Slide 1: Elementos Investor Presentation
ELEMENTOS INVESTOR PRESENTATION (ASX:ELT) April 2017 For personal use only Building a profitable, robust and sustainable tin mining company
Slide 2: Elementos Overview
ELEMENTOS OVERVIEW For personal use only • Elementos is a tin focused exploration and development company which owns 100% of the Cleveland Tin Project • The Global tin market is robust and growing • Global tin demand outstripping supply reflected in increased prices • Expanded open cut strategy to m
Slide 3: Cleveland Milestones
CLEVELAND MILESTONES For personal use only • Open cut and underground resources determined • Metallurgical process flow sheet developed • Open cut scoping study completed • Underground scoping study completed • Tailings dam re-treatment prefeasibility study completed • Mine Lease Application lodged
Slide 4: New Cleveland Development Strategy
NEW CLEVELAND DEVELOPMENT STRATEGY For personal use only • The Cleveland Tin Project is located within a world class tin province in north west Tasmania with excellent infrastructure • An internal review in Q3/4 2016 resulted in a new strategy to enhance the value of Cleveland • Limited historical e
Slide 5: New Cleveland Development Strategy
NEW CLEVELAND DEVELOPMENT STRATEGY For personal use only • An expanded open cut will significantly reduce Open Cut project risk and improve sustainability and profitability Three dimensional • The expanded open cut strategy will reduce schematic of current proposed dilution and ore losses Open Cut o
Slide 6: Elementos Team
ELEMENTOS TEAM For personal use only Andy Greig Chris Dunks Chairman Executive Director 35 years of experience with Bechtel Group Inc. Mechanical Engineer with 25 years natural Bechtel Director and President of Bechtel resources project delivery experience. Mining and Metals Global Business Unit. Co
Slide 7: Global Tin Market
GLOBAL TIN MARKET For personal use only Tin sector performing strongly – low global tin stocks
Slide 8: Global Tin Market
GLOBAL TIN MARKET For personal use only Global Refined Tin Production vs Consumption 2016 - 2020 400 380 '000 tonnes of Refined Tin 40,000 tonnes per year 360 340 shortfall in global tin 320 production forecast by 300 Secondary refined tin production 2020 280 260 Existing mine tin production 240 201
Slide 9: Global Tin Market
GLOBAL TIN MARKET TOTAL ESTIMATED ANNUAL REFINED USE = 345,700 TONNES For personal use only Traditional and modern tin uses
Slide 10: Cleveland Advancements 2017
CLEVELAND ADVANCEMENTS 2017 For personal use only EXPLORATION: • Exploration drilling programme targeting expanded open cut resources ready to commence. New drill targets identified from recently completed ground magnetic survey and geological mapping. METALLURGY: • Optimised metallurgical test work
Slide 11: Cleveland Exploration Programme
CLEVELAND EXPLORATION PROGRAMME For personal use only • Target – to increase open cut resources to 2 million tonnes from the current 0.8 million tonnes • Ground magnetic survey completed in January 2017 • Several new magnetic anomalies identified Magnetic Anomalies • 16 hole first phase diamond dril
Slide 12: Cleveland Metallurgical Testwork
CLEVELAND METALLURGICAL TESTWORK For personal use only TARGETING IMPROVED METAL RECOVERIES AND INCREASED PROJECT REVENUE Enhanced Metallurgical Testwork Programme at ALS Laboratories in Burnie and Processing Plant Design for Tailings Retreatment Perth continuing in 2017 (sulphide float)
Slide 13: Cleveland Resource Inventory
CLEVELAND RESOURCE INVENTORY Open Pit Tin-Copper Mineral Resource (at 0.35% Sn cut-off) For personal use only NOTE: this Open Pit Tin-Copper Mineral Resource is a sub-set of the Total Tin-Copper Mineral Resource noted below Category Tonnage Sn Grade Contained Sn Cu Grade Contained Cu Indicated 0.80
Slide 14: Cleveland Project Timeline
CLEVELAND PROJECT TIMELINE For personal use only Jun Qtr Sep Qtr Dec Qtr Mar Qtr Jun Qtr Jun Qtr Sep Qtr Dec Qtr Mar Qtr Jun Qtr 2017 2017 2017 2018 2018 2018 2018 2018 2019 2019 Drilling Resource Modelling Mining Studies Metallurgy - Pilot Testing Process Plant Design Tailings Storage Design & Engi
Slide 15: Reasons to Invest in Elementos
REASONS TO INVEST IN ELEMENTOS For personal use only • Elementos’ share price is significantly undervalued • Global tin market is robust with ongoing strong demand based on the back of traditional applications and adaptation by modern technologies • 100% owned Cleveland tin exploration and developme
Slide 16: Elementos – Company Snapshot
Elementos – Company Snapshot For personal use only Capital Structure (March 2017) 100% - Cleveland Tin Project Shares on issue 849.3m Tin, copper and tungsten JORC resources Options on issue 20.3m Open pit and underground scoping studies completed Share price ASX (27Mar2017) A$0.008 Tailings re-trea
Slide 17: Cautionary Statements
CAUTIONARY STATEMENTS Forward-looking statements This document may contain certain forward-looking statements. Such statements are only predictions, based on certain assumptions and involve known For personal use only and unknown risks, uncertainties and other factors, many of which are beyond the c