Rokmaster Resources Corp. · TSXV:RKR

Rokmaster Resources — Investor Presentation (May 2021)

38 slides from Rokmaster Resources's investor presentation, May 2021

  1. Slide 1: Expanding the Gold – Polymetallic Revel Ridge Project

    Slide 1: Expanding the Gold – Polymetallic Revel Ridge Project

    ROKMASTER RESOURCES CORP. TSX.V: RKR OTCQB: RKMSF FSE: 1RR1 Expanding the Gold – Polymetallic Revel Ridge Project “One B.C’s largest undeveloped precious & polymetallic deposits” J Corporate Presentation – May, 2021 www.rokmaster.com

  2. Slide 2: Cautionary Statement

    Slide 2: Cautionary Statement

    2 Cautionary Statement This presentation contains “forward-looking information” within the meaning of applicable Canadian securities regulations and “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 (collectively, “forward-looking i

  3. Slide 3: Experienced Team

    Slide 3: Experienced Team

    3 Experienced Team ▪ John Mirko President, CEO & Director: Mr. Mirko has 48 years’ experience in the mining industry and is currently the founder & President of Canam Mining Corporation & President & CEO of Rokmaster Resources Corp. He was the founder & President of Canam Alpine Resources Ltd. prior

  4. Slide 4: Experienced Team Cont.

    Slide 4: Experienced Team Cont.

    4 Experienced Team Cont. ▪ Dennis Cojuco, CFO and Corporate Secretary: Mr. Cojuco is a graduate of the University of British Columbia (BSc. Chemistry and Diploma in Accounting) and is a Chartered Accountant in British Columbia. Mr. Cojuco articled and was a Senior Associate with PricewaterhouseCoope

  5. Slide 5: Experienced Team Cont.

    Slide 5: Experienced Team Cont.

    5 Experienced Team Cont. ▪ Harvey Tremblay, Drilling and Business Advisor: Mr. Tremblay is the founder and Chairman of Hy-Tech Drilling Ltd., based in Smithers, BC. In 1991 he founded Hy-Tech Drilling and built it up from a single drill operation to a fleet of 35 drills operating throughout Canada a

  6. Slide 6: Share Structure and Contact Information

    Slide 6: Share Structure and Contact Information

    6 Share Structure and Contact Information Trading Symbols: Address: RKR (TSX.V) 1150-625 Howe Street RKMSF (OTCQB) Vancouver, B.C. V6C 2T6 1RR1 (Frankfurt) Canada Share Information: Contact: Issued and Outstanding 103,881,712 Stock Options 6,900,000 Email: info@rokmaster.com Share Purchase Warrants

  7. Slide 7: Rokmaster 2020 Share Price & Events

    Slide 7: Rokmaster 2020 Share Price & Events

    7 Rokmaster 2020 Share Price & Events

  8. Slide 8: Revel Ridge Project Location – Southwest British Columbia

    Slide 8: Revel Ridge Project Location – Southwest British Columbia

    8 Revel Ridge Project Location – Southwest British Columbia

  9. Slide 9: Revel Ridge Property - 14,277 Ha

    Slide 9: Revel Ridge Property - 14,277 Ha

    9 Revel Ridge Property - 14,277 Ha Significant replacement value in today’s dollars: • 12.5 km year-round road access road off Hwy.23 N • >3 km of operating underground workings • 41,000 metres of historic diamond drilling in 315 holes • Mining equipment, underground & surface facilities • All diamo

  10. Slide 10: Merits Of The Project

    Slide 10: Merits Of The Project

    10 Merits Of The Project Mineral Resource Estimate: Main (gold rich) Zone (“RRMZ”) tonnes and grade include: RRMZ M&I: 4,200,000 MT / 1,089,000 ounces AuEq @ 8.07 g/t AuEq * RRMZ Inf: 4,562,000 MT / 961,000 ounces AuEq @ 6.55 g/t AuEq * (excludes Hanging Wall and Footwall Zone resources) RRYZ Ind: 7

