Alkane Resources Ltd · ASX:ALK

Alkane Resources — Alkane Exploration — Shareholder Meeting (May 2003)

49 slides from Alkane Resources's shareholder meeting presentation, May 29, 2003

  1. Slide 1: Presentation letter to ASX

    ALKANE EXPLORATION LTD ABN 35 000 689 216 Ih CORPORATE OFFICE: 129 Edward Street, Perth WA 6000 (PO Box 8178, Perth Business Centre, Perth WA 6849) Telephone +61 8 9227 5677 Fax:+61 8 9227 8178 Email: mail@alkane.com.au 29 May 2003 Manager Announcements Company Announcements Office Australian Stock

  2. Slide 2: Annual General Meeting 29 May 2003

    LKANE EXPLORATION LTD & ABN 35 000 689 216 ANNUAL GENERAL MEETING 29 MAY 2003 Continued discovery and development

  3. Slide 3: Corporate Profile

    a CORPORATE PROFILE ASX Code ALK (listed since 1969) Issued Capital 134m shares Cash $5.0m 2002 Loss Profit (2001 / 2000 1999/1998) ($530,600 / $543,00 / $560,000 / $404,000) No Debt

  4. Slide 4: Corporate Summary

    CORPORATE SUMMARY ALKANE EXPLORATION LID Australian Public Listed Company 100% 100% PEAK HILL GOLD MINE AUSTRALIAN ZIRCONIA LTD 150,000 2 gold production DUBBO ZIRCONIA PROJECT Zirconia production SULPHIDE DEVELOPMENT Ytiria-Rare Earth production + 400,000 az resource Niobium Tantalum production EXP

  5. Slide 5: Locations

    ocations

  6. Slide 6: ab GL Sabie petal ues

    ab GL Sabie petal ues : Sel Brian) sediments: ince Y Grd ovicianwaleanic complexe

  7. Slide 7: Tomingley Gold Project Location

    | ‘Tomingley Gold ~~ Proj ect Location

  8. Slide 8: Slide 8

  9. Slide 9: Wyoming One Section

    — L - One | Section - © 6393375mN i £4

  10. Slide 10: Wyoming One drill hole section

    — Ove Tene cnon : | Drill hole with mineralisation - __ (Results in gitAu) __ Other drill hole. _ waaataha sn @ 347 G B Wrattd ben @ 4.30 2am @ 1087

  11. Slide 11: Wyoming Drillhole Summary

  12. Slide 12: Wyoming One Simplified Interpretation

  13. Slide 13: os

    os

  14. Slide 14: Wyoming Three idealised oblique view

    Wyoming | Three > Idealised— Oblique cue

  15. Slide 15: Wyoming Drillhole Summary: Wyoming Three

  16. Slide 16: Tomingley Gold Project Longitudinal Section - Wyoming

  17. Slide 17: Tomingley Project Aeromagnetic Images

    Tomingley Project Aeromagnetic Images

  18. Slide 18: Tomingley Gold Project Aeromagnetic Image

    Tomingley Gold Project Aeromagnetic Image ins

  19. Slide 19: Wyoming Prospect — December 2002

    Tomingley Gold Project Wyoming Prospect — December 2002 —

  20. Slide 20: Wyoming Prospect WY376

    Tomingley Gold Project Wyoming Prospect WY376

  21. Slide 21: Wyoming Prospect — March 2003

    _ Tomingley Gold Project Wyoming Prospect — March 2003 __

  22. Slide 22: BS So

    Co Le, << = es < : BS So ~~ SSeS < : eC x Ss oC =~ — SC = << OR se — Me Le Tae — - < SSS Se SRE = : ~ < SS = Se x + - . > + “ = < Se < oS SS ee oS SS SS = oe — Sa ~~ oc = ee ~ a < Se SS See = a ee = yy iy Yee A gy Wie ae Vie yy Ag; eee We eae ee We ee wae Se Oe ae ‘i / 1) i : : i / 1 a i) : i: / i:

  23. Slide 23: Wyoming Prospect — April 2003

    - Tomingley Gold Project | ‘Wyoming Prospect — April 2003

  24. Slide 24: Wyoming Three Prospect — April 2003

    Tomingley Gold Project Wyoming Three Prospect — April 2003

  25. Slide 25: = es eS pe i a ee ; a oe. ” Sa e So

    = es eS pe i a 2 ee ; a oe. ” Sa e So x = oS ee _ . ee a 8 _ = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = 7 = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =

  26. Slide 26: WY 468D — altered volcaniclastics

    Tomingley Gold Project WY 468D — altered volcaniclastics

  27. Slide 27: WY 468D — vein in altered volcaniclastics

    Tomingley Gold Project WY 468D — ve in altered volcaniclastics

  28. Slide 28: Selected 2003 Wyoming One Drill Results

    a TOMINGLEY GOLD PROJECT Selected 2003 Wyoming One Drill Results 22m @10.66g/tAu incl 2m @ 107.5g/t Au 8im@ 426g/tAu__ incl 13m @ 16.44g/tAu 54m @ 3.80g/tAu_ incl 6m @ 12.66q/t Au 120m @ 3.85g/tAu incl 12m @ 21.20g/t Au 156m @ 1./1g/tAu incl 15m @7.02g/t Au 39m @ 3.47gitAu_ incl 6m @ 15.06g/t Au 18m

