Slide 1: Pathway to Near Term Gold Production
PC GOLD LTD Pathway to Near Term Gold Production SEPTEMBER 2026 PC Gold Limited ACN 609 609 047 ASX:PC2 FSE: D6A PC GOLD INVESTOR PRESENTATION ASX: PC2 1
Slide 2: Investment Highlights
INVESTMENT HIGHLIGHTS 100% Owned Spring Hill Gold Project – Tier 1 Jurisdiction Granted ML, Large Historic Goldfield in the Northern Territory, <2.5hrs from Darwin. 84% increase to MRE, Global Resource of 1.51 Moz Au at 1.1 g/t Au 1Moz Au Indicated at 1.1 g/t Au (Up 136%) – growth driven by Photon A
Slide 3: Capital Structure and Shareholders
CAPITAL STRUCTURE SHAREHOLDERS 21.4% Share Price Cash3 Institutional $1.05 ~$95M 46.0% Rivi Opportunity Fund 2 (Aug-26 Fund Raise) 19.8% Management / Board 2 Other – ~1,200 shareholders Shares on Issue Market Cap 13.1% 387M 1,2 ~$405M SHARE PRICE PERFORMANCE Price ($) Volume (m) BROKER COVERAGE $1.6
Slide 4: Board & Management
BOARD & MANAGEMENT Ash Pattison Rob Jewson Kevin Puil Rick Clark Matt Scully John Lewis EXECUTIVE CHAIR / CEO TECHNICAL DIRECTOR NON-EXEC DIRECTOR NON-EXEC DIRECTOR NON-EXEC DIRECTOR COMPANY SECRETARY Founder Founder / Mammoth Founder / Dakota Gold Ex- Redback / Montage Many Peaks Ex Perseus / WAF S
Slide 5: Spring Hill Gold Project: Achievements Since Oct '25 IPO
SPRING HILL GOLD PROJECT ACHIEVEMENTS SINCE OCT ‘25 IPO • 25,900m drilled and assayed safely to 25 April 2026 for MRE update o Interim MRE up 84%, Indicated Resource up 136% • More than 13,000m of diamond and 8,000m of RC completed since • Discovery of the high grade Macau Link Zone and identificati
Slide 6: Spring Hill within Pine Creek Goldfield
SPRING HILL GOLD PROJECT SPRING HILL WITHIN PINE CREEK GOLDFIELD • World-class +20 Moz Pine Creek goldfield, NT – a premier Australian gold province. • Idle 2.4 Mtpa Union Reef CIL plant just 26 km by road; three new CIL plants permitted nearby in 18 months. • Established infrastructure – close to D
Slide 7: Scale and Grade Potential Still Evolving
SPRING HILL GOLD PROJECT SCALE AND GRADE POTENTIAL STILL EVOLVING – FOCUS FOR REMAINDER 2026 • High-grade bulk tonnage sheeted vein system – typical of major Pine Creek deposits. • Three key zones defined across a +3 km corridor north of the MRE. • Bulk-tonnage open pit / underground (<15% of the kn
Slide 8: A Resource Built to Grow
A RESOURCE BUILT TO GROW INTERIM MRE (25 APRIL 2026 CUT-OFF) – OPEN IN EVERY DIRECTION, WITH ~40,000M OF DRILLING ALREADY UNDERWAY 1.51 Moz 1.0 Moz ~40,000m INTERIM MRE INDICATED – UP 135% DRILLING UNDERWAY at 1.1 g/t Au Confidence to drive the PFS Post 25 April assay cut-off Not closed off in any d
Slide 9: Updated Long Section of the Resource at 1.51Moz
SPRING HILL GOLD PROJECT UPDATED LONG SECTION OF THE RESOURCE AT 1.51Moz – 1.2KM STRIKE LENGTH 1.2KM OPEN PC GOLD INVESTOR PRESENTATION ASX: PC2 9
Slide 10: Strike of 1.2km - Grade Intensity Improves at Depth
STRIKE OF 1.2KM - GRADE INTENSITY IMPROVES AT DEPTH AVERAGE OUNCES PER VERTICAL METRE RISE SHARPLY ON HITTING LINK ZONE AND STAY HIGH ABOVE 365M “Average OVM ~2,600” PC GOLD INVESTOR PRESENTATION ASX: PC2 10
Slide 11: High-Grade Underground Potential
HIGH-GRADE UNDERGROUND POTENTIAL LINK ZONE DISCOVERIES & RE-OPENING OF THE HISTORICAL ADIT TARGETING HIGH-GRADE UG OPPORTUNITY LINK ZONE DISCOVERIES • Historical drilling intersecting the pelite layers within the modelled stratigraphy are reporting much higher gold grades than those holes intersecti
Slide 12: 2026 Work Program Ongoing
SPRING HILL GOLD PROJECT 2026 WORK PROGRAM ONGOING DRILLING – 40,000m in 2026 not in MRE FEASIBILITY STUDY WORK Four rigs currently operating (three Diamond, one RC), driving rapid resource growth PFS work ongoing - Due in late 2H, 2026 and resource conversion. More ounces to be added. Phase 3 Resou
Slide 13: 2026 PFS Metallurgical Results
2026 PFS METALLURGICAL RESULTS VERY ROBUST RECOVERIES ACROSS ALL DOMAINS FOR LIFE OF MINE • Gravity gold recoveries range between 33.1 to 48.9% • Bond Ball Work Index and SMC testwork indicate the weathered and transitional zones are soft and fresh is moderately hard. All domains reported very low a
Slide 14: Pine Creek Infrastructure
PINE CREEK INFRASTRUCTURE ACCOMMODATION VILLAGE WORKS UNDERWAY PHOTON ASSAY LAB COMMITTED TO Photon Assay Lab Location = • 64-Rooms, Admin Office, Dry/Wet Mess • 1kg sample size versus 50g for fire assay • Refurbishment underway • 2-5 day turnaround versus +5 weeks • Expandable to +200rooms • Non de
Slide 15: Thank You!
THANK YOU! PC GOLD INVESTOR PRESENTATION ASX: PC2 15
Slide 16: More Information
MORE INFORMATION Ashley Pattison Investor Relations Executive Chair & CEO Paul Berson T: +61 8 6313 3996 T: +61 (0) 421 647 445 E: admin@pcgold.com.au E: paul@corporatestorytime.com U38/460 Stirling Highway Peppermint Grove WA 6011 Australia pcgold.com.au PC GOLD INVESTOR PRESENTATION ASX: PC2 16
Slide 17: Mineral Resource by Zone
MINERAL RESOURCE BY ZONE TOTAL RESOURCE UP 84% TO 1.51 MOZ AU, LED BY HK/MACAU, MAIN GROWTH AND THE NEW LINK ZONE JUNE 2026 MRE JUNE 2024 MRE Zone Tonnes g/t Oz Au Tonnes g/t Oz Au INDICATED Hong Kong / Macau 18,852,298 0.9 563,000 10,911,980 1.0 342,200 Macau Link 689,873 5.2 114,500 – – – Main 8,3
Slide 18: Disclaimer & Competent Persons Statement
18 DISCLAIMER & COMPETENT PERSONS STATEMENT IMPORTANT NOTICE AND DISCLAIMER The following important notice and disclaimer applies to this investor presentation and you are therefore General advised to read this carefully before making any use of this presentation or any information contained in this