  1. Slide 1: Powering Europe's Future with Clean Reliable Energy

    CORPORATE PRESENTATION H2 2025 POWERING EUROPE’S FUTURE WITH CLEAN RELIABLE ENERGY

  2. Slide 2: Disclaimer

    Disclaimer The information in this information memorandum has not been independently verified. No representation, warranty or undertaking, express or implied, is or will be made by Cindrigo or its directors, officers, employees, subsidiaries, affiliates, advisors and representatives (“Affiliates”) o

  3. Slide 3: An active Clean Energy Developer, Owner and Operator

    An active Clean Energy Developer, Owner and Operator High growing demand for more Energy Globally Every fossil fuel power plant that closes is a baseload plant that needs to be replaced Retiring fossil fuel plants removes critical baseload capacity that must be replaced CINDRIGO CORPORATE PRESENTATI

  4. Slide 4: Urgent, Global Need for Baseload Energy

    Urgent, Global Need for Baseload Energy ‘Baseload energy’ is the minimum amount of electricity needed to meet continuous demand on an electrical grid = 1,000 GW 3,000 GW 4,000 GW new baseload replacement clean of new power power baseload power generation is required Fossil fuel power plants currentl

  5. Slide 5: Clean Baseload Power: Capacity Factor

    Clean Baseload Power: Capacity Factor Technical & economic factors clearly validate the focus on clean baseload power Among low-carbon energy sources, only geothermal and WtE reliably deliver baseload capacity on par with nuclear, thanks to high-capacity factors and limited reliance on energy storag

  6. Slide 6: Well Positioned | Ready to Deliver

    Well Positioned | Ready to Deliver A Solid Platform 110MW • Meeting Growing Market Demand through Waste to Energy and Geothermal CHP Plant Constructed • Experienced Board and management team with a strong track record, deep engineering expertise, world-class partners, and proven technology • Finland

  7. Slide 7: Board of Directors

    Board of Directors Renowned leadership with extensive experience in Jörgen Andersson Lars Guldstrand Dag Andresen Mustaq A Patel Johan Glennmo Alan Boyd Jack Clipsham CHAIRMAN CEO & DIRECTOR CFO & DIRECTOR CCO & DIRECTOR NON-EXEC NON-EXEC INDEP NON-EXEC INDEP energy DIRECTOR DIRECTOR DIRECTOR Strate

  8. Slide 8: Geothermal Technical Team

    Geothermal Technical Team Ishtiaq Ahmed HEAD OF REGION CENTRAL EUROPE – SUB SURFACE FOCUS Expert Ishtiaq oversees all operational activities for Cindrigo in Central Europe technical Ishtiaq, a seasoned oil and gas executive, has seamlessly transitioned to geothermal energy, leveraging over 20 years

  9. Slide 9: Finland – Waste to Energy

    Finland – Waste to Energy 110 MW Asset Overview Combined Heat and Power Plant • 110 MW Combined Heat & Power (CHP) WtE Plant (90% ownership) 25 MW of electricity 85 MW of steam • Plant Valued at +€105M (depreciated asset); • Acquired 2024 for €18M on a 50-year lease Electricity to be delivered to th

  10. Slide 10: Geothermal Development Opportunity

    Geothermal Development Opportunity A strong pipeline of expansion targets in Europe Specific European geothermal resources identified for a first round of projects ▪ Rhine River Basin - Netherlands Germany ▪ Upper Rhine Valley Graben* Molasses Basin – Germany ▪ Upper Rhine Valley Rift – France ▪ Pan

  11. Slide 11: Germany – Strong Government Support

    Germany – Strong Government Support Flagship Geothermal Development Upper Rhine Valley (3 licenses, 125 km², 85% owned) • Mature geothermal zone • with over 400 oil & gas wells and 24 deep geothermal wells • Resource Potential +400MW Development Plan c. 300MW Germany National goal: - 10 TWh geotherm

  12. Slide 12: Staged Roll-out

    Staged Roll-out Development Plan per license 2027 Weinheim Project PHASE 1 – Phase 1 Heat c 30 MW CAPEX €50 million - Initial phase: 25MW Development Plan 90-100MW HEAT targeting c.30 MW NET ca €30 million Preparation Prep c. 3m 50% covered by Gov c.12-18months Net € 1.5m 2028 Worms Project Drill Pr

  13. Slide 13: London Listing: Enabling Scalable Growth

    London Listing: Enabling Scalable Growth No of shares at admission: SHAREHOLDING 333,914,907 Post Admission Fully diluted: 496,853,819 • Listed on London Stock Exchange Main Market (CINH) Equity Shares (Commercial Companies) category Market Cap at Admission: £40m • Provisional approval of inclusion

  14. Slide 14: Powering Europe's Clean Energy Future

    Powering Europe’s Clean Energy Future • A clean energy Owner - Operator & Developer WHO WE ARE • Focused on delivering scalable, baseload power & energy • Urgent need for reliable, Clean / low-carbon energy WHY NOW • Energy demand is surging. Global capacity must triple by 2050 • Fossil baseload is

  15. Slide 15: Committed to building shareholder value

    With established growing revenues, a clear growth path and multiple value uplift opportunities, Cindrigo is committed to building shareholder value, Near- Mid- and Long-Term ST focus - commence commercial operations at the Kapiola WtE plant Use the revenue and listing to support staged expansion int