Slide 1: Delivering a Generational Gold Project in the Heart of Canada
DELIVERING A GENERATIONAL GOLD PROJECT IN THE HEART OF CANADA CORPORATE PRESENTATION – JANUARY 2026 TSXV:AUXX | OTCQB:GSHRF | FRA:DF8
Slide 2: Disclaimers
TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 2 DISCLAIMERS Actual results and developments may differ materially from results and developments discussed in the forward-looking statements as they are subject to a number of significant risks and uncertainties, including: fluctuations in metals prices, price of c
Slide 3: Disclaimers
TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 3 DISCLAIMERS Qualified Person Mineral Resource Estimate Disclosure Peter Flindell, VP Exploration, is the Qualified Person as defined by NI 43-101, and has prepared and The Mineral Resource Estimate for the Moss Gold Project was prepared by Mr. Dominic Lussier, P.G
Slide 4: Gold X2 at a Glance
TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 4 | GOLD X2 AT A GLANCE Robust Economics with Strong PEA PEA a Base Case with attractive economics, significant leverage gold prices, optimization upside and extensive growth optionality High-Quality Mineral Resource Estimate Moss Deposit* PEA HIGHLIGHTS** US$2,750/
Slide 5: The Team
TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 5 | THE TEAM MANAGEMENT BOARD OF DIRECTORS Michael Henrichsen CEO & Director Tom Obradovich | Chairman ● Structural geologist and led the Torq technical team ● Mining exploration, development, & financing ● Previously the global structural geologist at Newmont, prof
Slide 6: Capital Structure
TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 6 | GOLD X2 DETAILS CAPITAL STRUCTURE SHAREHOLDER DISTRIBUTION TSX.V:AUXX Ticker OTCQB:GSHRF FRA:DF8 Share Price * $0.95 52 Week Low / High * $0.26 - $0.97 Market Cap * $472.0M Total Common Shares ** 496,825,290 4% Board and Management 36% Institutional Investors Wa
Slide 7: Infrastructure in Place to Support a District Scale Mining Camp
TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 7 INFRASTRUCTURE IN-PLACE RAIL 20 km TO SUPPORT A DISTRICT Direct access for heavy equipment GRID SCALE MINING CAMP & machinery POWER 11¢ / kWh power at HIGHWAY HILLCREST PROJECT project site Maintained road with direct access to Trans-Canada THUNDER BAY Highway 11
Slide 8: Summary of Project Economics
TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 8 | PEA HIGHLIGHTS SUMMARY OF PROJECT ECONOMICS $7B $6.6B NPV After Tax Base Con- Spot $6B After-tax NPV (5%) Base Case Metrics Case sensus Price Total Ore Tones Mined 138,982 $5B US $2,750 US $3,137 US $4,600 $4.0B NPV Mill Feed Daily Production 30,137 NPV $2,232M
Slide 9: Refined Geological Model Focused on Higher-Confidence Resource
TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 9 | MRE HIGHLIGHTS REFINED GEOLOGICAL MODEL FOCUSED ON HIGHER-CONFIDENCE RESOURCE 73% increase in indicated gold ounces vs prior estimate 2025 G-MINING SERVICES OPEN PIT MINERAL RESOURCE ESTIMATE* Material upgrade in MOSS DEPOSIT (Jan 16, 2026) resource confidence,
Slide 10: Moss Gold Project Open Pit Resource Summary
TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 10 PRODUCED BY: | UPDATED MRE MOSS GOLD PROJECT KEY CHANGES OPEN PIT RESOURCE SUMMARY WITH NEW MRE (Jan 16, 2026) Underground ounces GOLD SILVER excluded from resource model Tonnes Grade Gold Grade Silver Inferred spacing tightened (Mt) (g/t Au) (Moz Au) (g/t Ag) (M
Slide 11: Base Case Illustrates Large-Scale Gold Production
TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 11 | PEA 265,000 oz/yr LOM Average Annual Gold BASE CASE ILLUSTRATES 374,000 oz/yr LOM Average Annual Silver LARGE-SCALE GOLD PRODUCTION 269,000 oz/yr LOM Average Annual AuEq1 Stockpile strategy not yet optimized: Potential for higher grade throughput in early years
Slide 12: PEA Base Case - Strong Margins and Free Cash Flow Generation
TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 12 | PEA PEA BASE CASE - STRONG MARGINS AND FREE CASH FLOW GENERATION ** INITIAL CAPEX $2,001M CAD ($1,493M USD) $10.466B CAD Annual Free Cash Flow (C$mm) Cumulative After-Tax Project FCF @ Spot $4.035B CAD Cumulative After-Tax Project FCF @ Base Case Base Case : Go
Slide 13: Capital Cost Breakdown
TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 13 | DETAILED CAPEX BREAKDOWN COMPREHENSIVE COST ESTIMATION METHODOLOGY CAPITAL COST BREAKDOWN Capex estimates Potential to reduce benchmarked to upfront capital costs Greenstone construction through financing INITIAL CAPEX $2,001M CAD (US$1,493M) (managed by G-Mini
Slide 14: Metallurgical Process Flowsheet
TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 14 | PEA CRUSHERS SAG & BALL MILLS PAPER SIZE FORMAT : A1 LEGEND SECONDARY CRUSHER DISCHARGE CONVEYORS 1 PRIMARY PEBBLE RECYCLE PRIMARY CYCLONE 1 INTERMITTENT SECONDARY CRUSHER CONVEYOR CLUSTER FUTURE Conventional DISCHARGE CONVEYOR
Slide 15: Potential to Be a Top 10 Producing Gold Mine in Canada
TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 15 | PEA POTENTIAL TO BE A PEA DEMONSTRATES TOP 10 A BASE CASE WITH PRODUCING GOLD MINE POTENTIAL TO EXPAND* IN CANADA (1) (4) 26 YEAR LOM 13 YEAR LOM 19 YEAR LOM 18 YEAR 26 YEAR LOM 13 YEAR LOM 24 YEAR LOM LOM (3) (5) (6) Source: Corporate disclosure; S&P Capital I
Slide 16: Moss Resource Has Potential for Resource Increase at Depth
TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 16 | SIZE & SCALE MOSS RESOURCE HAS POTENTIAL FOR RESOURCE INCREASE BASED ON MINERALIZED INTERCEPTS AT DEPTH No underground resources are currently estimated, and no economic analysis has been completed for any underground material.
Slide 17: 2-Year Plan to Enter Feasibility Study, EA & Permitting
TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 17 | PROJECT SCHEDULE 2-YEAR PLAN TO ENTER FEASIBILITY STUDY, EA & PERMITTING Q1 2026 Q2 2026 Q3 2026 Q4 2026 Q1 2027 Q2 2027 Q3 2027 Q4 2027 Resource Growth & Definition RESOURCE GROWTH & DEFINITION Grow and upgrade the Mineral Resource through drilling to support
Slide 18: District Exploration Has Defined Two Major Trends
TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 18 | EXPLORATION UPSIDE GOLD-RICH NORTH COLDSTREAM VMS POTENTIAL COPPER VMS MINE DISTRICT EXPLORATION EAST COLDSTREAM HAS DEFINED TWO DEPOSIT MAJOR TRENDS MOSS DEPOSIT ARDEEN DEATY TREND GOLD MINE OPEN TO SOUTHWEST MOSS TREND EXTENSION Mineralized Trend Historical M
Slide 19: Star Lake Is the 3rd Major Gold-in-Till Anomaly in the Region
TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 19 | RECENT ACQUISITION 20km STAR LAKE IS THE 3RD MAJOR GOLD-IN-TILL ANOMALY IN THE REGION DISTRICT SCALE LAND PACKAGE HILLCREST PROJECT DELTA-1 EUREKA GOLD DISCOVERY 48,445 Total Hectares GOLD X2 MOSS GOLD PROJECT STAR LAKE PROJECT ARDEEN KEKEK STAR LAKE NEW ACQUIS
Slide 20: Key Attributes Supporting a Premium P/NAV Valuation
TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 20 | RE-RATING POTENTIAL KEY ATTRIBUTES SUPPORTING A PREMIUM P/NAV VALUATION P/NAV VS. INDUSTRY AVERAGES 1 2 TRADING AT A SIGNIFICANT TIER 1 ASSET POTENTIAL 160% 150% DISCOUNT TO DEVELOPER 1.45x Project Base Case Scenario has potential to improve 140% PEER GROUP 1.3
Slide 21: For More Information, Please Contact
TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 FOR MORE INFORMATION, PLEASE CONTACT Michael Henrichsen CEO & Director info@goldx2.com Gold X2 Mining Inc. 450 Commerce Place, 400 Burrard Street, Vancouver, BC, V6C 3A6 GoldX2.com
Slide 22: Moss Gold Project Open Pit Mineral Resource Estimate
TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 22 PRODUCED BY: | APPENDIX Notes to the Mineral Resource statement: MOSS GOLD PROJECT OPEN PIT 1. The mineral resources described above have been prepared in accordance with the CIM Standards (Canadian Institute of Mining, Metallurgy and Petroleum, 2014) and follow