Iron Road Ltd · ASX:IRD

Iron Road — RIU Explorers Conference 2011

24 slides from Iron Road's conference presentation, Feb 23, 2011

  1. Slide 1: Delivering Iron Ore Opportunities: On the Road to Development

    eee —imited Delivering Iron Ore Opportunities AS ase On the Road to Development Andrew Stocks, Managing Director RIU Explorers Conference, 23 February 2011

  2. Slide 2: Forward-Looking Statements

    Iron Road limited Forward-Looking Statements This presentation contains forward looking statements concerning the projects owned by Iron Road Limited. Statements concerning mining reserves and resources may also be deemed to be forward looking statements in that they involve estimates based on speci

  3. Slide 3: Iron Road is a developer of iron ore projects in Western Australia and South Australia

    Iron Road is a developer of iron ore projects in Western Australia and South Australia. Due to time constraints I will only be talking today about our main project, the Central Eyre iron project, or CEIP. So as we go through the presentation, bear in mind that the CEIP is a large magnetite project i

  4. Slide 4: IPO June 2008, GFC, and the Sentient Group on the register

     IPO June 2008, GFC not long after, later weakness due to RSPT/MRRT and options expiry 30 September 2010;  A key feature of the IRD share register is The Sentient Group. Sentient is a private equity firm specialising in resources projects;  Company maintained work levels during GFC with the suppo

  5. Slide 5: Iron Road listed on the ASX in June 2008 and commenced CEIP review

    Iron Road listed on the ASX in June 2008 and immediately moved to commence its review of the CEIP. The review was broken into three sequential stages, each addressing important criteria. The results of this review include size potential, potential concentrate specifications and mineral resource. 5

  6. Slide 6: Current work and key aspects of the CEIP

    Current work  Mineral Resource at February 2011 is 1.2Bt – the largest in South Australia  Exploration target of 2.87‐5.75Bt magnetite gneiss  Pre‐feasibility study  Infrastructure studies  Community engagement and impact study The CEIP has many high order targets, however we are concentrating

  7. Slide 7: Current work and Mineral Resource of 1.2Bt

    Now to cover off on what we are currently doing and how me meet other criteria necessary for this project to be a success. The mineral resource at Boo‐Loo and Dolphin is 328Mt, with a further 907Mt at Murphy South giving a global Mineral Resource on the CEIP of 1.2Bt. Geotechnical drilling is in pro

  8. Slide 8: Murphy South cross-section

    • Murphy South cross‐section as shown by black box on the previous slide – resource block model by Coffey Mining • The overall geometry suggests a large isoclinal fold (closure to south) • Subsequent Stage V drilling showed consistent results on each section as they were drilled • Cross‐section indi

  9. Slide 9: 2011 drilling programmes

    2011 drilling programmes will include investigations to Murphy South extension (east and west) and other high potential areas within the CEIP 9

  10. Slide 10: We have engaged accomplished consultants to assist us

    We have engaged accomplished consultants to assist us. 10

  11. Slide 11: Benchmarking - Concentrate Fe Grade

    Benchmarking - Concentrate Fe Grade Fe DTR Grade (%) 73 71 69 67 65 63 61 59 57 55 Iron Road limited GIR-Yerecoin@ EMG.Beyondic @ @ VMC-Yalgoo ARHBalmgral car aio © RO-CEIP (Pye 53 micron) AGO-Ridie GBG-Karare @ @ IRD-CEIP (Pg 75 micron) CXM-Bungalow ACS-Magnetite Range © CFE-Cape Lambert IRD-CEIP (

  12. Slide 12: Benchmarking - Concentrate SiO2 Grade

    Benchmarking - Concentrate SiO, Grade Iron Road limited 14 @ =FXR-Mt Oscar ta 2 BS a 40 © CFE-Cape Lambert © o a & Ke a x 6 “is Rie fe) ACS-Megnetite Range # © cxN-Bungalow Silica upper limit ” GBG-Karara @ IRD-CEIP (Pep 106 micron) @ 4 AGO-Ridley ® ® ARH-Salmoral GRR -Southd: @ IRD-CEIP (Psy 75 mic

