Gold Fields Limited · JSE:GFI

Gold Fields — Corporate Update (February 2013)

39 slides from Gold Fields's corporate update, Feb 8, 2013

  1. Slide 1: Overview of the South Deep Project Investors Visit

    Overview of the South Deep Project Investors Visit 08 February 2013

  2. Slide 2: Forward looking statements

    Forward looking statements Certain statements in this document constitute “forward looking statements” within the meaning of Section 27A of the US Securities Act of 1933 and Section 21E of the US Securities Exchange Act of 1934. In particular, the forward looking statements in this document include

  3. Slide 3: Our Vision and Values

    Our Vision and Values South Deep Site Visit, 8 February 2012 KM Page 3

  4. Slide 4: Locality – Witwatersrand Gold Fields

    Locality – Witwatersrand Gold Fields South Deep JOHANNESBURG Scale 0 100KM CARLETONVILLE EVANDER POTCHEFSTROOM KLERKSDORP GREYLINGSTAD WESTERN DEEP LEVELS VREDEFORT KROONSTAD WELKOM LEGEND Central Rand Group West Rand Group ƒ Historic production: > 1 600 000 000 oz of gold ƒ 4.5bn tons of ore treate

  5. Slide 5: Locality – South Deep

    Locality – South Deep South Deep Site Visit, 8 February 2012 KM Page 5

  6. Slide 6: History

    History • 1950: Prospecting in the area commenced • 1961: Production at Western Areas Gold Mine (WAGM) commenced • 1999: Placer Dome Western Areas (PDWA) Joint Venture (JV) formed • 2000: Name changed to South Deep Gold Mine • 2005: Twin Shaft Complex opened • 2006 Gold Fields acquired Barrick’s 50%

  7. Slide 7: Safety

    Safety LDIFR FIFR 25 1.2 21.29 0.93 20 0.8 15 10 5.78 0.4 5 2.8 2.4 0.12 2.3 1.9 0.07 0.06 0 0 0 0 F2008 F2009 F2010 F2011 C2011 C2012 F2008 F2009 F2010 F2011 C2011 C2012 SIFR 8 6.66 6 4 2.11 2 1.1 0.84 1.09 0.98 0 F2008 F2009 F2010 F2011 C2011 C2012 WORLD CLASS SAFETY STANDARDS South Deep Site Visi

  8. Slide 8: Overview – building a world class mine

    Overview – building a world class mine World class reserve well understood • Landmark Union Agreement on new Operating Model – 2 October 2012 • Production build-up to run-rate of 700 Koz by end of 2015 • De-stress development increased 75% year on year. • Self-funding by end of 2013 Major progress o

  9. Slide 9: New Operating Model

    New Operating Model Multi-phased approach to support South Deep ramp-up by 2015 1 Vision: 1 Phase 1: CHANGE Phase 2: OPTIMISE Phase 3: IMPROVE Future operating model General business 6 union on neengagement initiatives ives initiatives processes 1.1 2.1 O ORG UNIT DESIGN Capital Infrastructure A 1.2

  10. Slide 10: Our People

    Our People • Employ approximately 3,500 people on operation – full production will employ 4,000 people (excluding working cost contractors) − Additional ~2,800 people in capital expansion project • Diverse workforce • Well trained and qualified personnel • Well paid and incentivised personnel • Worl

  11. Slide 11: Sustainable Development

    Sustainable Development Environmental Management • Management of environmental aspects in line with latest legislative requirements • Environmental Management Systems according to best practice international standards (ISO14001 certified) • Water Management – Water use license • International Cyanid

  12. Slide 12: Geology - Exploration

    Geology - Exploration Surface Pretoria Group Chuniespoort Group Black Reef Base at ± 1800mbc Klipriviersberg Group VCR Base at ± 3000mbc D5 D3 D4 Upper D1 D2 Elsburgs D7 Orig. D6 D8 South Deep Site Visit, 8 February 2012 MK Page 12

  13. Slide 13: Geology - Orebody

    Geology - Orebody South Deep Site Visit, 8 February 2012 MK Page 13

  14. Slide 14: Geology – Down-dip extension

    Geology – Down-dip extension Mining Areas Ezulwini Cooke 3 Twins Shafts South Shaft Surface 2400 m 1500 m 1000 m 2439 m Cooke 3 Shaft 3400 m 2500 m VCR Ezulwini # South Shaft SV1 / SV3 Subcrop South Deep Current Mine Phase 1 Upper Elsburg South Deep Phase 2 South Deep Site Visit, 8 February 2012 MK