  11. Slide 11: Current Resource Estimate

    Slide 11: Current Resource Estimate

    11 Current On February 25, 2020, Rokmaster filed a Technical Report on SEDAR entitled “Updated Technical Report on the Revel Ridge Property (formerly J&L Property), Revelstoke Mining Division, British Resource Columbia, Canada” dated January 29, 2020, authored by Eugine Puritch, P.Eng, FEC, CET; Fre

  12. Slide 12: Mineral Resource Estimate Notes

    Slide 12: Mineral Resource Estimate Notes

    12 Mineral Resource Estimate Notes • Note: k = thousands, koz = thousand of ounces • Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability. The estimate of Mineral resources can be materially affected by environmental permitting, legal, title, taxation, socio-p

  13. Slide 13: 100% Option – Cash Only

    Slide 13: 100% Option – Cash Only

    13 100% Option – Cash Only Option to Purchase Property + Huakan Company Shares ▪ 5-year Cash Only Option - to own 100% ✓ No share payments ✓ No Royalties or retained interest ✓ No minimum work commitments ✓ No back-in or claw-back clauses ✓ Tax loss carry forward of approximately C$35,900,000 ✓ Reso

  14. Slide 14: Merits of the Deal

    Slide 14: Merits of the Deal

    14 Merits of the Deal ▪ Replication value significantly much higher than the purchase price. ▪ Wide open expansion potential - option to acquire 100% of an “under the radar” multi-million ounce AuEq resource with tremendous blue sky targets based on undrilled mineralized zones along >8 km structural

  15. Slide 15: Geology and Mineralization

    Slide 15: Geology and Mineralization

    15 Geology and Mineralization • The RRMZ is a remarkably continuous, large, tabular, structurally controlled, orogenic gold system. Where drilled and exposed underground the zone averages 2.5 m in thickness over the historically diamond drilled and drifted 1,500 m X 800 m portion. Progressive deform

  16. Slide 16: Project and Deposit Scale Geology

    Slide 16: Project and Deposit Scale Geology

    16 Project and Deposit Scale Geology

  17. Slide 17: Isometric Projection of RRMZ Mineral Resource Domains

    Slide 17: Isometric Projection of RRMZ Mineral Resource Domains

    17 Isometric Projection of RRMZ Mineral Resource Domains – Looking W (2012 Data) Main Zone (RRMZ) Yellowjacket Zone (RRYZ) Hanging Wall Zone Footwall Zone

  18. Slide 18: Targeting District Scale Au–Ag Occurrences

    Slide 18: Targeting District Scale Au–Ag Occurrences

    18 Targeting District Scale > 50 Au–Ag Occurrences ▪ More than 50 Au-Ag occurrences over 7 – 8 km ▪ Mineralization forming over 1200 m vertical ▪ Common structural and lithologic elements ✓ No. 2 Showing ✓ No. 2 Shaft ✓ 986 m Drift ✓ 830 m Drift ✓ North Zone ✓ Roseberry Zone ✓ A & E Zone ➢ Target hi

  19. Slide 19: Low Exploration Risk – High Upscale

    Slide 19: Low Exploration Risk – High Upscale

    19 Low Exploration Risk – High DDH – RR-21-28 Upscale • Relatively short DDH’s • Untested surface mineralized zones • Simple target model, planar deformation zone • “Low hanging fruit” existing mineralized DDH’s with no follow-up • Limited historic drilling, 315 DDHs: 41,075 m • Approximate 2.0 M Au

  20. Slide 20: DDH RR20-11 & DDH RR20-12

    Slide 20: DDH RR20-11 & DDH RR20-12

    20 DDH RR20-11 & DDH RR20-12 • RR20-11 step out about 90 m down the dip plane Near continuous mineralized plane • RR20-12 step out additional 75 m down dip plane Down dip now may exceed 500 m below 830 M Level

  21. Slide 21: DDH RR20-11 288.6 m to 294.77 m

    Slide 21: DDH RR20-11 288.6 m to 294.77 m

    21 DDH RR20-11 288.6 m to 294.77 m 288.64 – 290.47 • 1.83 m @ 9.54 g/t Au, 75.66 g/t Ag, 3.81% Pb, 10.91% Zn (17.30 g/t AuEq) 288.64 – 292.56 • 3.92 m @ 5.28 g/t Au, 43.22 g/t Ag, 1.95% Pb, 6.96% Zn (9.97 g/t AuEq) 286.40 – 294.77 • 8.37 m @ 2.76 g/t Au, 23.35 g/t Ag, 0.95% Pb, 3.39% Zn (5.09 g/t Au