  13. Slide 13: Projects above the Ideal Ratio line are Banded Iron Formations

    Majority of the projects above the Ideal Ratio line are Banded Iron Formations and are generally geologically younger than those below the line. CEIP is not only desirable due to the coarse grind, but also due to the SiO2/Al2O3 ratio – ideal complementary blending ore. 13

  14. Slide 14: Process design and grind size

    One possible process scenario is shown here. Key features of this process design include: • Early rejection of waste by dry and subsequent wet magnetic separation; • Early rejection of waste reduces power consumption and therefore operating costs; • Simple process, without flotation. Many of our pee

  15. Slide 15: Dry magnetic separation test work

    The CEIP test work has demonstrated exceptional response to dry magnetic separation at 14‐21mm particle size – nearly 50% rejection of feed and corresponding upgrade in grade. 15

  16. Slide 16: Material transport and infrastructure

    And of course, material transport. • We are currently considering a slurry pipeline as the operating cost is considerably lower than rail; • Our studies include power form Port Augusta; and • We have been in discussions with numerous parties for some time concerning potentially shared infrastructure

  17. Slide 17: Iron ore company focussed on developing its flagship Central Eyre Iron Project

     Iron ore company focussed on developing it’s flagship Central Eyre Iron Project.  Pre‐Feasibility study for potential 10Mtpa operation expected to be delivered in 1Q 2011;  Significant 4 billion tonne target identified by Coffey Mining;  Resource of 1.2Bt already identified;  Test work indicat

  18. Slide 18: Strong community relationships and local government support

     Strong community relationships and local government support. 17

  19. Slide 19: On the Road to Development

    Iron Road limited On the Road to Development aire com 18

  20. Slide 20: Appendix — Board & Management

    Appendix 1 — Board & Management Iron Road limited Chairman Non-Exec Director »— ~~ Non-Exec Director Julian Gosse lan Hume Jerry Ellis Company Secretary Graham Anderson Project Manager ~ Fop Venderhor Geology Manager Milo Res General Manager Larry Ingle Non-Exec Director Managing Director Matthew Ke

  21. Slide 21: Appendix 2a — CEIP Resource Statement

    Appendix 2a — CEIP Resource Statement Iron Road limited phy South Mineral Resource Estimate = ones 4 Tonnes Fe ‘SiO. A\,0. 2 Lol Resource Classification idation Material Type *e ae oe a (mt) (6) (96) (96) (%) (%) Fh Disseminated 242 177 52.4 12.0 0.09 03 resi Banded 53 13.4 54.6 14.1 0.07 os Inferre

  22. Slide 22: Appendix 2b — CEIP Resource Statement

    Appendix 2b — CEIP Resource Statement Iron Road limited Boo-Loo Mineral Resource Estimate . Pres L Resource Classification Oxidation ee ie Se non ie a Fresh 277 17.3 $2.5 11.5 0.095 0.5 Inferred Transitional 13 17.0 52.4 11.6 0.094 10.7 Oxide 33 17.2 $2.1 11.6 0.094. 10.3 Total 328 173 524 115 0.095

  23. Slide 23: Appendix 2c — CEIP Resource Statement

    Appendix 2c — CEIP Resource Statement Iron Road limited Central Eyre Iron Project Global Mineral Resource Estimate Resource Classification Oxidation pane i aa ae ity a Fresh 572 av. 52.7 12.0 0.09 0.4 Inferred Transitional 40 16.5 51.2 13.2 0.07 7.3 Oxide 81 16.8 $1.1 12.9 0.08 8.2 Total Inferred 69

  24. Slide 24: Appendix — CEIP Metallurgical test work

    Appendix 3 — CEIP Metallurgical test work Iron Road limited Fe Mass SiO. ALO; Pp Lol Fore (6) Rec (%) (6) ey (06) (66) Disseminated + 69.7 19.2 Tid! 1.0 0.00 Be Banded? 69.3 124 Oe 1.0 0.00 -3.4 P80 passing -40um 1 based on 1824 DTR composites across the Murphy South deposit only 2 based on 222 DTR