Sika Ag · SIX:SIKA

Sika — Technical Presentation (2025)

34 slides from Sika's technical presentation, 2025

  1. Slide 1: Airport Infrastructure - The Sky is the Limit

    Airport Infrastructure - The Sky is the Limit

  2. Slide 2: Agenda

    AGENDA SIKA INFRASTRUCTURE MARKET OVERVIEW ROADSIDE APPLICATIONS AIRSIDE APPLICATIONS SIKA SOLUTIONS Q&A

  3. Slide 3: Panel

    ▪ Panel Heather Gifford Scott DiStefano Bobby Scarpitto Product Manager Director Product Regional Sales Manager Manager

  4. Slide 4: Sika Infrastructure at a Glance

    SIKA INFASTRUCTURE AT A GLANCE

  5. Slide 5: Sika Infrastructure Our Story

    SIKA INFRASTRUCTURE 2025 – Sika Infrastructure OUR STORY enhances Tunnel portfolio with the addition of King brand 2024 – Kwik Bond Polymers joins Sika infrastructure family 2017 & 2023 – Emseal and Watson Bowman Acme expansion joint solutions added to Sika portfolio 2016 – Sika creates Infrastructu

  6. Slide 6: Why Sika?

    Why ? The ultimate resource for all your project solutions Bridge Tunnel Waste Water/ Airports Transit Pedestrian Water Treatment

  7. Slide 7: Market Overview

    MARKET OVERVIEW |e | Kk BOND KING BUILDING TRUST Ds

  8. Slide 8: Assessment of America's Airport Infrastructure

    ASSESSMENT OF AMERICA’S AIRPORT INFRASTRUCTURE Source: 2025 Report Card For America’s Infrastructure ASCE's 2025 Infrastructure Report Card

  9. Slide 9: Air Traffic Demands

    AIR TRAFFIC DEMANDS Source: Federal Aviation Administration

  10. Slide 10: Capacity and Conditions

    CAPACITY AND CONDITIONS 2028 2033 11 at Capacity 14 at Capacity 13 More at Risk Source: National Plan of Integrated Airport Systems 2025-2029

  11. Slide 11: Roadside Applications

    ROADSIDE APPLICATIONS

  12. Slide 12: Phoenix Sky Harbor International Airport

    PHOENIX SKY HARBOR INTERNATIONAL AIRPORT ▪ Airport Improvement Project Arrival & Departure Elevated Roadways ▪ Completed 2024 ▪ PRODUCTS: BEJS, Wabo®SafetyFlex

  13. Slide 13: John F. Kennedy International Airport (JFK)

    JOHN F. KENNEDY INTERNATIONAL AIRPORT (JFK) ▪ Elevated Roadways ▪ On Going ▪ PRODUCTS: Wabo®StripSeal

  14. Slide 14: Minneapolis–Saint Paul International Airport

    MINNEAPOLIS–SAINT PAUL INTERNATIONAL AIRPORT ▪ Terminal 1 - Departure Lane Restoration ▪ Completed Fall 2024 ▪ PRODUCTS: Kwik Bond Polymers 204 P Seal

  15. Slide 15: Los Angeles International Airport (LAX)

    LOS ANGELES INTERNATIONAL AIRPORT (LAX) ▪ Departure Lane ▪ Completed 2016 ▪ PRODUCTS: KBP PPC 1121

  16. Slide 16: Former Springfield-Branson National Airport

    FORMER SPRINGFIELD-BRANSON NATIONAL AIRPORT ▪ WHO: Expedia HQ ▪ WHERE: Former SGF ▪ WHEN: 2024 ▪ WHY: Recoat and waterproof almost 15- year-old joints and even older facade ▪ PRODUCTS: SikaThorocoat 400 DOT, Sikaflex 2C EZ-Mix

  17. Slide 17: Former Springfield-Branson National Airport

    FORMER SPRINGFIELD-BRANSON NATIONAL AIRPORT ▪ Mock up was done on coating which which was used around exterior ▪ 2C EZ-Mix was used inside and out.

