SAMA Resources Inc. · TSXV:SME
SAMA Resources — Investor Presentation (November 2026)
21 slides from SAMA Resources's investor presentation, Nov 12, 2026
Slide 1: Corporate Presentation November 12, 2026
November 12, 2026 TSX.V: SME | OTC.PK: SAMMF
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS Certain of the statements made and information contained herein are "forward-looking statements" or “forward-looking information” within the meaning of Canadian securities legislation. Forward-looking statements and forward-looking information such as “will”, could”, “expe
Slide 3: Who We Are?
WHO WE ARE? MOROCCO Sama Resources (soon to be renamed AXA Metals Corp) is a forward-looking company driven by exploration, innovation, AFRICA and responsible development. Our identity reflects strength, clarity, and commitment to creating long-term value. CÔTE D’IVOIRE TSX.V: SME | OTC.PK: SAMMF |
Slide 4: SME: Corporate Summary
SEM: Corporate Summary TSX-V: SME Ticker OTC-US: SAMMF Shares Outstanding 220,193,440 Options 17,950,000 Warrants Nil CAD$ 39.6M Market Cap (CAD$0.18 per share Nov 10-2026) Debt Nil Cash (Nov 01, 2026) CAD$6,800,000 SHAREHOLDERS • Ivanhoe Electric 22.8% • MMG (China Minmetals) 7.1% Project Locations
Slide 5: Sama Resources: Current Corporate Structure
SAMA RESOURCES: CURRENT CORPORATE STRUCTURE Ivanhoe Electric INC. Sama Resources Inc. SAMA Resources Spin-out janvier 2017 Development Sold shares for $Can 9.8M SAMA NICKEL (Cayman) CORPORATION (Cayman) 40% Sama – 60% IVNE SAMA SAMA NICKEL Société Minière CORPORATION Côte d’Ivoire SARL du Tonkpi SAR
Slide 6: Proposed New Corporate Structure
Sama Resources (AXA Metals Corp): PROPOSED NEW CORPORATE STRUCTURE Ivanhoe Electric INC. Aya Gold & Silver SAMA Resources SAMA NICKEL AXA Atlas Metals Development CORPORATION (to be created) (Cayman) (Cayman) 40% Sama – 60% IVNE SAMA SAMA NICKEL Société Minière CORPORATION Côte d’Ivoire SARL du Tonk
Slide 7: Why Nickel and Copper?
WHY NICKEL AND COPPER ? Declining inventory of the two underexplored essential metals could lead to massive shortages and potentially higher spot prices. Nickel 1 2 3 Copper 1 2 3 4 EV Batteries Stainless Steel Nickel Plating Construction Electromobility Renewable Energy Production Energy Effeciency
Slide 8: Samapleu-Grata Update Sept 2026
SAMAPLEU-GRATA UPDATE SEPT 2026 The 2026 program is an important step in demonstrating the substantial district-scale potential of the Project, through the discovery of additional mineralization and the delineation of new resources. The regional discovery-driven exploration program, building on the
Slide 9: Samapleu Project Global Mineral Resource Update for Q1 2027
SAMAPLEU PROJECT | GLOBAL MINERAL RESOURCE UPDATE for Q1 2027 119 Mt open pit mineral resources: PEA Demonstrates the Potential for a 16-Year Mine Producing Both a Conventional 26% Copper Concentrate and a 13% Nickel Concentrate, with Associated PGE By- Products. The Project presents a Pre-tax NPV8
Slide 10: Samapleu Project Global Mineral Resource Update: Q1 2027
SAMAPLEU PROJECT | GLOBAL MINERAL RESOURCE UPDATE : Q1 2027 Highlighted 2026 Yepleu drill intersections include: • S-371 intersected 36.15 m grading 1.04% CuEq or 0.88% NiEq (0.40% Ni, 0.24% Cu, 0.02% Co, 0.43 g/t Pd, 0.21 g/t Pt, 0.23 g/t Au) from 11.00 m depth o including 2.10 m grading 2.92% CuEq
