Slide 1: MMC Energy Inc.
MMC Energy Inc.

Slide 2: Forward-looking statements
This presentation material contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. The opinions, forecasts, projections or other statements, other than statements of historica

Slide 3: MMC Strategy
MMC Strategy Our core business strategy is to create long- term value by focusing on five principles: Targeting power constrained regions Acquiring electricity generating and infrastructure related assets Developing or restructuring acquired assets to maximize revenues Managing risk to optimize prof

Slide 4: MMC Recent Initiatives
MMC Recent Initiatives = MMC has acquired three peaking electricity generating assets with a total of 110MW installed capacity * Two 44MW name plate capacity gas peaking plants in San Diego — Chula Vista and Escondido * One 22MW name place capacity gas peaking plant near Bakersfield — Mid Sun = Rais

Slide 5: MMC Targets Transmission Constrained Regions
MMC Targets Transmission Constrained Regions x MISO. 213 Plants = Focus on regions where: + High energy demand and tight supply * Transmission congestion + Peaker services can be sold at a premium + Natural gas price is the primary fuel

Slide 6: Many Areas of Western U.S. are Transmission Constrained
Many Areas of Western U.S. are Transmission Constrained = Within the California region, there are load pockets where transmission constraints affect local reliability « San Diego, Los Angeles, and San Francisco are all heavily dependent on imported electricity to meet peak demand ¢ Arizona, Southern

Slide 7: MMC's Plants Reside in Critical Congestion Areas
MMC’s Plants Reside in Critical Congestion Areas which are Dependent on Imported Electricity ‘ Seattle Critical Congestion Area Direction of increased flows Sp eededioeacecongesten rite Direction needed In Congestion Area of Concern by Sacramento San Francisco Y@ San Jose Riverside Los Angeles Phoen

Slide 8: Tight Reserve Margins — California and Southwest U.S.
Tight Reserve Margins — California and Southwest U.S. Key Statistics: 2006 California Southwest* Summer Peak Demand 50,270 42,227 Summer reserves 6,077 6,040 Summer Reserve Margins 12% 14% Peak day reserve margin*™” <5%( on Jul 24) 9% ( July 19)

Slide 9: MMC Focus on California Market
MMC Focus on California Market Southern California is one of the most congested transmission corridors in the US Very tight reserve margins during peak summer season, a good example is July of 2006, reserves were almost non existent (<5%) Generally takes 5-7 years to permit and build new transmissio

Slide 10: MMC Revenue Sources
MMC Revenue Sources Revenue earned for “plant availability,” with no-call on energy cCCivaa - Utilities are required to meet resource adequacy requirements + Reserve margins (excess of supply over peak demand) of 15- 20% deemed prudent by ISOs ‘ian Revenues bid in a daily market for providing: Nitsa

Slide 11: MMC Maintains a Scalable Commercial Structure
MMC Maintains a Scalable Commercial Structure MiMic Asset Management. Finance-Operations MMC Energy North America (Asset Company) iment Grade | Counterparties nagement services

Slide 12: aS) g ) ao Da ro £ i i 1S) = =
aS) g ) ao Da ro £ i 4 i 1S) = =

Slide 13: MMC Chula Vista and Escondido Acquisitions
MMC Chula Vista and Escondido Acquisitions = Exclusively negotiated and purchased two plants on Jan 9, 2006 in premium San Diego, CA region + All in purchase price of $65/kW (1.3x EBITDA) * Greenfield replacement cost > $1000/kW = On-line by June 2006 — 5 months to manage repairs and re-commissionin

Slide 14: MMC Mid-Sun Acquisition
MMC Mid-Sun Acquisition = Negotiated purchase price of ~$250/kW (5x EBITDA) * Closed on Nov 17, 2006; successfully re- commissioned the plant in January, 2007 with a COD of 1/26/07 = Located in Kern County California (Bakersfield) — Adjacent to oil production fields = Simple, remote start operations

