Gold X2 Mining Inc. · TSXV:AUXX

Gold X2 Mining — Investor Presentation (April 2026)

24 slides from Gold X2 Mining's investor presentation, April 2026

  1. Slide 1: Delivering a Generational Gold Project in the Heart of Canada

    DELIVERING A GENERATIONAL GOLD PROJECT IN THE HEART OF CANADA CORPORATE PRESENTATION – APRIL 2026 TSXV:AUXX | OTCQB:GSHRF | FRA:DF8

  2. Slide 2: Disclaimers

    TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 2 DISCLAIMERS Actual results and developments may differ materially from results and developments discussed in the forward-looking statements as they are subject to a number of significant risks and uncertainties, including: fluctuations in metals prices, price of c

  3. Slide 3: Disclaimers

    TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 3 DISCLAIMERS Qualified Person Mineral Resource Estimate Disclosure Peter Flindell, VP Exploration, is the Qualified Person as defined by NI 43-101, and has prepared and The Mineral Resource Estimate for the Moss Gold Project was prepared by Mr. Dominic Lussier, P.G

  4. Slide 4: Gold X2 at a Glance

    TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 4 | GOLD X2 AT A GLANCE Robust Economics with Strong PEA PEA a Base Case with attractive economics, significant leverage gold prices, optimization upside and extensive growth optionality High-Quality Mineral Resource Estimate Moss Deposit* PEA HIGHLIGHTS** US$2,750/

  5. Slide 5: The Team: Management and Board of Directors

    TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 5 | THE TEAM MANAGEMENT BOARD OF DIRECTORS Michael Henrichsen ● Structural geologist and led the Torq technical team ● Previously the global structural geologist at Newmont, CEO & Director where his contributions significantly increased the reserves Tom Obradovich |

  6. Slide 6: Capital Structure

    TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 6 | GOLD X2 CAPITAL STRUCTURE STRATEGIC PARTNERSHIPS 598,306,376 16.6% PARTNER CAPITAL FROM MEMBERS Basic Shares Outstanding2 RSU2 8,910,000 38,447,767 9.9% 2 Options Warrants2 25,219,891 FDS Pro-Forma2 670,884,034 4.0% Share Price1 $1.49 Market Capitalization1 $891

  7. Slide 7: $115.89 Million Strategic Financing

    TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 7 | OVERVIEW: STRATEGIC FINANCING $115.89 MILLION STRATEGIC FINANCING CAPITALIZED FOR SIGNIFICANT NEAR-TERM VALUE CREATION Partnership with • $72,738,301 Charity Flow-Through Funds Tier 1 Global Major • Pro-Forma 9.9% Shares Outstanding Technical Committee • Investo

  8. Slide 8: Infrastructure in Place to Support a District Scale Mining Camp

    TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 8 INFRASTRUCTURE IN-PLACE RAIL 20 km TO SUPPORT A DISTRICT Direct access for heavy equipment GRID SCALE MINING CAMP & machinery POWER 11¢ / kWh power at HIGHWAY HILLCREST PROJECT project site Maintained road with direct access to Trans-Canada THUNDER BAY Highway 11

  9. Slide 9: PEA Highlights

    TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 9 | PEA HIGHLIGHTS $7.5B SUMMARY OF PROJECT ECONOMICS $8B NPV $7B After Tax After-tax NPV (5%) Base Case Base Case Consensus Upside Case Metrics US $2,750 US $3,300 US $5,000 $6B Total Ore Tones Mined 138,982 Mill Feed Daily Production 30,137 NPV $5B $4.0B 5% $2,232

  10. Slide 10: Refined Geological Model Focused on Higher-Confidence Resource

    TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 10 | MRE HIGHLIGHTS REFINED GEOLOGICAL MODEL FOCUSED ON HIGHER-CONFIDENCE RESOURCE 73% increase in indicated gold ounces vs prior estimate 2025 G-MINING SERVICES OPEN PIT MINERAL RESOURCE ESTIMATE* Material upgrade in MOSS DEPOSIT (Jan 16, 2026) resource confidence,

  11. Slide 11: Moss Gold Project Open Pit Resource Summary

    TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 11 PRODUCED BY: | UPDATED MRE MOSS GOLD PROJECT KEY CHANGES OPEN PIT RESOURCE SUMMARY WITH NEW MRE (Jan 16, 2026) Underground ounces GOLD SILVER excluded from resource model Tonnes Grade Gold Grade Silver Inferred spacing tightened (Mt) (g/t Au) (Moz Au) (g/t Ag) (M

  12. Slide 12: Base Case Illustrates Large-Scale Gold Production

    TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 12 | PEA 265,000 oz/yr LOM Average Annual Gold BASE CASE ILLUSTRATES 374,000 oz/yr LOM Average Annual Silver LARGE-SCALE GOLD PRODUCTION 269,000 oz/yr LOM Average Annual AuEq1 Stockpile strategy not yet optimized: Potential for higher grade throughput in early years

  13. Slide 13: PEA Base Case - Strong Margins and Free Cash Flow Generation

    TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 13 | PEA PEA BASE CASE - STRONG MARGINS AND FREE CASH FLOW GENERATION ** INITIAL CAPEX $2,001M CAD ($1,493M USD) $11.750B CAD Cumulative After-Tax Annual Free Cash Flow (C$mm) Project FCF @ Upside Case $4.035B CAD Cumulative After-Tax Project FCF @ Base Case Base Ca