  29. Slide 29: Wyoming Development Concept

    a TOMINGLEY GOLD PROJECT Wyoming Development Concept Total drilling from May 2001 to December 2002 ~ 40,000 m in 363 holes Total expenditure to December 2002 A$1.1 million Further 15,000 m RC and core resource drilling scheduled first half 2003 5,000 m target development aircore drilling planned til

  30. Slide 30: Peak Hill Gold Mine

    a PEAK HILL GOLD MINE High Sulphidation Epithermal Gold Copper System (Ordovician) Conventional Open Cut Mining, Agglomeration Heap Leach Dump Leach of Oxidised Cap Production Commenced 1996 at Capital Cost $5 million Mined 3.385Mt @ 1.91 g/t Au and 1.499Mt @ 0.78 g/t Au Production 2003 Estimated 5

  31. Slide 31: Peak Hill Gold Mine

    PEAK HILL GOLD MINE Me igs ‘ # j @

  32. Slide 32: Peak Hill sulphide

    ES Ss N ONE O Z ATI L PHIDE LLOC L L SU RI D

  33. Slide 33: Peak Hill Cross Section

    PEAK HILL CROSS SECTION PRD2,5,&6. _ sbomRL- git Au, 0.22% Cu 200m RL = 5.66g/t Au 0.35% 0.2% "130m @ 156 y 239 | Om

  34. Slide 34: Tomingley Gold Project sections

  35. Slide 35: Peak Hill Gold Mine — OCE

    PEAK HILL GOLD MINE — OCE Alkane’s commitment to sustainable development

  36. Slide 36: Peak Hill Gold Mine OCE

    PEAK HILL GOLD MINE OCE Alkane’s commitment to sustainable development

  37. Slide 37: Dubbo Zirconia Project Summary

    a DUBBO ZIRCONIA PROJECT SUMMARY « Project based upon large Jurassic aged alkaline volcanic complex with highly metal enriched vertical trachyte intrusive « One of the worlds largest | ,yttriumand resources (+ 100 million tonnes) - also contains significant and rare earth elements * Zirconium metal

  38. Slide 38: Dubbo Zirconia Project Site and Infrastructure Location

  39. Slide 39: Dubbo Zirconia Project Geology & Year Pit

    DUBBO ZIRCONIA PROJECT Geology & 20 Year Pit NN ne i Hl ey”

  40. Slide 40: Dubbo Zirconia Project Resources

    DUBBO ZIRCONIA PROJECT RESOURCES Measured Resource : 35.7 million tonnes grading 0 - 55 metres 1.96% Zr0,, 0.04%HfO,, 0.14% Y,O, 0.46% Nb,O,, 0.03% Ta,O; and 0.75% REO Inferred Resource : 37.5 million tonnes at similar grades 55 - 100 metres TOTAL ‘ 73.2 million tonnes

  41. Slide 41: Dubbo Zirconia Project Process Flow Sheet

    : DUBBO : IRCONIA PROJECT — _ PROCESS FLOW SHEET

  42. Slide 42: Mini Pilot Plant - Roaster

    DUBBO ZIRCONIA PROJECT Mini Pilot Plant - Roaster Ls

  43. Slide 43: Mini Pilot Plant - SX Circuit

    DUBBO ZIRCONIA PROJECT Mini Pilot Plant - SX Circuit

  44. Slide 44: Dubbo Zirconia Project Indicative Development

    DUBBO ZIRCONIA PROJECT INDICATIVE DEVELOPMENT Conceptual Project at start up 200,000tpa ore processed Zirconium products 3000 tpa zirconia (ZrO, + HfO,) equivalent ZBS Zirconium basic sulphate ZOH Zirconium hydroxide ZCO Zirconium carbonate ZrO. Zirconia (calcined) Niobium - tantalum 600 tpa niobium

  45. Slide 45: Dubbo Zirconia Project Indicative Financials

    DUBBO ZIRCONIA PROJECT INDICATIVE FINANCIALS Conceptual Project at 200,000tpa - DFS November 2002 Production - ZrO, (+HfO,) : 3000tpa <8% world Y,0,+ REO: 1200tpa <8% world Ta,O.,Nb,0.: 600tpa minor Revenue - $35.0 to $50.0 million Operating Costs- $30/32 million (base case - reducible) Capital Cost

  46. Slide 46: Preliminary Plant Layout

    ‘Preliminary Plant Layout

  47. Slide 47: Proje

    Proje aa

  48. Slide 48: Dubbo Zirconia Project Current Summary

    a DUBBO ZIRCONIA PROJECT Current Summary Advanced discussions in progress with existing major zirconia producer Agreement anticipated by the end of June 2003 Incoming party to earn an interest by funding construction and operation of demonstration pilot plant. Will provide product development techno

  49. Slide 49: The Team

    a THE TEAM Terry Ransted Chief Geologist Rimas Katraitis Senior Geologist David Meates Geologist Steve Woodham Field Supervisor Geoff Meates General Manager Gold Operations Shane Allison Operations Manager Mike Sutherland Environment Manager Glen Morgan Wet Plant Foreman David Moyses CAD — Drafting

Alkane Exploration — Shareholder Meeting (May 2003) on 6ix