  1. Slide 1: AGM 2023

    AGM 2023 For personal use only Lachlan Wallace CEO & Managing Director 28 April 2023 1

  2. Slide 2: Corporate Snapshot

    CORPORATE SNAPSHOT For personal use only Company Overview Investment Highlights • ASX listed (‘HGO’) Australian resources company that owns and ✓ Advanced, fully permitted and funded project with key operates the Kanmantoo Copper Gold Mine in South Australia infrastructure in place for a <$30M capex

  3. Slide 3: Last 12 Months in Review

    LAST 12 MONTHS IN REVIEW For personal use only ■ UPDATED MINERAL RESOURCE ESTIMATE ■ ADDED 1.3Mt TO RESOURCE BASE – 21% INCREASE ■ 5.2Mt NOW CLASSIFIED AS MEASURED OR INDICATED (UP FROM 3.7Mt) ■ UPDATED ECONOMIC ASSESSMENT ■ EXTENDED MINE LIFE ■ >$200M FREE CASH GENERATION (POST TAX), CAPEX $25M, NP

  4. Slide 4: Kanmantoo Underground

    KANMANTOO UNDERGROUND For personal use only 4

  5. Slide 5: Fully Permitted in Tier Jurisdiction

    FULLY PERMITTED IN TIER 1 JURISDICTION For personal use only ✓ Tier 1 location ✓ Ready workforce - No FIFO ✓ Close to Port Adelaide 5

  6. Slide 6: Fully Permitted in Tier Jurisdiction

    FULLY PERMITTED IN TIER 1 JURISDICTION For personal use only ✓ Surplus annual native seed production ✓ Linking rehab to regional vegetation to create greenbelt ✓ 122ha native vegetation completed 6

  7. Slide 7: Fully Permitted in Tier Jurisdiction

    FULLY PERMITTED IN TIER 1 JURISDICTION For personal use only ✓ Genuine win-win community engagement ✓ Community and government support ✓ ESG reporting to GRI, UNSDG, ICMM 7 Kanmantoo Callington Community Consultative Committee (K4C) receiving award from Premier Steven Marshall for Community Excellen

  8. Slide 8: Plant and Infrastructure Already in Place

    PLANT AND INFRASTRUCTURE ALREADY IN PLACE For personal use only ✓ 3.6Mtpa processing plant ✓ All critical spares ✓ Maintained for quick, low-cost restart 8

  9. Slide 9: Tailings Storage Facility Already in Place

    TAILINGS STORAGE FACILITY ALREADY IN PLACE For personal use only ✓ Tailings storage with approved capacity of >7Mt, well above current mine plan of 4.5Mt ✓ Further low-cost capacity available to accommodate growing mine plan ✓ All services connected (power, water). Long term power contract provides

  10. Slide 10: Underground Development Commenced

    UNDERGROUND DEVELOPMENT COMMENCED For personal use only Nugent Portal Development decline and Ventilation drive underground drill platform 10

  11. Slide 11: Underground Development Commenced

    UNDERGROUND DEVELOPMENT COMMENCED For personal use only Underground decline commenced 11

  12. Slide 12: Underground Development Commenced

    UNDERGROUND DEVELOPMENT COMMENCED For personal use only ✓ Decline and ventilation drive commenced ✓ Infrastructure at portal in place ✓ First copper intersected only 13m from portal! 12

  13. Slide 13: Excellent Economics – Stage Only

    EXCELLENT ECONOMICS – STAGE 1 ONLY For personal use only ✓ Low capital - existing infrastructure and close proximity of lodes ✓ Low AISC - excellent geotechnical conditions and multiple headings enable efficient mining ✓ Nugent 2022 drilling increased the MRE increased by 6kt Cu metal which is not i

  14. Slide 14: Fully Funded

    FULLY FUNDED For personal use only ■ DEBT FREE ■ NO DEBT REPAYMENTS PROVIDES OPERATIONAL FLEXIBILITY ■ REDUCES CONVENANTS – BRINGING FORWARD DIVIDENDS ■ FUNDING PROVIDES DEVELOPMENT CONTINGENCY & FACILITATES GROWTH ■ FULLY FUNDED ■ CASH $18M ■ AGM $8M ■ FIRB $12M ■ HEDGING ■ 16,000 t ■ ~50% OF FIRST

  15. Slide 15: Significant Leverage to the Copper Price

    SIGNIFICANT LEVERAGE TO THE COPPER PRICE For personal use only ✓ Stopes terminate in lower grade halo around high grade mineralised core. ✓ As price increases, the cut-off grade reduces, enabling additional copper mineralization to be mined for low incremental cost by simply widening stope width. ✓

  16. Slide 16: Development on Track

    DEVELOPMENT ON TRACK For personal use only 16

  17. Slide 17: Early Works Underway

    EARLY WORKS UNDERWAY For personal use only Installing drape mesh over pit walls 17

  18. Slide 18: Early Works Underway

    EARLY WORKS UNDERWAY Access road upgraded For personal use only Unloading dewatering pipe 18

  19. Slide 19: Early Works Underway

    EARLY WORKS UNDERWAY For personal use only 100 person mining change house & laundry being dismantled in preparation for transport to Kanmantoo 19