  22. Slide 22: Drilling “Backwards” Testing RRMZ to North East

    Slide 22: Drilling “Backwards” Testing RRMZ to North East

    22 Drilling “Backwards” Testing RRMZ to North East • Collar azimuth of borehole parallel to dip-direction. • Use rock foliation to deflect rods down, effectively “wedging naturally”. • Boreholes bend or drop onto mineralized plane. • Access large volumes of untested down-dip rock with no new UG deve

  23. Slide 23: Drill Highlights - News Release – March 29, 2021

    Slide 23: Drill Highlights - News Release – March 29, 2021

    23 Drill Highlights - News Release – March 29, 2021 • 4.53 g/t AuEq over 26.20 m DDH RR21-28 inc. 10.09 g/t AuEq / 3.3 m • 3.18 g/t AuEq over 10.88 m DDH RR20-16 inc. 7.14 g/t AuEq / 1.48 m • 2.05 g/t AuEq over 12.70 m DDH RR21-25 inc. 3.83 g/t AuEq / 2.62 m • 3.41 g/t AuEq over 8.18 m DDH RR20-14 i

  24. Slide 24: RRMZ 2020 - 2021 Down Plane DDH’S

    Slide 24: RRMZ 2020 - 2021 Down Plane DDH’S

    24 RRMZ 2020 - 2021 Down Plane DDH’S

  25. Slide 25: 2021 PEA Highlights – Revel Ridge

    Slide 25: 2021 PEA Highlights – Revel Ridge

    25 2021 PEA Highlights – Revel Ridge ➢ High-grade underground mine with mill-feed averaging $300/T NSR value (diluted) comprised of the Main Zone with 9.39 MT averaging 4.24 g/t Au, 49.8 g/t Ag, 2.62 % Zn, 1.63 % Pb (diluted) and the Yellow Jacket Zone 0.65 MT averaging 7.47% Zn, 1.90% Pb, 43.0 g/t

  26. Slide 26: Peer Group Market Cap Comparison - Pure Gold Mining

    Slide 26: Peer Group Market Cap Comparison - Pure Gold Mining

    26 Peer Group Market Cap Comparison- Assigned In Ground (in situ) Gold Value Per Oz, all categories. Pure Gold Mining – Market Cap ~$489 M Madsen Red Lake Project (Pure Gold Website data April, 2021): ▪ Indicated: 7.2 M tonnes @ 8.9 g/t Au - 2.06 M oz’s Au ▪ Inferred: 1.9 M Inf. tonnes @ 7.7 g/t – 4

  27. Slide 27: Peer Group Market Cap Comparison - Ascot Resources

    Slide 27: Peer Group Market Cap Comparison - Ascot Resources

    27 Peer Group Market Cap Comparison- Assigned In Ground Gold Value Per Oz, all categories. Ascot Resources – Market Cap ~$347 M Premier Project (Ascot website data April, 2021): ▪ Indicated: 4.14 M tonnes @ 8.01 g/t Au, 35.1 g/t Ag, 1.1 M AuEq oz’s. ▪ Inferred: 5.06 M tonnes @ 5.06 g/t Au, 28.7 g/t

  28. Slide 28: Peer Group Market Cap Comparison - Rokmaster

    Slide 28: Peer Group Market Cap Comparison - Rokmaster

    28 Peer Group Market Cap Comparison, Assigned In Ground Gold Value Per Oz, all categories. Rokmaster Resources Corp. – Market Cap ~$33 M Revel Ridge Project (RKR Website, May 2020): ▪ Measured and Indicated: 4.2 M tonnes, 5.59 g/t Au, 53.4 g/t Ag, 1.87% Pb, 3.43% Zn - 1.09 M AuEq oz’s. ▪ Inferred: 4

  29. Slide 29: Metallurgy

    Slide 29: Metallurgy

    29 Metallurgy ▪ Flotation – Summary of Main Zone Variability Locked Cycle Tests – 2014 Mill Feed – HMS Sinks Primary Grind 30µm Regrind K80 10-15µm K80 Lead Flotation Lead Concentrate Zinc Flotation Zinc Concentrate Bulk Sulphide Sulphide Gold Flotation Concentrate Tailings ▪ Yellowjacket LCT averag

