Abasca Resources Inc. · TSXV:ABA

Abasca Resources — Investor Presentation (November 2025)

22 slides from Abasca Resources's investor presentation, November 2025

  1. Slide 1: Advancement of The Loki Flake Graphite Deposit

    TSXV: ABA Advancement of The Loki Flake Graphite Deposit Key Lake South Project November 2025

  2. Slide 2: Forward Looking Statement

    Forward Looking Statement This presentation is for information purposes only and does not constitute an offer to sell or solicitation to buy any securities. This presentation may contain certain forward-looking information (“forward-looking information”) within the meaning of applicable Canadian sec

  3. Slide 3: Leadership – Management Team

    Leadership – Management Team Abasca Resources Inc. (Abasca) aims to provide shareholder value through responsible exploration, Our Mission discovery, and development of environmentally and economically viable critical mineral deposits. Dawn Zhou | Founder, Director, President & CEO | M.Sc. Geology,

  4. Slide 4: Leadership – Board of Directors

    Leadership – Board of Directors Dave Billard | Independent Director, Chairman of the Board | B.Sc. Geology, P.Geo President and owner of Cypress Geoservices Ltd., a geological consulting firm based in Saskatoon, since 1999. Dave possesses over 35 years of mineral exploration and development experien

  5. Slide 5: Regional Context

    Regional Context Mudjatik ▪ Along the boundary of the Wollaston and Mudjatik Domains Wollaston Athabasca Basin ▪ Along regional deposit-hosting structural zone ▪ Extensive graphitic corridors Key Lake South TSXV: ABA Information, data, and images embodied in this presentation are based on informatio

  6. Slide 6: Key Lake South Project

    Key Lake South Project Existing Infrastructure Loki Flake ▪ Highway 914 passes through project Graphite Deposit ▪ 15 km south of Key Lake Facilities with power and communications ▪ Accessible water sources Project highlights ▪ 23,977 Ha ▪ > 50 km conductors ▪ Favorable geological setting for hydroth

  7. Slide 7: Graphite Uses – more than just pencils

    Graphite Uses – more than just pencils Batteries: ▪ Global demand for graphite is surging, driven by the clean energy transition ▪ Electric vehicles: Graphite is the dominant anode material in lithium-ion batteries, making it essential for EV growth ▪ Energy storage: Key to large-scale systems that

  8. Slide 8: Graphite Uses – Batteries Driving Demand

    Graphite Uses – Batteries Driving Demand Application Amount Electric Vehicle 50 – 100 kg Home Solar Power Storage 10 – 30 kg E-Bike 1 – 2 kg Power Tool 20 – 30 g Laptop 10 – 20 g Household Electronics 5 – 10 g Smartphone ~2g 2H Pencil 0.5 – 1 g Source: ECGA, BatteryTips, Bosch. TSXV: ABA Information

  9. Slide 9: Increasing Graphite Demand

    Increasing Graphite Demand Material Composition of a Li-ion Battery, by weight 45 % 16% Graphite 36% Other (Electrolytes, binders, plastics, separators) 7% Lithium 7% Cobalt 4% Nickel 10 % 5% Manganese 10% Copper 15% Aluminum Sources: USGS Mineral Commodity Summaries 2023. IEA Critical Minerals Mark

  10. Slide 10: Graphite Production

    Graphite Production North American Production Active graphite mines: 1 Anode ▪ Lac des Iles, QC (Northern Graphite) manufacturing ▪ 4 kt – 16.2 kt per year production (2019 – 2023) ▪ Previous year accounts for ~0.3% global natural graphite production ▪ Current remaining resource: 213,000 t at 6.4 %

  11. Slide 11: Loki Flake Graphite Deposit: A Brief History

    Loki Flake Graphite Deposit: A Brief History Milestones up to 2024 ▪ 2016: Shallow 2 km trend discovered during uranium exploration ▪ 2023: Samples reanalysed for graphite Loki Flake Graphite Deposit ▪ 2024: First delineation program and resample 2016 core 22.2 % Cg KS-CC16-12: Box 4 – 6 | 86.6 – 10

