Broken Hill Mines Limited · ASX:BHM

Broken Hill Mines — Noosa Mining Conference 2025

23 slides from Broken Hill Mines's conference presentation, Nov 13, 2025

  1. Slide 1: Noosa Mining Conference Presentation

    For personal use only Noosa Mining Conference Presentation November 2025 Rasp & Pinnacles Ag-Pb-Zn Mines Consolidating one of Australia’s great mining jurisdictions

  2. Slide 2: Important Notice & Disclaimer

    Important Notice & Disclaimer Summary information This presentation has been prepared by Broken Hill Mines Limited (BHM or the Company) relating to the operation and Not a recommendation or financial product advice For personal use only development of the Rasp Mine and the Pinnacles Mine in Broken H

  3. Slide 3: Investment Highlights

    Investment Highlights Broken Hill Mines (ASX: BHM) is consolidating Broken Hill to become a significant silver, lead & zinc producer For personal use only BHM now controls two of three assets covering the largest & richest silver-lead-zinc ore Continuous ore body growth 300Mt Resource (15% Zn+Pb) Pr

  4. Slide 4: Investment Highlights (cont.)

    Investment Highlights (cont.) Hub & Spoke strategy driving a sustainable and growing future for a consolidated Broken Hill For personal use only Rasp Mine History: long-term, consistent silver-lead-zinc producer via single ore source, the Western Min orebody, with significant excess processing infra

  5. Slide 5: Investment Highlights (cont.)

    Investment Highlights (cont.) BHM is one of the few ASX-listed companies delivering significant & increasing exposure to silver production, For personal use only allowing investors to gain immediate exposure to the current all-time high silver price Strong silver demand growth and lack of material s

  6. Slide 6: Board and BHM Capital Structure

    Board BHM Capital Structure Track record in developing & operating world-class mature mines Completed reverse listing via the takeover of ASX-listed Coolabah Metals Ltd Patrick Walta A strong balance sheet and tight capital structure position Executive Chair BHM to capitalise on its upcoming signifi

  7. Slide 7: Rasp Mine

    Rasp Mine High-grade Main Lode ore feed now online For personal use only 7

  8. Slide 8: Rasp Overview & Growth Strategy

    Rasp Overview & Growth Strategy 10.1Mt @ 9.9% ZnEq, 273g/t AgEq2 (48.5g/t Ag, 3.2% Pb & 5.7% Zn)1 For personal use only Western Mineralisation N CML7 Centenary Main Lode Perilya North Mine Perilya South Mine High-Grade “Line of Lode” Workings (Remnant mining opportunity) Pinnacles Mine (15km) Main L

  9. Slide 9: High Grade Main Lode Now Online

    High Grade Main Lode Now Online Clear upside potential to existing Mineral Resource Estimate (MRE) based on identified targets and historical operational knowledge For personal use only Mining underway, shallow ore body starting ~200m depth Highlighted recent drilling1 intercepts include: • 4.3m @ 5

  10. Slide 10: Rasp's Infrastructure is Ideal for BHM's Hub & Spoke Strategy

    Rasp’s Infrastructure is Ideal for BHM’s Hub & Spoke Strategy Mining Processing & Surface Tailings For personal use only • Sub-level open stoping and up-hole stoping • Grinding, flotation, thickening and filtration • Current practice: • 100% owned operating mobile fleet • 750ktpa ore throughput capa

  11. Slide 11: Simple Processing of Zinc & Silver-Lead Concentrates

    Simple Processing of Zinc & Silver-Lead Concentrates Processing statistics since 2013: Rasp Processing Plant For personal use only 750ktpa capacity plant using conventional comminution  Zinc recovery (avg.): 88% (coarse 200µm grind) & sequential flotation  Lead recovery (avg.): 88%  Silver recove

  12. Slide 12: South Australia Rail Overview

    South Australia Rail Overview Established Logistics Supply Chain For personal use only Zinc concentrate typical grade: 49-50% zinc Lead concentrate typical grade: 65% Pb & 800 - 1,000g/t Ag Lead concentrate can be either transported to the Nyrstar Lead Smelter at Port Pirie or exported globally alon

