Element 25 Limited · ASX:E25
Element 25 — Montezuma Mining Company — Corporate Update (November 2012)
21 slides from Element 25's corporate update, November 2012
Slide 1: Company Update November 2012
COMPANY UPDATE NOVEMBER 2012 MANGANESE Large tonnages of beneficiable manganese mineralisation. Commercial Studies and approvals process ongoing. COPPER Drill testing of IP targets within Butcherbird Structural corridor. Extension drilling increases Cu mineralisation to over 700m. Landholding now co
Slide 2: Disclaimer
Disclaimer This presentation contains only a brief overview of Montezuma Mining Company Ltd and its associated entities (“Montezuma") and their respective activities and operations. The contents of this presentation, including matters relating to the geology of Montezuma’s projects, may rely on vari
Slide 3: Corporate Snapshot (listed 9 November 2006)
Corporate Snapshot (listed 9 November 2006) Board of Directors Market Data Seamus Cornelius Chairman Shares on Issue: 69.7M Justin Brown MD Share Price: $0.20 John Ribbons Director Market Cap: $14M Cash: ~$7M Share Price ASX Code: MZM 52 week high: $0.80 Share Register 52
Slide 4: Butcherbird Manganese
BUTCHERBIRD MANGANESE yh aor
Slide 5: Butcherbird Project
Butcherbird Project Proven manganese and copper potential. Excellent local infrastructure: Straddles the Great Northern Highway Goldfields Gas Pipeline runs through the project tenure. Approx. 550km to Port Headland. Drilling has confirmed large tonnages of beneficiable manganese and goo
Slide 6: Why Manganese?
Why Manganese? Critical in modern steel-making. No satisfactory substitute. While manganese is abundant globally, high-grade manganese is not. Global high-grade manganese sector is dominated by just a handful of players. Demand will continue to rise on parallel with increasing global steel p
Slide 7: Montezuma Mining Company map
MONTEZUMA MINING COMPANY LTD MAP LEGEND ] Resource Areas Mining Lease Application (—) exploration License BREE 2 sage . Budgie Hills, a jligararie Ridge —. —— oe ~ — a J ag nc % m Cadgies F — i > Bindi Bindi Hill rn |! i Cood musal a al = J — Ritchies, cise - = ~~ Mundawindi ~— Yanineri Ridg) kilome
Slide 8: Inferred Resource Estimates completed for eight deposits
• Inferred Resource Estimates completed for eight deposits. • Significant upside potential to the global resource with further drilling. • Potential for additional discoveries.
Slide 9: All intersections are approximately true width
All intersections are approximately true width
Slide 10: Unique Geology
Unique Geology • Geology allows for low cost beneficiation to commercial grades.
Slide 11: Independent Scoping Study
Independent Scoping Study Scoping Study positive based on production of 0.5 Mt to 1 Mt per annum. Projected NPV10 (10% discount rate) of up to AUD$376M with IRR of up to 59%. Pre-feasibility work has commenced on processing options for the Mn ore. Some Key Assumptions Long term manganese pri
Slide 12: Strategy Going Forward
Strategy Going Forward Native Title Agreement terms with the Ngarlawangga People have been agreed. Complete environmental studies and mining approvals: Stage 1 Beneficiable Detrital Ore material to potentially provide low capex/opex saleable material and; Stage 2 Large scale beneficiable mat
Slide 13: Butcherbird Copper
COMPANY LTD MINING MONTEZUMA ce Lid a. a. O UO a) ce co ce Lu a UO - a) co
Slide 14: Copper Exploration
Copper Exploration Recent drilling has tested IP targets and NE strike extension at Butcherbird Prospect. Drilling has extended known Cu mineralisation at Butcherbird to over 700 m. 6 m @ 2.0% and 9 m @ 1.1% Cu in BBRC00220 Copper mineralisation still open along strike and down dip. Prelimin
Slide 15: Butcherbird Copper Project
Butcherbird Copper Project BBRC0153: E52/2350 61m @ 1.96% Cu from 113m (including 6m @ 6.08% Cu) *hole ends in mineralisation INSET AREA (NEXT SLIDE) E52/2658 All intersections are downhole width
Slide 16: Butcherbird Copper Prospect
BBRC00220: Butcherbird Copper Prospect 6m @ 2.00% Cu from 114m and; 9m@ 1.10% cu from 127m E52/2350 BBRC00218: 1m @ 3.28% Cu from 112m and; 13m @ 0.60% Cu from 119m BBRC00153: 61m @ 1.96% Cu from 113m (including 6m @ 6.08% Cu) *hole ends in mineralisation
Slide 17: Peak Hill Gold Mine
Ww PEAK HILL GOLD MINE sg ce
Slide 18: Peak Hill Gold Mine
Peak Hill Gold Mine Over 500K ounces of JORC Resources in a goldfield that has produced over 900K ounces. Numerous targets for further drilling to expand the existing resource base.
Slide 19: Peak Hill Gold Mine
Peak Hill Gold Mine Option agreement signed with Grosvenor Gold Pty Ltd ("Grosvenor"), a wholly owned subsidiary of Resource and Investment NL (ASX: RNI) (“RNI”) whereby Grosvenor may acquire 100% of Montezuma’s interest in the Peak Hill Project. Settlement is a combination of cash, shares and r
Slide 20: Contact Details
Contact Details Please direct queries to: Justin Brown (Managing Director) Mobile: +61 438 745 675 Email: info@montezumamining.com.au Website: http://www.montezumamining.com.au
Slide 21: Competent Persons Statement
Competent Persons Statement Note: The information in this presentation that relates to Exploration Results, and Mineral Resources is based on information compiled by Mr Justin Brown who is a full-time employee of the Company and is a member of the Australasian Institute of Mining and Metallurgy. J
Montezuma Mining Company — Corporate Update (November 2012) on 6ix