Strike Resources Limited · ASX:SRK

Strike Resources — Shareholder Meeting (September 2006)

22 slides from Strike Resources's shareholder meeting presentation, Sep 13, 2006

  1. Slide 1: Annual General Meeting

    Annual General Meeting Perth 2006 Shanker Madan Managing Director

  2. Slide 2: Strike Resources Limited

    Strike Resources Limited An International Energy & Resources Company - Uranium - Iron Ore - Gold/Copper 2

  3. Slide 3: Strike Resources Limited

    Strike Resources Limited Strategic mineral assets Advanced targets Key portfolio of landholdings Global demand 3

  4. Slide 4: Excellent Management Team

    Excellent Management Team Experienced Directors Shanker Madan – Managing Director John Stephenson – Chairman Farooq Khan Victor Ho William Johnson 4

  5. Slide 5: Tight Capital Structure

    Tight Capital Structure 48m Shares (SRK) 27m Options (SRKO) 4.6m Directors’ Options 120 100 Peru agreement re-negotiated 80 Peru Iron Ore announced 60 40 20 0 15/03/2006 29/03/2006 12/04/2006 26/04/2006 10/05/2006 24/05/2006 21/06/2006 19/07/2006 16/08/2006 30/08/2006 1/03/2006 7/06/2006 5/07/2006 2

  6. Slide 6: Projects - Peru

    84 ee : / J Gee ya Ph A “Ee Project location Pan-American highway Road River/drainage nA oS APURIMAC PROJECT | = j ap = é s Y ‘ < Ses | \ 2 Town _ ve Ss. ON . Rad, We e \ ANDAHUAYLAS es Uc [APURIMAC, A : SH \ ; J APURIMAC \ Val ‘ i ms jon : Main roads aa! Drainage —— Town 4 , \

  7. Slide 7: Peru - Apurimac Project

    Peru - Apurimac Project Advanced Iron Exploration Targets Opaban I – Resource target of 210-260 million tonnes. Opaban III – JORC Inferred Resource of 21 million tonnes @ 63.1% Fe. Prominent adjacent targets within Cristoforo 22, Los Andes 1 & MAPSA 2001 concession areas. Resource potential at Pampa

  8. Slide 8: Concession area

    Concession area 21 Concessions = 18488Ha Close to city of Andahuaylas 8

  9. Slide 9: Gravity Survey

    Gravity Survey 21Mt Inf. Res. @ 63% Fe Opaban III Gravity Anomaly Estimated Res Opaban I >10 X Opaban III Opaban I Gravity Anomaly 9

  10. Slide 10: Drill Results – Opaban I & III

    Drill Results – Opaban I & III Summary 31 diamond core holes = 2667m Intersections include: Opaban I Opaban III OP018 – 87.9m @ 63% OP002 – 69m @ 64.5% OP020 – 128m @ 60% OP005 – 63m @ 63.7% OP021 – 76.6m @ 62% OP008 – 105.4m @ 62.5% OP023 – 53.1m @ 61% OP012 – 82.5m @ 61.2% OP013 – 74.5m @ 63.6% Th

  11. Slide 11: Peru - Cuzco Project

    Peru - Cuzco Project Iron Exploration Target Preliminary work conducted Mapping Ground Magnetic Survey data Site Inspection Estimated 500Mt resource @ +64% Fe 11

  12. Slide 12: Concession Area

    Concession Area 80km south of Cuzco 400km from coast 6 Concessions = 4926Ha Cuzco Project Area 12

  13. Slide 13: Projects - Australia

    Ie Strike Resources Limited Project Location £2 Significant deposit ® Uranium mine JABILUKA Ranger 4 KOONGARRA Derby WESTMORELAND {a | Northern | Territory Port Hedland [52 VALHALLA ® KINTYRE : she [canning we | | we | Bigrlyi South | mos Springs : ANGELA ; we | ml Queensland —-—-—-—-—--1._.5 YEELIR

  14. Slide 14: Australia – Paulsens East Project

    Australia – Paulsens East Project Iron & Gold Exploration Target 14

  15. Slide 15: Paulsens East – Exploration Programme

    Paulsens East – Exploration Programme ƒ Site Inspection & Rock Chip Sampling conducted – 65% Fe ƒ DOIR & DLI Approval ƒ Aboriginal Heritage Survey Clearance ƒ Gravity Survey ƒ RC Drilling - Scheduled to commence in October 15

  16. Slide 16: Australia – Bigrlyi South Project

    Australia – Bigrlyi South Project Uranium Exploration Target •5 Tenements = 1666km •Delineate primary mineralisation along existing thrust faults and fold hinges. •4 known but untested uranium anomalies 16

  17. Slide 17: Bigrlyi South – Exploration Programme

    Bigrlyi South – Exploration Programme CLC/Indigineous Approval Site Investigation Photogeological Interpretation Radiometric Surveying 17

  18. Slide 18: Australia – Mt James Project

    Australia – Mt James Project Uranium Exploration Target •4 Tenements = 427km •Shallow carnotite mineralisation in lateritic profile •Deeper uraninite mineralisation in pegmatitic veins in the gneissic rocks – vein type deposits •0.17% U3O8 for 0.2m at 69.5m in a diamond core hole •12 known but unte

  19. Slide 19: Australia - Mt Lawrence Project

    Australia - Mt Lawrence Project Uranium Exploration Target •3 Tenements = 90km •Palaeo drainage feeding into Lake Way with Hinkler, Centipede and Millipede uranium occurrences •Hinkler Well uranium bearing channel and the gravels that cover the northern extent of the channel extend into Strike’s te

  20. Slide 20: Australia – Canning Well Project

    Australia – Canning Well Project Uranium & Gold Exploration Target •2 Tenements = 280km •1 uranium anomaly from Lag sampling •3 gold anomalies from Stream sampling 20

  21. Slide 21: Projects - Indonesia

    Projects - Indonesia •Concession area = 5601Ha •Epithermal gold vein targets and potential for gold stock work systems •Target for porphyry copper mineralisation •Potential for rich pods of hydrothermal lead and zinc mineralisation 21

  22. Slide 22: THANK YOU

    THANK YOU The information in this presentation that relates to exploration results has been compiled by Mr Hem Shanker Madan who is a Member of The Australian Institute of Mining and Metallurgy. Mr Madan is the Managing Director of the Company. Mr Madan has in excess of 5 years experience which is r

Strike Resources — Shareholder Meeting (September 2006) on 6ix