  13. Slide 13: Pinnacles Mine

    Pinnacles Mine One of the highest-grade and shallowest deposits in Broken Hill For personal use only Overview of Pinnacles Operation 13

  14. Slide 14: Strategy: Rapid Open Pit Restart While Developing Perseverance Underground

    Strategy: Rapid Open Pit Restart While Developing Perseverance Underground For personal use only Pinnacles Mining History: • Pinnacles mining started in 1884, to a depth of 80m below surface only • Only the high grade silver-rich portions of lead lodes were mined, with zinc-rich ore and ‘low-grade’

  15. Slide 15: Pinnacles is Potentially the Most Significant Discovery in Broken Hill in 100 Years

    Pinnacles is Potentially the Most Significant Discovery in Broken Hill in 100 Years For personal use only BHM’s Inaugural ASX Pinnacles Release (22 September 2025) Exceptional High Grade Shallow Mineralisation (Section A – A’)1, 2 8.9m @ 54.6% ZnEq, 1,537g/t AgEq (922g/t Ag, 12.3% Pb, 1.6% Zn, 3.7g/

  16. Slide 16: Accelerating Pinnacles Growth

    Accelerating Pinnacles Growth Fast-track resource growth and development, with a 25,000m expanded drilling program across high-priority targets For personal use only Successful Phase 1 Drilling Program • Phase 1 program expanded by ~2,000 m (total ~6,000 m) following strong visual mineralisation and

  17. Slide 17: Near-Term Open Pit Potential

    Near-Term Open Pit Potential Updated Pinnacles Mineral Resource Estimate (MRE) on target for 1H CY2026 to assist with near-term open-pit mining decision For personal use only 1 BHM ASX Announcement 14 October 2025 – Further Exceptional Silver Grades & Shallow Intercepts up to 56.4% ZnEq, 1,562g/t Ag

  18. Slide 18: Pinnacles Mine Restart Planning

    Pinnacles Mine Restart Planning Rapidly progressing toward near-term restart, leveraging installed infrastructure, approved Mining Leases and expedited study programs alongside 25,000m expanded drilling program across high-priority targets For personal use only Pinnacles and Rasp are connected by ha

  19. Slide 19: Investment Proposition

    Investment Proposition For personal use only Solid Foundation: Rasp’s infrastructure and Western Mineralisation, providing a base for growth Near-Term Growth: Rasp’s Main Lode and Pinnacles’ Open Pit to increase metal production Silver Exposure: Silver-rich new ore sources significantly increasing A

  20. Slide 20: Key Development Timeline

    Key Development Timeline Accelerating “Stage 1” operations and large-scale “Stage 2” growth, targeting rapid near-term increase in production For personal use only Stage 1 | Expand to 750,000tpa FY26 FY27 FY28 Pinnacles Open Pit Drilling and Mining Study Pinnacles Operational Readiness and Site Work

  21. Slide 21: Mineral Resource Estimates

    Mineral Resource Estimates1,2 Rasp Pinnacles For personal use only Tonnes ZnEq AgEq Zn Pb Ag Tonnes ZnEq AgEq Zn Pb Ag Au Classification (kt) (%) (g/t) (%) (%) (g/t) Classification (kt) (%) (g/t) (%) (%) (g/t) (g/t) Main Lode Open Pit Measured 245 19.3 533 8.50 7.00 152 Measured 84 8.3 230 3.4 2.2 8

  22. Slide 22: Metal Equivalents

    Metal Equivalents Metal recoveries used in the zinc equivalent (ZnEq) and silver equivalent (AgEq) calculations for each element are based on the average metallurgical recoveries of Rasp achieved based on historical performance and applied to all ore types, including Pinnacles For personal use only

  23. Slide 23: For personal use only

    For personal use only Patrick Walta Shane Goodwin Executive Chairman Head of Corporate Affairs pwalta@brokenhillmines.com sgoodwin@brokenhillmines.com 23

Broken Hill Mines — Noosa Mining Conference 2025 on 6ix