  18. Slide 18: Palomar Airport Road Bridge

    PALOMAR AIRPORT ROAD BRIDGE ▪ WHO: McClellan-Palomar Airport ▪ WHERE: San Diego, CA ▪ WHEN: 2009 ▪ WHY: Major concrete deterioration over major airport thoroughfare ▪ PRODUCTS: Sikadur 31, Sikadur 35, SikaFlex 1a, SikaTop 123 PLUS, Sika Armatec 100 EpoCem, SikaFerrogard Anodes, SikaTop Seal 107

  19. Slide 19: Palomar Airport Road Bridge

    PALOMAR AIRPORT ROAD BRIDGE

  20. Slide 20: Airside Applications

    AIRSIDE APPLICATIONS

  21. Slide 21: Indianapolis International Airport

    INDIANAPOLIS INTERNATIONAL AIRPORT ▪ North Runway Restoration ▪ On Going ▪ WaboCrete II Gray

  22. Slide 22: Denver International Airport (DEN)

    DENVER INTERNATIONAL AIRPORT (DEN) ▪ Airport Roadways – partial airfield & terminal traffic ▪ On Going ▪ PRODUCTS: ▪ WaboTransFlex

  23. Slide 23: Denver International Airport (DEN)

    DENVER INTERNATIONAL AIRPORT (DEN) ▪ Roadside and Airside ▪ 2018/2019 ▪ PRODUCTS: KBP 204 Pseal

  24. Slide 24: San Francisco – Dreamline – KBP

    SAN FRANSICO – DREAMLINE – KBP ▪ Airside Parking ▪ Completed 2020 ▪ PRODUCTS: KBP PPC 1121

  25. Slide 25: Coast Guard Air Station – Sacramento CA

    COAST GUARD AIR STATION – SACRAMENTO CA ▪ Airside Parking and Tarmac ▪ Completed 2019 ▪ PRODUCTS: KBP PPC 1121

  26. Slide 26: LaGuardia Airport Runway New York City

    LAGUARDIA AIRPORT RUNWAY NEW YORK CITY ▪ WHO: Laguardia International Airport ▪ WHERE: New York ▪ WHEN: 2005 ▪ WHY: Added electrical & touchdown lighting to original 1960’s runway extension. ▪ PRODUCTS: Sika Carbodur & Sikadur 30

  27. Slide 27: Krakow International Airport

    KRAKOW INTERNATIONAL AIRPORT ▪ WHO: Krakow International Airport ▪ WHERE: Krakow, Poland ▪ WHEN: 2006-2009 ▪ WHY: New joint/crack repair system was being tested against existing standard bituminous system ▪ PRODUCTS: Sika Icosit KC 340/45

  28. Slide 28: Krakow International Airport

    KRAKOW INTERNATIONAL AIRPORT

  29. Slide 29: Sika Airport Solutions

    SIKA AIRPORT SOLUTIONS ® BUILDING TRUST ri

  30. Slide 30: Sika Full Range Systems for Airports

    SIKA FULL RANGE SYSTEMS FOR AIRPORTS Terminal buildings >> Terminal buildings >> Airside aprons, taxy-ways, aircraft stands, Air traffic control tower, etc. >> Air traffic control tower >> Baggage handling, cargo and back of house areas >> Hangars and maintenance buildings >> Carpark and passenger t

  31. Slide 31: Who Has the First Question?

    WHO HAS THE FIRST QUESTION?

  32. Slide 32: Supporting Slides – To Be Deleted

    SUPPORTING SLIDES – TO BE DELETED

  33. Slide 33: MSP Terminal

    MSP TERMINAL 1 This project was completed in September/October 2024. The passenger side of the airport (departure lanes) was coated with KBP 204 Pseal as part of a restoration project. This project also included joints (unsure if they were Watson Bowman). The contractor was Lunda and the Pseal porti

  34. Slide 34: Building Trust

    BUILDING TRUST

Sika — Technical Presentation (2025) on 6ix