  14. Slide 14: Capital Cost Breakdown

    TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 14 | DETAILED CAPEX BREAKDOWN COMPREHENSIVE COST ESTIMATION METHODOLOGY CAPITAL COST BREAKDOWN Capex estimates Potential to reduce benchmarked to upfront capital costs Greenstone construction through financing INITIAL CAPEX $2,001M CAD (US$1,493M) (managed by G-Mini

  15. Slide 15: PEA Crushers, SAG & Ball Mills Process Flow

    TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 15 | PEA CRUSHERS SAG & BALL MILLS PAPER SIZE FORMAT : A1 LEGEND SECONDARY CRUSHER DISCHARGE CONVEYORS 1 PRIMARY PEBBLE RECYCLE PRIMARY CYCLONE 1 INTERMITTENT SECONDARY CRUSHER CONVEYOR CLUSTER FUTURE Conventional DISCHARGE CONVEYORS 2 SAG MILL DISCHARGE SECONDARY C

  16. Slide 16: PEA Demonstrates a Base Case with Potential to Expand

    TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 16 | PEA POTENTIAL TO BE A PEA DEMONSTRATES TOP 10 A BASE CASE WITH PRODUCING GOLD MINE POTENTIAL TO EXPAND* IN CANADA (1) (4) 26 YEAR LOM 13 YEAR LOM 19 YEAR LOM 18 YEAR 26 YEAR LOM 13 YEAR LOM 24 YEAR LOM LOM (3) (5) (6) Source: Corporate disclosure; S&P Capital I

  17. Slide 17: Moss Resource Has Potential for Increase Based on Intercepts at Depth

    TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 17 | SIZE & SCALE MOSS RESOURCE HAS POTENTIAL FOR RESOURCE INCREASE BASED ON MINERALIZED INTERCEPTS AT DEPTH SW SOUTHWEST ZONE MAIN ZONE QES ZONE NE 3.6 km 500mRL 25-30% VOLUME INCREASE IN SECONDARY SHEARS RPEEE shell ($2,200) 0mRL Primary Target Areas for Potential

  18. Slide 18: 2-Year Plan to Enter Feasibility Study, EA & Permitting

    TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 18 | PROJECT SCHEDULE 2-YEAR PLAN TO ENTER FEASIBILITY STUDY, EA & PERMITTING Q1 2026 Q2 2026 Q3 2026 Q4 2026 Q1 2027 Q2 2027 Q3 2027 Q4 2027 Resource Growth & Definition RESOURCE GROWTH & DEFINITION Grow and upgrade the Mineral Resource through drilling to support

  19. Slide 19: District Exploration Has Defined Two Major Trends

    TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 19 | EXPLORATION UPSIDE GOLD-RICH NORTH COLDSTREAM VMS POTENTIAL COPPER VMS MINE DISTRICT EXPLORATION EAST COLDSTREAM HAS DEFINED TWO DEPOSIT MAJOR TRENDS MOSS DEPOSIT ARDEEN DEATY TREND GOLD MINE OPEN TO SOUTHWEST Ardeen MOSS TREND Trend EXTENSION Moss Trend Extens

  20. Slide 20: Star Lake Is the 3rd Major Gold-in-Till Anomaly in the Region

    TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 20 | RECENT ACQUISITION 20km STAR LAKE IS THE 3RD MAJOR GOLD-IN-TILL ANOMALY IN THE REGION DISTRICT SCALE LAND PACKAGE HILLCREST PROJECT DELTA-1 EUREKA GOLD DISCOVERY 48,445 Total Hectares GOLD X2 MOSS GOLD PROJECT STAR LAKE PROJECT ARDEEN KEKEK STAR LAKE NEW ACQUIS

  21. Slide 21: Ticking All the Boxes

    TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 21 | RE-RATING POTENTIAL TICKING ALL THE BOXES P/NAV VALUATION VS. INDUSTRY CONSENSUS AVERAGES 123 1.37x TIER 1 ASSET POTENTIAL Project Base Case Scenario has potential to improve 1.21x through mine life extensions, improve metallurgical recoveries, and optimized mi

  22. Slide 22: Entering Phase 2 of Value Creation

    TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 22 | NEAR-TERM CATALYSTS ENTERING PHASE 2 OF VALUE CREATION PHASE 1 – LAST 12 MONTHS PHASE 2 – NEXT 24 MONTHS H1 2025 Q4 2025 Jan 2026 Jan 2026 Q1 – Q4 2026 H2 2026 Q1 – Q4 2026 H2 2027 BELT STRATEGIC 2026 DRILLING CAPITAL TECHNICAL ENTER WINTER PEA DRILLING CONSOLI

  23. Slide 23: For More Information, Please Contact Michael Henrichsen

    TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 FOR MORE INFORMATION, PLEASE CONTACT Michael Henrichsen CEO & Director info@goldx2.com Gold X2 Mining Inc. 450 Commerce Place, 400 Burrard Street, Vancouver, BC, V6C 3A6 GoldX2.com

  24. Slide 24: Moss Gold Project Open Pit Mineral Resource Estimate

    TSXV:AUXX | OTCQB:GSHRF | FRA:DF8 24 PRODUCED BY: | APPENDIX Notes to the Mineral Resource statement: MOSS GOLD PROJECT OPEN PIT 1. The mineral resources described above have been prepared in accordance with the CIM Standards (Canadian Institute of Mining, Metallurgy and Petroleum, 2014) and follow

Gold X2 Mining — Investor Presentation (April 2026) on 6ix