  15. Slide 15: Mineral Resources

    Mineral Resources Measured and Indicated Tonnes (Mt) Grade (g/t) Gold (‘000 oz) Classification Dec 11 Dec 10 Jun 10 Dec 11 Dec 10 Jun 10 Dec 11 Dec 10 Jun 10 Underground Measured 51.4 41.5 40.5 7.3 7.7 7.4 12,015 10,331 9,684 Indicated (AI) 199.0 250.5 125.7 7.0 6.6 8.7 44,606 53,523 35,016 Total Ab

  16. Slide 16: Mineral Resources

    Mineral Resources Inferred Tonnes (Mt) Grade (g/t) Gold (‘000 oz) Classification Dec 11 Dec 10 Jun 10 Dec 11 Dec 10 Jun 10 Dec 11 Dec 10 Jun 10 Underground Inferred (AI) 10.6 17.2 78.0 8.8 6.3 5.8 3,012 3,460 14,566 Inferred(BI) 16.9 21.8 - 6.6 6.5 - 3,557 4,572 - Total 27.5 39.0 78.0 7.4 6.4 5.8 6,

  17. Slide 17: Mineral Reserves

    Mineral Reserves Managed Tonnes (Mt) Grade (g/t) Gold (‘000 oz) June June June Classification Dec 2011 Dec 2010 2010 Dec 2011 Dec 2010 2010 Dec 2011 Dec 2010 2010 CM – Proved 15.2 14.9 14.1 6.0 6.5 5.9 2,929 3,113 2,700 CM – Probable 6.6 1.8 3.7 4.2 5.5 4.2 885 308 505 NOW - Probable 63.5 56.2 42.5

  18. Slide 18: LoM Sequencing

    LoM Sequencing Development in Phase-1 SoW East Stoping in Phase-1 SoW West (Block-B) (Block-A) Corridor-4 starts in 2018 Reaches Corridor 3 & 4 by 2025 Current to 2025 South Deep Site Visit, 8 February 2012 MK Page 18

  19. Slide 19: LoM Sequencing

    LoM Sequencing Development in Phase-1 SoW East Stoping in Phase-1 SoW West (Block-B) (Block-A) Corridor-4 starts in 2018 Reaches Corridor 3 & 4 by 2025 Production from SoW reaches 200 Kt/m Current to 2035 South Deep Site Visit, 8 February 2012 MK Page 19

  20. Slide 20: LoM Sequencing

    LoM Sequencing Phase-1 NoW (corridors) depleted by 2054 Current Mine depleted by 2047 (95 Oline) Development in Phase-1 SoW East Stoping in Phase-1 SoW West (Block-B) (Block-A) Corridor-4 starts in 2018 Reaches Corridor 3 & 4 by 2025 Current to 2060 South Deep Site Visit, 8 February 2012 MK Page 20

  21. Slide 21: LoM Sequencing

    LoM Sequencing Development in Phase-1 SoW East Stoping in Phase-1 SoW West (Block-B) (Block-A) Corridor-4 starts in 2018 Reaches Corridor 3 & 4 by 2025 End of extended LOM (2080) Current to 2080 South Deep Site Visit, 8 February 2012 MK Page 21

  22. Slide 22: Mining Philosophy

    Mining Philosophy Mining a massive orebody at depth MB Depth Equivalent 1200m below De - stressed zone surface 30 - 40 Mpa 3000 - 4500 psi Front abutment Depth 2600m Destress stope stress 500 Mpa below surface 72 500 psi stress 75 Mpa 11 000 psi South Deep Site Visit, 8 February 2012 BW Page 22

  23. Slide 23: Mining Philosophy

    Mining Philosophy Mining a massive orebody at depth: Destress envelope South Deep Site Visit, 8 February 2012 BW Page 23

  24. Slide 24: Destress performance to date

    Destress performance to date Achieving the de-stress schedule is the keystone to executing the plan Destressing since C2010 50000 40000 30000 25704 20000 11088 9986 10000 17652 13548 14743 0 2010 2011 2012 Current Mine Future Mine 75% Improvement year on year South Deep Site Visit, 8 February 2012 K

