

  25. Slide 25: Appendices

    Appendices servalresources.com 25

  26. Slide 26: Board of Directors

    Board of Directors Diverse mix of relevant skills and experience John Treacy Robin Birchall Non - Executive Chairman Chief Executive Officer Mr. Treacy is a qualified solicitor and experienced London Mr. Birchall has +25 years’ experience in the financing, financier who specialises in working with g

  27. Slide 27: Responsible Operations

    Responsible Operations Health and Safety – taking care of our people • Apply the Company’s health, safety, environment and community (HSEC) management system to all activities • Aim to maintain a zero - harm safety culture across all activities Environmental Stewardship – minimising our impacts • Al

  28. Slide 28: The Future runs on Copper

    The Future runs on Copper S&P forecast potential 10 Mt shortfall by 2040 • Copper demand expected to grow by ca. 50% from 28 Mtpa to 42 Mtpa by 2040 ¹ 2025 to 2026 have seen breakouts in copper and silver pricing • Supply side heavily reliant on a handful of ageing mines with declining grades • Supp

  29. Slide 29: Acquisition of Kalahari Copper Limited (KCL)

    Acquisition of Kalahari Copper Limited (KCL) The acquisition of KCL, including the licences held by its subsidiaries in Namibia and Botswana, completed on 27 April 2026 Key Deal Terms : • Issued shares that constitute <30 % of the Company’s issued share capital on admission to trading on AIM • £ 2 m

  30. Slide 30: Summary of Licences

    Summary of Licences Summary of the Botswana Licences Summary of the Namibia Licences Licence Interest Licence Licence Area Asset Holder¹ Interest (%) Status Licence Area (km 2 ) Comments Asset Holder Status Comments Expiry (%) Expiry (km 2) Renewal PL061_2021 SRB 100 Exploration 30 - Sep - 28 99.12

  31. Slide 31: Kaoko Basin Drilling Highlights

    Kaoko Basin Drilling Highlights +9,000 metre drilling completed by Kalahari Copper Limited 1 Total Mineralised Prospect Hole ID From (m) To (m) Interval (m) Cu (%) Ag (ppm) Avg Cu - Eq (%) Max Cu - Eq (%) Length (m) Omatapati OPR002 46 47 1 0.56 36 1.05 1.05 OPR002 80 89 9 1.70 126 3.43 12.65 OPR002

  32. Slide 32: Namibia Sample Results from ALS Laboratories

    Namibia Sample Results from ALS Laboratories Confirmation of high - grade Cu - Ag mineralisation across multiple prospects The table below presents the average grades of the samples submitted on a per prospect basis, as well as the three highest gr ade samples (in Cu - Eq %) for each of the prospect

  33. Slide 33: Thank you

    Thank you Contact: Investor Relations Cathy Malins Tel: +44 7876 796 629 Email: cathy.malins@servalresources.com Website: www.servalresources.com servalresources.com 33

Serval Resources — Investor Presentation (October 2026) on 6ix