SAMA Resources Inc. · TSXV:SME
SAMA Resources — Non-Deal Roadshow (April 2024)
18 slides from SAMA Resources's roadshow presentation, Apr 23, 2024

Slide 1: Renmark Financial Non-Deal Roadshow: April 23rd, 2024
Renmark Financial Non-Deal Roadshow: April 23rd, 2024 Africa TSX.V: SME | OTC.PK: SAMMF

Slide 2: Forward Looking Statements
Forward Looking Statements Certain of the statements made and information contained herein are "forward-looking statements" or “forward-looking information” within the meaning of Canadian securities legislation. Forward-looking statements and forward-looking information such as “will”, could”, “expe

Slide 3: Why Nickel?
Why Nickel? Nickel production in 2023 was 3,600,000 tonnes per year World reserves of nickel per country, 2020 production worldwide (100,000,000 tonnes reserves worldwide) 4000 25 3600 3500 3270 20 3000 2730 2630 2610 2510 2450 2400 2500 2220 2280 15 2090 2160 1940 2000 1620 10 1500 1000 5 500 0 0 2

Slide 4: Why Nickel & Copper?
Why Nickel & Copper? Declining inventory of these two underexplored essential metals may lead to massive shortages and potentially higher spot prices TSX.V: SME | OTC.PK: SAMMF samaresources.com 4

Slide 5: SME: Corporate Summary
SME: Corporate Summary TSX-V: SME Ticker OTC-US: SAMMF Shares Outstanding 220,068,440 Options 21,095,000 Warrants Nil CAD$ 26,400,000 Market Cap (CAD$0.12 per share April 22nd -2024) Debt Nil Cash (April 22nd -2024) CAD$2,000,000 SHAREHOLDERS • Ivanhoe Electric 22.8% Securities Holdings 15.2 M share

Slide 6: SAMA Resources: Relocation SNC – Ivanhoe Electric Completes Earn-in
SAMA Resources: Relocation SNC – Ivanhoe Electric Completes Earn-in Ivanhoe Electric INC. 22.8% Ownership (50,000,000 shares) SRG Mining Inc. 13.36% ownership (15,180,378 shares) by Sama Resources Inc. Sama Resources Inc. SAMA Resources Development Spun-out January 2017 (Cayman) Lola Graphite deposi

Slide 7: Management
CORPORATE PROFILE Benoit La Salle – Executive Chairman and Director (FCPA, FCA, MBA) • President & CEO of AYA Gold & Silver Inc., former President & CEO of SEMAFO Inc. MANAGEMENT Marc-Antoine Audet – President, CEO, and Director (PhD Geology, P.Geo.) • 30 years of geological experience in exploratio

Slide 8: Samapleu-Grata March 2024 PEA
Samapleu-Grata March 2024 PEA “Samapleu-Grata project is highly attractive due to its polymetallic primary magmatic sulphide + PGE; a comparatively small CAPEX; great IRR; and for future production of high-quality Ni & Cu concentrates. The abundance of regional exploration potential deepens the stor

Slide 9: Samapleu & Grata: PEA Update
SAMAPLEU & GRATA : PEA UPDATE The Samapleu-Grata Nickel-Copper Project has one of the lowest The Figure below compares the copper concentrate grade of a total capital costs while producing a pre-tax IRR that is second only number of pre-production primary copper assets with copper head to the Tamara

Slide 10: Samapleu versus Norilsk's & Voisey Bay
SAMAPLEU VERSUS NORILSK'S & VOYSEY BAY More than 10 targets zones remaining to be investigated (doted circles) Samapleu Main Grata Samapleu Ext Draba TSX.V: SME | OTC.PK: SAMMF samaresources.com 10

Slide 11: Samapleu & Grata: PEA Update – 98% Completed
SAMAPLEU & GRATA : PEA UPDATE – 98% COMPLETED 2024 PEA Operating Results Life of Mine (LOM) 16.1 years Processing Rate (annual) 5,475,000 tpa Processing Rate (daily) 15,000 tpd The 2024 PEA outlines the potential for a conventional open pit mining operation supporting Ni Concentrate 887,414t Cu Conc

Slide 12: Samapleu & Grata: Flowsheet
SAMAPLEU & GRATA : FLOWSHEET Criteria Unit Value Nominal Ore Processing Rate dmt/y 5,475,000 Moisture Content of ROM Ore wt% 5.0 Crusher Run-time % 70.0 Life of Plant Operation y 17 Nominal Crushing Rate wmt/h 939.8 Concentrator Run-time % 92.0 Nominal Grinding Rate dmt/h 679.4 Nominal Nickel Concen

Slide 13: Samapleu & Grata: Flowsheet
SAMAPLEU & GRATA : FLOWSHEET TSX.V: SME | OTC.PK: SAMMF samaresources.com 13

Slide 14: Samapleu & Grata: Production
SAMAPLEU & GRATA : kt Ni eq. 20.0 PRODUCTION 17.7 17.6 18.0 16.4 16.2 16.2 15.6 16.0 15.6 15.5 16.0 15.0 14.8 15.3 14.7 13.9 13.9 14.5 Production schedule for ore 14.0 processing and concentrate 12.0 10.0 production over the proposed +16- 8.0 year mine life. 6.0 4.0 1.6 2.0 0.0 2029 2030 2031 2032 2

Slide 15: Samapleu & Grata: PEA Update
SAMAPLEU & GRATA : PEA UPDATE The mine site infrastructure has been planned and costed to support construction and operational activities. The infrastructure will include: Site development and internal roads; Site structures and installations; Process/concentrator plant; Connection to availa

Slide 16: Samapleu Project: Yepleu Surface Ni-Cu-PGE mineralization discovery
Samapleu Project: Yepleu Surface Ni-Cu-PGE mineralization discovery. TSX.V: SME | OTC.PK: SAMMF samaresources.com 16

Slide 17: Samapleu Project: New Near Surface Ni-Cu-PGE mineralization discovery
Samapleu Project: New Near Surface Ni-Cu-PGE mineralization discovery. Hole S-342 returning a 38 m thick mineralised magmatic pyroxenite with a 4.35 Hole S-341 showing massive sulphide lenses within a 21 m thick magmatic pyroxenite including 2.75 m of massive sulphide grading 1.58% Ni and 0.65% Cu.

Slide 18: Thank you
= ~~ Sama Resources Inc. Discovering Nickel-Copper-Palladium Districts Worldwide Thank you
Source: company website
More decks from SAMA Resources Inc.
Investor Presentation (November 2026)21 slides · Nov 12, 2026
Investor Presentation (November 2026)19 slides · Nov 4, 2026
Investor Presentation (July 2026)13 slides · July 2026
Investor Presentation (January 2024)24 slides · Jan 23, 2024
Investor Presentation (January 2024)24 slides · Jan 9, 2024
Investor Presentation (October 2023)28 slides · Oct 17, 2023