Talisman Mining Limited · ASX:TLM
Talisman Mining — Shareholder Meeting (November 2013)
20 slides from Talisman Mining's shareholder meeting presentation, Nov 25, 2013
Slide 1: Annual General Meeting 25th November 2013
For personal use only Annual General Meeting 25th November 2013
Slide 2: 2013 Exploration Update
For personal use only Annual General Meeting 2013 Exploration Update 2
Slide 3: Disclaimer and Competent Person's Statements
Disclaimer and Competent Person’s Statements Disclaimer For personal use only This presentation is not a prospectus nor an offer for securities in any jurisdiction nor a securities recommendation. The information in this presentation is an overview and does not contain all information necessary for
Slide 4: 2013 Strategic Independent Technical Review
2013 Strategic Independent Technical Review Commenced in late 2012 and continued For personal use only throughout the first half of 2013 Purpose: To assess the validity of our exploration strategy Independently confirmed To assess the prospectivity of our existing projects Independently confirmed To
Slide 5: 2013 Strategic Independent Technical Review
2013 Strategic Independent Technical Review For personal use only Additional Outcomes: Characterised DeGrussa deposit style Potential for additional copper deposit styles identified Deposit models developed Detailed exploration toolkits established Regional targeting exercise undertaken – targets id
Slide 6: 2013 Springfield Project in Review
For personal use only Annual General Meeting 2013 Springfield Project in Review 6
Slide 7: Springfield Project
For personal use only Springfield Project 7
Slide 8: Springfield Project – Homer
Springfield Project – Homer Along strike from DeGrussa For personal use only Hosts extension of the DeGrussa Mine Corridor Sandfire actively exploring along DeGrussa Mine Corridor Widespread anomalous Cu intersections returned from drilling Improved understanding of the complex geological setting cr
Slide 9: Springfield Project – Jenkin Fault Zone
Springfield Project – Jenkin Fault Zone Prospective for structurally For personal use only controlled copper deposits Amenability of target areas for soil geochemical sampling assessed Sampled amenable area Lovejoy Prospect: Located in prospective geological position Hosts large MLEM anomaly Previou
Slide 10: Springfield Project – Southern Volcanics
Springfield Project – Southern Volcanics For personal use only Multi-pronged strategy targeting VHMS and structurally controlled copper-gold deposits New areas of interest identified at the Kink and Wedge Exploration Activities Geological Mapping Soil sampling VTEM & Fixed loop EM RC and AC drilling
Slide 11: 2013 Halloween Projects in Review
For personal use only Annual General Meeting 2013 Halloween Projects in Review 11
Slide 12: Halloween Project
For personal use only Halloween Project 12
Slide 13: Halloween Project
Halloween Project Prospective for copper and gold For personal use only mineralisation Deep diamond RC holes drilled to test the down-plunge extents of the defined copper-gold mineralisation Best gold and copper intersections HRC002 - 9m @ 3.8g/t Au including 1m @ 14.0g/t Au HRC024 6m @ 2.67g/t Au i
Slide 14: Halloween West Joint Venture – Recent Activities
Halloween West Joint Venture – Recent Activities Hosts the western extension For personal use only of the Halloween Horizon Detailed soil sampling program completed to test: the western extension of the prospective Halloween target horizon; and prospective horizon (with malachite) in the north-east
Slide 15: 2013 Livingstone Project in Review
For personal use only Annual General Meeting 2013 Livingstone Project in Review 15
Slide 16: Livingstone Gold and Base Metals Project
Livingstone Gold and Base Metals Project For personal use only 16
Slide 17: Livingstone Gold and Base Metals Project
Livingstone Gold and Base Metals Project Potential gold opportunities: For personal use only Prospective geological setting with ~ 31km strike length Widespread high-grade historic gold intercepts Potential for intrusive magmatic nickel-copper-PGE mineralisation: Two large ovoid magnetic bodies inte
Slide 18: Livingstone Project – Kerba Ni-Cu-PGE Target
Livingstone Project – Kerba Ni-Cu-PGE Target Systematic approach to confirm For personal use only potential for Ni-Cu-PGE Review of historical Ni exploration – 1971 Detailed soil sampling complete FLEM survey undertaken First pass RC drilling to test: The presence of nickel sulphide mineralization;
Slide 19: Next Steps
Next Steps Strong financial position provides capacity to continue exploration For personal use only Results of recent exploration activities will determine exploration strategy for the beginning of 2014 Homer Kerba Jenkin Fault Zone Halloween Ongoing assessment of: Other Springfield prospects Other
Slide 20: Annual General Meeting 25th November 2013
For personal use only Annual General Meeting 25th November 2013
Talisman Mining — Shareholder Meeting (November 2013) on 6ix