  25. Slide 25: Backfill placement in 2012

    Backfill placement in 2012 Backfill (m³) 45000 40000 35000 30000 25000 20000 15000 10000 5000 0 Nov-12 Jul-12 Feb 12 Apr-12 Jan 12 Sep-12 Oct-12 C2010 C2011 C2012 Mar-12 Dec-12 May-12 Jun-12 Aug-12 Actual South Deep Site Visit, 8 February 2012 KM Page 25

  26. Slide 26: Workshop Progress

    Workshop Progress Construction and completion of workshops ASSEMBLY BAY Phase-1 Phase-3 Mining completion Oct ’12 Mining completion Aug ’13 Secondary support Mar ’13 Secondary support Feb ’14 Wetcrete Apr ’13 Wetcrete Aug ’14 RIG BAY 3 LHD BAY 3 OFFICE 3 93L Workshop DUMPTRUCK BAY RIG BAY 2 LHD BAY

  27. Slide 27: Mining Methods: De-stress Mining

    Mining Methods: De-stress Mining Main-access-drive 1 Stoping-drive mining Stoping-drive Recently filled stoping drive 2.2m 2 Advance stope-access-drive 3 Stoping-drive completion South Deep Site Visit, 8 February 2012 GP Page 27

  28. Slide 28: Mining Methods: Drift and Bench Mining

    Mining Methods: Drift and Bench Mining 1 Primary drift mining Drift access Bench access 2 Bench access 3 Bench mining Mining direction Mining direction South Deep Site Visit, 8 February 2012 GP Page 28

  29. Slide 29: Mining Methods: Longhole stoping

    Mining Methods: Longhole stoping Slot access 1 Longhole stope access 2 Slot development Slot raise 3 Slot development 4 Stoping 5 Stoping Completed slot South Deep Site Visit, 8 February 2012 GP Page 29

  30. Slide 30: Mining Methods: Combined

    Mining Methods: Combined 3D View of planned mining Drifts Long hole stoping Drives De-stress Stope Drives De-stress Stope Access Drives South Deep Site Visit, 8 February 2012 GP Page 30

  31. Slide 31: Existing Mine Infrastructure

    Existing Mine Infrastructure Colour Coding: Red Up Cast. Green Down Cast Twins Main Shaft Gold Rock Handling Capacity South Shaft Twins Ventilation Shaft Metallurgical Plant 1.4km SV 1 SV 2 33 Lvl 50 Level Plugs 48 Lvl SV 3 51 Level Pump Intermediate Pump 49 Lvl Station Stations 50 Lvl 53 Lvl 56 Lvl

  32. Slide 32: Tailings Storage Facility

    Tailings Storage Facility South Deep Site Visit, 8 February 2012 MM Page 32

  33. Slide 33: Backfill Infrastructure

    Backfill Infrastructure Full Plant Tailings – Backfill plant at South Shaft South Deep Site Visit, 8 February 2012 MM Page 33

  34. Slide 34: Metallurgical Plant Expansion

    Metallurgical Plant Expansion Milling, Crushing & Thickening South Deep Site Visit, 8 February 2012 MM Page 34

  35. Slide 35: New Mine Rock Handling Infrastructure by 2014

    New Mine Rock Handling Infrastructure by 2014 In-stope Truck Tips 95-1W 95-2W 95-3W The Silos are required for life of mine, where traditional ore passes would fail with short life spans between costly rehabilitation. The additional costs for the Silos was approved in the NMD C.O.S. February 2012 Fe

  36. Slide 36: Annual capital spend

    Annual capital spend Actual to-date and Forecast to project scope completion 3.000 2.576 2.500 1.982 2.000 1.884 1.672 1.599 1.500 R ‘Bn 0.540 Sustaining Capital 1.578 0.957 0.540 1.000 0.500 0.000 F2010 C2010 - H2 C2011 C2012 C2013 C2014 C2015 C2016 Capex Actual Capex Forecast South Deep Site Visit

  37. Slide 37: Highlights of 2012

    Highlights of 2012 Project status is at 42 months out of 60 months program • Ventilation Shaft infrastructure hoisted the first skip on the 16th October 2012 • Temporary Ore Pass system was commissioned at the end of September 2012 • Metallurgical Plant expansion project was completed as planned in

  38. Slide 38: Production indicators

    Production indicators Steady state R/ton Milled 800 Tons Milled (‘000) 3,960 Working cost R/kg 150,000 Ounces Produced (‘000) 700 Average Cash Cost US$700/ounce Average NCE US$900/ounce South Deep Site Visit, 8 February 2012 KM Page 38