  1. Slide 1: Gold, Copper & Critical Minerals

    GOLD , COPPER & CRITICAL MINERALS Advancing Targeted Exploration and Near-Term Production Strategy

  2. Slide 2: Important Notices and Disclaimer

    Important Notices and Disclaimer Purpose of this document This presentation dated 25 May 2026 has been prepared by Metal Bank Limited ACN 127 297 170 (MBK) for general information purposes using the information available to MBK at that date. The information in the Presentation is of a general nature

  3. Slide 3: Phased Execution of Gold Deposits into Production

    Phased Execution of Gold Deposits into Production Four WA Gold Deposits Phased into Production Phase One: Whiteheads Gold Project – first production at Seven Leaders JORC 2012 MRE: 138,000t @ 1.4 g/t for 6,300oz (6,200oz Indicated, 100oz Inferred)1 Starter Pit to refine mining and processing skills

  4. Slide 4: The MBK Opportunity – Expedited Gold Production Strategy

    The MBK Opportunity – Expedited Gold Production Strategy 2026 2027 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 M Govt Approvals for Permitting application small mine Native Title & Access Whiteheads Agreements Seven Technical Mine Plan/sched VE Study - OPA or self perform FID Phase Leaders Steri Drilling One Access wor

  5. Slide 5: Phase One: Whiteheads Gold Project - Seven Leaders

    Phase One: Whiteheads Gold Project - Seven Leaders Multiple Prospects Potential for Significant Expansion  Approximately 80km NE of Kalgoorlie in world class minerals province  Significant exploration upside supported by over 10,000 metres of historical drilling, extensive soil sampling, gravity s

  6. Slide 6: Phase Two: Livingstone Project

    Phase Two: Livingstone Project Multiple Prospects Support Potential for Significant Expansion Livingstone global gold resource 2.81Mt @ 1.36g/t Au for 122.6koz Au (70% Inferred, 30% Indicated)1  Homestead – 100Mt @ 1.35g/t Au for 43.4koz Au (83% Indicated; 17% Inferred)  Winja - maiden JORC 2012 r

  7. Slide 7: Phase Three: Whiteheads and Livingstone

    Phase Three: Whiteheads and Livingstone Whiteheads Blue Poles  Broad, plunging cigar shaped shoot of gold mineralization up to 45m wide over a strike extent of ~1km4  Extensive historical drilling2,3,4 Lady Betty and Lady Geraldine  Opportunity to add high-grade ore  Historically a high-grade go

  8. Slide 8: Millennium Copper & Cobalt Project - Queensland

    Millennium Copper & Cobalt Project - Queensland Mt Isa Inlier – World Class Minerals Province – Major Projects Located within the Mt Isa-Cloncurry copper region of NW Queensland ~19km from the Rocklands copper-cobalt processing facility  Near term high-grade copper & cobalt resource on granted mini

  9. Slide 9: Millennium Project – Graphite and the "Gap Zone"

    Millennium Project – Graphite and the “Gap Zone” Potential for significant upside ……  The Gap Zone tenement previously held by Harmony released  MBK has applied for a ML over the Gap Zone to consolidate the land holding  EPM applied for surrounding all tenure and including Gap Zone  Potential to

  10. Slide 10: In Summary....

    In Summary…. Two gold projects – multiple deposits – phased production Phase One: Whiteheads Gold Project - first production at Seven Leaders Deposit Phase Two: Livingstone Gold Project – Homestead and Winja Deposits Phase Three: Two Ladies at Whiteheads and Kingsley at Livingstone Plus: Copper, Cob

  11. Slide 11: Snapshot

    Corporate Overview – Experienced and Proven Leadership Team Tim Gilbert Mr Gilbert is a mining engineer with more than three decades of experience in a range of senior roles in the resources sector across multiple commodities, including battery and base metals, diamonds and gold. His expertise cover

  12. Slide 12: Appendix 1 – Millennium Mineral Resource Estimate – Material Factors

    Appendix 1 – Millennium Mineral Resource Estimate – Material Factors Investor Presentation – May 2026 www.metalbank.com.au | Page 12

  13. Slide 13: Thank You

    Tim Gilbert, CEO Tim@metalbank.com.au Sue-Ann Higgins, Executive Director and Company Secretary THANK YOU Sue-ann@metalbank.com.au Registered Office Metal Bank Limited Suite 506, Level 5, 50 Clarence Street, Sydney NSW 2000 Email: info@metalbank.com.au ASX Code: MBK | www.metalbank.com.au