Slide 15: MMC San Diego Plant Re-powering Initiatives
MMC San Diego Plant Re-powering Initiatives Current Repower and Contract MMIC zw oomw 46. Total to MMC: 110MW Total to MMC: 161.5MW + New Acquisitions TBD = Commenced expansion of Chula Vista and MMC will repower Chula Vista and Escondido with new Escondido facilities GE LM-6000 turbines 7 . Seer MM

Slide 16: MMC Proxy Contest
MMC Proxy Contest

Slide 17: MMC Board
MMC Board Name Title Experience Mike Hamilton Chairman, CEO Director MXenergy, Senior Managing Director, FT| Consulting; Partner, PriceWaterhouse Coopers Denis Gagnon Director, CFO VP, Deutsche Bank; Associate, Gefinor; Manager, Kaizen Breakthrough Partnership, L.P. Phillip Harris Director Senior Fe

Slide 18: MMC Executive Management
MMC Executive Management Name Title Experience Mike Hamilton Chairman, CEO Director MXenergy, Senior Managing Director, FT| Consulting; Partner, PriceWaterhouse Coopers Denis Gagnon Director, CFO VP, Deutsche Bank; Associate, Gefinor; Manager, Kaizen Breakthrough Partnership, L.P. Harry Scarborough

Slide 19: Current Management's Accomplishments
Current Management’s Accomplishments Our new management has remained focused on implementing the Company’s existing strategy, and has made significant progress. January 2008 - Escondido City Council approved the Company’s application for a conditional use permit to construct for our Escondido Upgrad

Slide 20: Current Management's Accomplishments
Current Management’s Accomplishments = February 2008 - Filed a complaint at the Federal Energy Regulatory Commission to permit it to participate in the spinning reserve market = March 2008 — Recruited to the Board Phil Harris, the immediate past president and CEO of the PJM Interconnection, the four

Slide 21: Chronology of EHL's contest
Chronology of EHL’s contest December 9, 2007 — Mr. Miller was replaced as CEO December 18, 2007 — Mr. Miller resigned as an employee of MMC February 20 2008 — Mr. Miller resigned from the MMC board and received $1.1 million in severance March 4, 2008 — EHL was formed with one of two objectives being

Slide 22: EHL & Miller
EHL & Miller = EHL “Pipeline” « EHL promotes the assignment of it’s interests in projects to MMC upon replacing the entire Board and management team. All of the purported projects are “speculative and without any financing commitments” according to EHL’s proxy = Track Record + In their own prelimina

Slide 23: EHL Proxy Fight
EHL Proxy Fight = EHL has indicated that it intends to assign all of its interests in projects to MMC without cost to MMC = Currently, EHL has only one signed letter of intent. Most of EHL’s projects are categorized by EHL as “Discussion in Process” = EHL admits that “These projects are speculative

Slide 24: Mr. Miller's Track Record at MMC
Mr. Miller’s Track Record at MMC Mr. Miller becomes CEO Mr. Miller replaced as CEO May-06 July-06 4 September-06 4 November-06 4 January-07 4 March-07 + May-07 4 July-07 + September-07 4 November-07 4 January-08 | March-08 + During Mr. Miller's tenure, MMC’s stock price collapsed by nearly 80% (adju

Slide 25: Governance Concerns with EHL/Miller Slate
Governance Concerns with EHL/Miller Slate Miller was former CEO (as of December 2007) and Board Member (as of February 2008) of MMC, whose performance and governance he now criticizes Miller accepted $1.1 million in severance and agreed to abide by terms of his Employment Agreement which contained c

Slide 26: Appendix
Appendix

Slide 27: Important Information
Important Information: In connection with the solicitation of proxies, the Company filed with the Securities and Exchange Commission (the ``SEC'') and mailed to stockholders a definitive proxy statement dated April 11, 2008. The Proxy Statement contains important information about the Company and th