Slide 1: Barossa FPSO FEED Competition Project
Barossa FPSO FEED Competition Project Australian Industry Participation
Slide 2: TechnipFMC Snapshot
TechnipFMC Snapshot Barossa FPSO FEED Project| 2
Slide 3: Business Overview
Business Overview » Subsea > Onshore/ » Surface Offshore Technologies Optimizing subse: Delivering unrivaled Combining field-proven fields from concept technology and project equipment, ser & Delivered 142 modules $im 6 EPCI™ awards for three LNG trains, Yar esp || inder 12 months 600,000-tonnes 1 P
Slide 4: TechnipFMC Australia
TechnipFMC Australia Office Facilities & Services - Perth Office Facilities & Services - Henderson • Projects and Engineering office • Henderson Facility headcount ~ 90 headcount ~ 500 (700 peak) • Delivering projects in Australia since 2010 • Genesis headcount ~ 35 • Subsea Ops and Project Manageme
Slide 5: Projects
Projects Barossa FPSO FEED Project| 5
Slide 6: Flagship Australian Projects – Locally Delivered
Flagship Australian Projects – Locally Delivered ▪ Kupe – longest HDD Wheatstone – FEED and (world record) Detailed Design ▪Wheatstone Subsea Installation EPCI Macedon – Gas Plant EPCM Gorgon Upstream Barossa FPSO FEED Project| 6
Slide 7: Flagship Australian Projects – Locally Supported
Flagship Australian Projects – Locally Supported INPEX Ichthys Flexible riser supply Prelude FLNG EPC Detailed design FPSO topsides Barossa FPSO FEED Project| 7
Slide 8: Woodside Greater Enfield
Woodside Greater Enfield ACTIVE PROJECT Subsea EPCI Scope Summary Contract covers project management, design, engineering, procurement, installation and pre-commissioning (EPCI) of: ▪ 80 km of carbon steel production flowline, carbon steel water injection flowline, flexible risers and flowlines ▪ 39
Slide 9: Major Subsea Supply Projects
Major Subsea Supply Projects Legacy FMC Chevron Wheatstone Shell Prelude ConocoPhillips Bayu-Undan Woodside Greater Western Flank 1 & 2 Woodside Persephone Barossa FPSO FEED Project| 9
Slide 10: SHI Snapshot
SHI Snapshot Barossa FPSO FEED Project| 10
Slide 11: Business Update
Business Update Business area SHI at a Glance (as of Dec. 2017) Establishment 1974 FLNG FPSO FSO Asset 13.2 Billion USD Offshore Revenue 7.5 Billion USD Employees 10,662 Platform FPU FPU TLP Order Backlog : 18.5 B$ (as of July. 2018) USD billion Tanker Artic Shuttle Container ($) 52% Amt. 9.7 10 47%
Slide 12: ShinHanne Factory
Production Site 4.0 million m2 Dock Length x width Major Products Quay Wall Length 7.9 km 1 Dock 283 x 46 Tanker, LNGC, Drillship Quay Wall Berthing Capacity 24 vessels 2 Dock 390 x 65 LNGC, Drillship Shipbuilding Capacity 70 vessels / year 3 Dock 640 x 98 Container ship, FLNG, VLCC Offshore Capacit
Slide 13: Australia Experience
Australia Experience TIMOR-LESTE BHP Griffin FPSO (1993) Apache Stag CPP (1998) Woodside Endeavour FPSO (1998) Phillips Liberdade LPG FPSO (1998) Woodside Nganhurra FPSO (2003) Modec Stybarrow FPSO (2007) (Delivery year) 8 INPEX Ichthys CPF (2017) Shell Prelude FLNG (2017) 2017 2017 World’s Biggest
Slide 14: Barossa Project Overview
Barossa Project Overview Barossa FPSO FEED Project| 14
Slide 15: Project Overview
Project Overview ▪ Consortium between TechnipFMC & SHI ▪ Hull at SHI, Pangyo & Geoje and Topsides engineering at TechnipFMC, Kuala Lumpur ▪ Production capacities: ▪ Export gas rate fixed by DLNG (3.7 MTPA backfill) ▪ 800 MMscfd raw gas capacity ▪ ~8,000 bpd condensate / 700,000 bbl storage ▪ ~20,000
Slide 16: FEED Execution Plan
FEED Execution Plan ▪ Main Subcontracts: Turret and Mooring Systems (TMS) ▪ Overall engineering split TechnipFMC / SHI: Barossa FPSO FEED Project| 16
Slide 17: Topsides Layout
Topsides Layout Non-Hazardous Area Hazardous Area Module Module Dry Wt (MT) Topsides Dry Weight 32,513 MT Electrical Building/Shop 2,652 Topsides Operating Weight 34,298 MT P4 - HP Separation 2,800 Hull Design Basis 41,153 MT P6 - CO2 Removal 2,843 L x B x D (m) S6 - Gas Dehyd/Dew Pointing 5,269 304
Slide 18: Turret and Mooring System
Turret and Mooring System Typical Internal Turret Barossa FPSO FEED Project| 18
Slide 19: Topsides Major Mechanical Packages
Major Mechanical Packages • MEG regeneration • Demin Water Generation Skid • Turbo-Expander Package • Sales Gas Metering Skid • Tertiary Water Treatment Package • Export Gas Cooler • CO2 Removal Package • Subsea Chemical Injection Skid • Power Generation • Pedestal Cranes TOPSIDES LLIs • Export Comp
Slide 20: List of Systems in Topsides
List of Systems in Topsides Nitrogen System Export Gas Compression and Metering Sea Water and Cooling Medium System MEG recovery Hypochlorite Generation System Condensate Treating Heating Medium System Condensate Stabilization Chemical Injection System Flash Gas Compression Demineralized Water Syste
Slide 21: List of Systems in Hull
List of Systems in Hull Diesel oil system Remote sounding system Lubricating oil system Air vent & sounding system Cooling water system Condensate system Compressed air system Slop water system Potable & fresh water system Inert gas system Grey and black water system Ballast system Bilge system Hull
Slide 22: Offshore Packages
Offshore Packages • Offshore Installation Package / Supply of Marine Spreads • FPSO Towing • FPSO Hook-Up • Offshore Commissioning • Onshore Logistic Support • Waste Removal • Provision of Accommodation Support Vessel Barossa FPSO FEED Project| 22
Slide 23: Australian Industry Participation
Australian Industry Participation TechnipFMC actively supports AIP and is committed to working constructively with Australia industry to ensure “Full, Fair and Reasonable” opportunity is provided to participate in this project in accordance to TFMC’s AIP Plan via the following processes: • Publicati
Slide 24: Key Contacts
Key Contacts TechnipFMC • Alex Chew Procurement Manager , Global Sourcing and Procurement TechnipFMC Oceana, Perth P +61 894 1286 28 | M +61 484 641 751 E-mail: alex.chew@technipfmc.com Samsung Heavy Industries • Alex Bae Manager, Offshore Sales and Marketing Team (Part 3) Samsung Heavy Industries C
Slide 25: Questions?
Questions? Barossa FPSO FEED Project| 25