  30. Slide 30: Metallurgy – Gravity

    Slide 30: Metallurgy – Gravity

    30 Metallurgy ▪ Gravity Gravity Gold Recovery Relationship 160 14 140 12 120 10 100 Grade (g/t Au) Mass Pull (%) 8 80 6 60 4 40 20 2 0 0 0 10 20 30 40 50 60 Recovery (% Au) Grade vs Recovery MP vs Recovery

  31. Slide 31: Metallurgy Mineralogy – Arsenopyrite

    Slide 31: Metallurgy Mineralogy – Arsenopyrite

    31 Metallurgy Mineralogy – Arsenopyrite Gold Concentrate: Arsenic vs Gold Grade ▪ Recent D-SIM work at the University of Western 40 Ontario concludes: 35 ▪ The sub-microscopic gold detected is refractory 30 gold. 25 Gold (g/t) ▪ The gold is locked within the crystalline structure 20 of the mineral p

  32. Slide 32: Process - Simplified Process Flow Sheet

    Slide 32: Process - Simplified Process Flow Sheet

    32 Process - Simplified Process Flow Sheet Run Of Mine ~1650 tpd ~2300 tpd Rec.% Current PEA/Proposed Au – 99.5 Ag – 98.3 Pb – 99.0 Gravity Circuit Lead Flotation Zinc Flotation Sulphide Float Zn – 98.0 Ore Tails Bin Regrind Gold Concentrate 10-15µm K80 Mass Pull – 59% = ~974tpd Rec.% Grade DMS/Sort

  33. Slide 33: On-Site Process Plant (Total RR Footprint - Small)

    Slide 33: On-Site Process Plant (Total RR Footprint - Small)

    33 On-Site Process Plant (Total RR Footprint - Small) [each square below is 100 metres]

  34. Slide 34: Process – Pressure Oxidation

    Slide 34: Process – Pressure Oxidation

    34 Process – Pressure Oxidation https://www.youtube.com/watch?v=BA7QhVi20Yw Outotec Pressure Oxidation Package Plant POX Plant rendition Source & Permission: Metso:Outotec Group

  35. Slide 35: Pressure Oxidation Process “POX”, what is it?

    Slide 35: Pressure Oxidation Process “POX”, what is it?

    35 Pressure Oxidation Process “POX”, what is it? ▪ POX is used to prepare arsenopyrite gold ores for conventional gold extraction processes like CIL. It is performed in an autoclave (at high pressure 50-100 psi and temperature 190-230oC) where high-purity oxygen mixes with a slurry of ore. ▪ When th

  36. Slide 36: POX Process, cont.

    Slide 36: POX Process, cont.

    36 POX Process, cont. ▪ Not new technology – Outotec has been building autoclaves since 1965. Gold POX Plants Operating in 2021 ▪ Commercial breakthrough of the technology in • Amursk - Polymetal mid-1980’s. • Twin Creek - Newmont • Porgera - Barrick, Zijin, PNG ▪ POX project cost over-runs in Russi

  37. Slide 37: 2021 Proposed Work Plan and Budget

    Slide 37: 2021 Proposed Work Plan and Budget

    37 2021 Proposed Work Plan and Budget 2nd Option Payment (paid): $1,000,000 >16,000 m surface and underground diamond drilling: $5,000,000 Mine Permitting, Variability Sampling & Metallurgy: $1,500,000 Mine & mill engineering: $1,000,000 Contingency: $500,000 Total year two: CDN$9 Million Revelstoke

  38. Slide 38: Summary & Conclusions

    Slide 38: Summary & Conclusions

    38 Summary & Conclusions ▪ RKR executed on the opportunity to option 100% of an “under the radar” approximate two million ounce AuEq deposit with very significant exploration upside, target potential of 2-5 million additional AuEq ounces. ▪ Potential for ~5 g/t Au grades + substantial by-product cre

Source: Internet Archive copy of rokmaster.com

More decks from Rokmaster Resources Corp.