  12. Slide 12: 2024 Review

    Loki Flake Graphite Deposit: 2024 Review Objective: Define depth extent and continuity to support inferred resource ▪ 5,500 m drilled over 20 holes TSXV: ABA Information, data, and images embodied in this presentation are based on information currently available to Abasca Resources Inc. and any forw

  13. Slide 13: Maiden Resource

    Loki Flake Graphite Deposit: Maiden Resource Contained Cut-off Grade Tonnage Grade Category Graphite (% Cg) (Mt) (% Cg) (Mt) Inferred 2.78 11.31 7.65 0.86 1. The reporting standard for the Mineral Resource Estimate uses the terminology, definitions and guidelines given in the Canadian Institute of M

  14. Slide 14: 2025 Milestones

    Loki Flake Graphite Deposit: 2025 Milestones ▪ Initial pit-constrained inferred MRE of 11.31 Mt at 7.65 % Cg ▪ Winter drill program ▪ Extension of the Loki Deposit ▪ Test parallel target: Thor Zone ▪ Summer drill program ▪ In-fill at indicated and measured spacing ▪ Geotechnical and Hydrogeological

  15. Slide 15: 2025 Winter Program

    Loki Flake Graphite Deposit: 2025 Winter Program Winter 2025 Highlights ▪ 5,925 m over 23 holes ▪ Expanded strike extent ▪ NW: 300 m ▪ SE: 400 m Assay Highlights ▪ KLS-25-058: 30 m @10.64 % Cg ▪ KLS-25-060: 34 m @ 9.02 % Cg ▪ KLS-25-066: 26 m @ 8.53 % Cg Impact ▪ Doubled strike-extent of resource TS

  16. Slide 16: 2025 Summer Activities

    Loki Flake Graphite Deposit: 2025 Summer Activities Summer 2025 Highlights ▪ 6,690 m over 35 holes ▪ Focused on in-fill drilling to support updated MRE ▪ Geotechnical and water monitoring TSXV: ABA Information, data, and images embodied in this presentation are based on information currently availab

  17. Slide 17: Thor Zone

    Loki Flake Graphite Deposit: Thor Zone Thor Zone Highlights – 2024 Discovery ▪ 1,341 m over 3 holes ▪ KLS-24-042: 10 m @ 6.42 % Cg ▪ KLS-24-046: 27 m @ 8.91 % Cg ▪ KLS-25-072: 122 m of graphite mineralization over 3 zones 042 072 10 m @ 6.42 % Cg 046 TSXV: ABA Information, data, and images embodied

  18. Slide 18: 2026 Work Plan

    Loki Flake Graphite Deposit: 2026 Work Plan† ▪ Complete preliminary open-pit mining design ▪ Conduct winter drilling program of ~5,000 metres ▪ Confirm the expansion of Loki Deposit toward the SE ▪ Evaluate the mineralization and extents of the Thor Zone ▪ Additional geotechnical and hydrogeological

  19. Slide 19: 2026 Preliminary Budget and Financing Schedule

    2026 Preliminary Budget and Financing Schedule† 2025 Summer drilling analytical cost $500,000 2026 Winter resource and exploration drilling: ~5,000 metres (all in) $2,500,000 2026 Geotechnical drilling and hydrogeological studies $500,000 Update NI 43-101 Technical Report and Mineral Resource Estima

  20. Slide 20: Roadmap to Production

    Loki Flake Graphite Deposit: Roadmap to Production† 2027 Continue PFS and EIA Carry out bulk sampling Construct processing pilot plant Enter Feasibility Study (FS) 2028 Complete FS and EIA Retain mine engineering consulting Procurement of equipment 2029 Construction Commence operations 2030 Ramp-up

  21. Slide 21: Capital Structure

    Capital Structure † Shares Issued 119,744,512 Options 6,550,000 Warrants 25,941,074 Fully Diluted 152,208,586 Cash $1,700,000 Ownership Management and Directors 11 % Associated Corporations 64 % Retail 25 % † As of October 31, 2025 TSXV: ABA Information, data, and images embodied in this presentatio

  22. Slide 22: Contact

    #208Contact – 311 4th Avenue N Saskatoon, SK S7K 2L8 TSXV: ABA info@abasca.ca

Abasca Resources — Investor Presentation (November 2025) on 6ix