Argosy Minerals Limited · ASX:AGY

Argosy Minerals — Investor Presentation (May 2018)

17 slides from Argosy Minerals's investor presentation, May 15, 2018

  1. Slide 1: Investor Presentation – May 2018

    For personal use only Investor Presentation – May 2018 ASX Code: AGY www.argosyminerals.com.au

  2. Slide 2: Disclaimer

    Disclaimer This presentation is for information purposes only. Neither this presentation nor the information contained in it constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or sale of For personal use only shares in any jurisdiction. This presentation may

  3. Slide 3: Company Overview

    Company Overview Lithium brine project in the ‘Lithium Triangle’ with staged development works well underway • Key Rincon Lithium Project located in the world-class “Lithium Triangle” – the world’s dominant source of lithium production: For personal use only – Located in Salar del Rincon, Salta Prov

  4. Slide 4: Capital Structure, Share Price & Recent Milestones

    Capital Structure, Share Price & Recent Milestones 12 Month Share Price Performance and Key Milestones Stage 1 Pilot Plant For personal use only Current Capital Structure Stage 2 Ponds Operational Filled & Fully Shares on Issue 918,496,575 Operational Options on Issue 5M exercisable at $0.045 $17 mi

  5. Slide 5: Directors & Management

    Directors & Management Alex Molyneux – Non-Executive Chairman For personal use only Mr. Molyneux currently serves as CEO of one of the world’s largest uranium producers, Paladin Energy (ASX:PDN). He is also Non-Executive Chairman of Azarga Metals (TSXV:AZR) and Non-Executive Director of Metalla Roya

  6. Slide 6: Lithium 101: Brine vs. Hard-Rock Production

    Lithium 101: Brine vs. Hard-Rock Production Most lithium production comes from lower cost brine production • Lithium production is predominantly delivered from brines For personal use only • Brines have significantly lower extraction costs compared to hard rock deposits Lithium Production by Deposit

  7. Slide 7: Argosy in the "Lithium Triangle"

    Argosy in the “Lithium Triangle” World’s most prolific lithium producing region 49% of For personal use only Global Lithium Bolivia Production from the Pozuelo Vilama “Lithium Triangle” which holds 49% of Jama Guayatayoc approximately Global Lithium Atacama Olaroz 70% of World’s Production from the

  8. Slide 8: Recent History and Overview

    Rincon Project: Recent History and Overview A significant opportunity to achieve near-term LCE production • Binding JV Agreement executed September 2016 For personal use only – Argosy currently has 77.5% interest in Puna Mining S.A. – the JV entity that owns the Rincon Lithium Project – Argosy will

  9. Slide 9: Location and Infrastructure

    Rincon Project: Location and Infrastructure Rincon lies close to infrastructure in Salta Province, a prolific mining jurisdiction Stage 2 Evaporation Ponds concentrating lithium brine • The Project lies within Salta Province, ~3,700m ASL, serviced by city of For personal use only Salta with populati

  10. Slide 10: Development Milestones

    Rincon Project: Development Milestones Unique development strategy targeting near-term battery grade lithium carbonate production only Stage 1 Stage 2 Stage 3 use Pilot Plant Stage Initial Commercial Stage Commercial Stage Industrial scale pilot plant to Initial commercial scale plant (with Large sc

  11. Slide 11: Current Status

    Rincon Project: Current Status Development works ahead of schedule with the ‘pull forward’ of Stage 2 commencement • Stage 1 plant operational & targeting initial production of battery grade LCE Rincon Project Conceptual Process Flow Sheet For personal use only product – Ponds completed April 2017 a

  12. Slide 12: Drilling Works

    Rincon Project: Drilling Works Drilling includes holes for resource data as well as production wells • Two concurrent phases of drilling operations conducted: For personal use only – Resource exploration drilling to prepare JORC Resource estimate, utilised a diamond drill rig to collect drill cores

  13. Slide 13: Preliminary Economic Assessment

    Rincon Project: Preliminary Economic Assessment Works commenced by independent hydrogeological consultants • The Company has engaged independent consultants to prepare a PEA for the Rincon Lithium Project For personal use only • The main items of the PEA will comprise: – Hydrogeological data, with l

  14. Slide 14: Key Partner & Expertise

    Rincon Project: Key Partner & Expertise Pablo Alurralde, a ‘world renowned’ expert and patent developer for unique lithium process routes • Partnership with Argentinian lithium expert Pablo Alurralde For personal use only – Chemical Engineer and Master of Philosophy, former director of FMC Argentina

  15. Slide 15: Executive Management

    Rincon Project: Executive Management Management team  Argosy has executed a Definitive Farm-In Joint Venture Agreement for the Rincon Lithium Project and currently has a For personal use only 77.5% interest in the Argentinian joint venture company – Puna Mining S.A., and can earn an ultimate 90% in

  16. Slide 16: Investment Summary

    Investment Summary New standard for development of lithium brine projects worldwide Key focus is on Rincon Lithium Project located in the world-class “Lithium For personal use only Triangle” – the world’s dominant source of lithium production Rincon Project – Stage 1 Pilot Plant Company fully fund

  17. Slide 17: For personal use only

    For personal use only Jerko Zuvela - Managing Director T +61 8 6188 8181 Level 3, 216 St Georges Terrace PERTH WA 6000 Australia Email: jerko@argosyminerals.com.au ASX Code: AGY www.argosyminerals.com.au

Argosy Minerals — Investor Presentation (May 2018) on 6ix