  20. Slide 20: Early Works Underway

    EARLY WORKS UNDERWAY For personal use only Primary ventilation substation Ventilation fans Fitting out explosives vehicles 20

  21. Slide 21: Mill Refurbishment

    MILL REFURBISHMENT For personal use only Hydro scaling 21

  22. Slide 22: Exploration Growth

    For personal use only EXPLORATION GROWTH 22

  23. Slide 23: Mine Expansion Drilling Underway

    MINE EXPANSION DRILLING UNDERWAY For personal use only 23

  24. Slide 24: >100% Exploration Strike Rate = Resource Growth

    > 100% EXPLORATION STRIKE RATE = RESOURCE GROWTH For personal use only ✓ 143 Cu-Au intersections of economic grade and width from only 122 holes: over 100%! ✓ Mine plan does not include 6kt added to Nugent MRE in 2022 and recent drilling results in Spitfire, North Hub and South Hub ✓ Every drill pro

  25. Slide 25: Exploration Target

    EXPLORATION TARGET For personal use only Exploration Target – on-lease 10 – 20 Mt 0.9 – 1.3% Cu 0.1 – 0.3 g/t Au The Exploration Target is conceptual in nature as there has been insufficient exploration to define a Mineral Resource. It is uncertain if further exploration will result in the determina

  26. Slide 26: Kanmantoo Deeps

    KANMANTOO DEEPS For personal use only Main Kavanagh Zone AMT/MT surveys identified 1.2km zone of high conductivity Coincident with: ✓ Magnetic anomaly ✓ Strong gravity anomaly Zone of interest starts at 1300m below surface Kanmantoo Deeps 26

  27. Slide 27: Utilising Mill Capacity to Grow Annual Production

    UTILISING MILL CAPACITY TO GROW ANNUAL PRODUCTION For personal use only North Hub South Hub Kavanagh Nugent ✓ Conceptual designs indicate North Hub and South Hub can be added to the plan for low incremental cost (pending successful confirmatory drilling) ✓ Mill only 40% utilised and plenty of TSF ca

  28. Slide 28: News Flow

    Strong news flow as we NEWS FLOW transition to producer For personal use only Indicative timetable(1) ✓ Q1-23 UPDATED MINE PLAN ✓ Q1-23 COMMENCE EARLY WORKS & MINE EXTENSION DRILLING ■ Q2-23 CONCLUDE FUNDING (AGM & FIRB) ■ Q2-23 FID & COMMENCE UNDERGROUND DEVELOPMENT ■ Q3-23 CONTINUED MINE LIFE EXPA

  29. Slide 29: Summary

    SUMMARY For personal use only ■ FULLY PERMITTED, LOW COST, LOW RISK, NEAR TERM COPPER PRODUCTION OPPORTUNITY ■ STAGE 1 ALREADY HAS STRONG ECONOMICS WITH SHORT PAYBACK PERIOD ■ HIGHLY LEVERAGED TO COPPER PRICE INCREASES AND RESOURCE GROWTH ■ MULTIPLE ON-LEASE INFILL DRILLING TARGETS TO FURTHER INCREA

  30. Slide 30: Questions?

    For personal use only QUESTIONS? 30

  31. Slide 31: Appendix

    For personal use only Appendix 31

  32. Slide 32: Important Notice & Disclaimer

    IMPORTANT NOTICE & DISCLAIMER Summary information This presentation contains summary information about Hillgrove Resources Limited (Hillgrove or the Company) and its activities as at 27 February 2023. The information in this presentation is of a general nature and does not purport to be complete nor

  33. Slide 33: Important Notice & Disclaimer

    IMPORTANT NOTICE & DISCLAIMER Future performance continued The forward looking statements are subject to risks, stakeholder engagement, uncertainties and assumptions which could cause actual results, timing, or events to differ materially from the expectations described in such forward-looking state

  34. Slide 34: Important Notice & Disclaimer

    IMPORTANT NOTICE & DISCLAIMER Mineral Resources and Ore Reserves Estimates continued There is a lower level of geological and grade continuity confidence associated with Inferred Resources and there is no certainty that further exploration work will result in the conversion of Inferred Resource esti

  35. Slide 35: Important Notice & Disclaimer

    IMPORTANT NOTICE & DISCLAIMER Competent Persons Statement The information in this report that relates to the Exploration and Drilling Results on the Kanmantoo project were initially reported by the Company to ASX on 26 May 2016, 10 October 2019, 3 September 2020, 3 May 2021, 6 May 2021, 24 June 2021

  36. Slide 36: Investment Risks

    INVESTMENT RISKS Potential investors should be aware that there are risks associated with investing in Hillgrove. Certain risks are beyond the control of Hillgrove and its Directors and Management and may have a material impact on Hillgrove's future operating and financial performance, and/or the fi

  37. Slide 37: Investment Risks

    INVESTMENT RISKS • The future success of the Company depends, to a significant extent, upon the continued services of the members of the management Key person team of the Company. There can be no assurance that the Company will be able to retain or hire all personnel necessary for the dependence dev

  38. Slide 38: References

    REFERENCES All exploration drill results, exploration information and Mineral Resource Estimates have previously been reported to the ASX by Competent Person at the time. The results reported herein are reported in the form and context of the original ASX releases. Refer http://www.hillgroveresource