Slide 11: Samapleu Project | Yepleu Prospect
SAMAPLEU PROJECT | YEPLEU PROSPECT: S-371 DDH Several Massive Sulphide intersections, including from 36.8 m to 39.00 m (assays pending) S-374 DDH Massive Sulphide from 6.80 m to 8.50 m (assays pending) TSX.V: SME | OTC.PK: SAMMF | 11
Slide 12: Samapleu Project | Yepleu Prospect
SAMAPLEU PROJECT | YEPLEU PROSPECT: 12-11-2026: Combined Mineral Intervals for 14 holes out of the 26 drilled at the Yepleu surface discovery (0.1% Cut-off Grade of Ni). HOLE-ID Start from LENGTH CuEq NiEq Ni Cu Co Pd Pt m m % % % gpt gpt S-358 17.60 5.10 1.01 0.86 0.53 0.31 0.02 0.10 0.04 Including
Slide 13: 2026 Surface Gravity: 100% Completed
2026 SURFACE GRAVITY : 100% COMPLETED More than 20 targets zones remaining to be investigated (doted circles) TSX.V: SME | OTC.PK: SAMMF | 13
Slide 14: 2026 Surface Gravity: 100% Completed
2026 SURFACE GRAVITY : 100% COMPLETED More than 20 targets zones remaining to be investigated (doted circles) TSX.V: SME | OTC.PK: SAMMF | 14
Slide 15: Azegour — Brownfield Cu–Mo–W Opportunity in Morocco
AZEGOUR — BROWNFIELD Cu–Mo–W OPPORTUNITY IN MOROCCO Past producer with underground development, processing infrastructure and modern exploration upside LOCATION RABAT CASABLANCA AZEGOUR ~60 km SSW of Marrakech | ~20 km SW of AGADIR OUARZAZATE Amizmiz | Road accessible | ~1,500 m elevation ALGERIA BR
Slide 16: Azegour — Geology & Mineralization
AZEGOUR — GEOLOGY & MINERALIZATION High-temperature intrusive-related skarn system with predictable metal zoning GEOLOGICAL MODEL Cambrian carbonate and volcano-sedimentary rocks were intruded by a late- Hercynian–Permian granite. Contact metamorphism generated garnetite, wollastonitite and pyroxeni
Slide 17: Azegour — Brownfield Cu–Mo–W Opportunity in Morocco
AZEGOUR — BROWNFIELD Cu–Mo–W OPPORTUNITY IN MOROCCO Past producer with underground development, processing infrastructure and modern exploration upside Flotation Warehouse Plant Power House BOARD THESIS Acquire a historically developed polymetallic district and apply modern database validation, 3D m
Slide 18: Azegour — Geology & Mineralization
AZEGOUR — GEOLOGY & MINERALIZATION High-temperature intrusive-related skarn system with predictable metal zoning GEOLOGICAL MODEL Cambrian carbonate and volcano-sedimentary rocks were intruded by a late-Hercynian–Permian granite. Contact metamorphism generated garnetite, wollastonitite and pyroxenit
Slide 19: Azegour — Historical Inventory
AZEGOUR — HISTORICAL INVENTORY: Historical figures are not current mineral resources and must not be relied upon as such ~1.0 Mt ~620 kt @ 0.38% Mo Reported residual Later historical Mo-bearing material estimate around the remaining at closure 1390 level LOCAL UNDERGROUND GRADES Reported mineralized
Slide 20: Azegour — Existing Infrastructure Can Accelerate the Work Program
AZEGOUR — EXISTING INFRASTRUCTURE CAN ACCELERATE THE WORK PROGRAM Historical figures are not current mineral resources and must not be relied upon as such Underground workings Old 2007’s flotation infrastructures Warehouse facilities FIRST 12 MONTHS — TECHNICAL PRIORITIES 1) Consolidate and digitize
Slide 21: Thank you
Thank you MOROCCO AFRICA CÔ TE D’IV O IRE
Sama Resources — Investor Presentation (November 2026) on 6ix