Slide 1: Airport Infrastructure - The Sky is the Limit
Airport Infrastructure - The Sky is the Limit
Slide 2: Agenda
AGENDA SIKA INFRASTRUCTURE MARKET OVERVIEW ROADSIDE APPLICATIONS AIRSIDE APPLICATIONS SIKA SOLUTIONS Q&A
Slide 3: Panel
▪ Panel Heather Gifford Scott DiStefano Bobby Scarpitto Product Manager Director Product Regional Sales Manager Manager
Slide 4: Sika Infrastructure at a Glance
SIKA INFASTRUCTURE AT A GLANCE
Slide 5: Sika Infrastructure Our Story
SIKA INFRASTRUCTURE 2025 – Sika Infrastructure OUR STORY enhances Tunnel portfolio with the addition of King brand 2024 – Kwik Bond Polymers joins Sika infrastructure family 2017 & 2023 – Emseal and Watson Bowman Acme expansion joint solutions added to Sika portfolio 2016 – Sika creates Infrastructu
Slide 6: Why Sika?
Why ? The ultimate resource for all your project solutions Bridge Tunnel Waste Water/ Airports Transit Pedestrian Water Treatment
Slide 7: Market Overview
MARKET OVERVIEW |e | Kk BOND KING BUILDING TRUST Ds
Slide 8: Assessment of America's Airport Infrastructure
ASSESSMENT OF AMERICA’S AIRPORT INFRASTRUCTURE Source: 2025 Report Card For America’s Infrastructure ASCE's 2025 Infrastructure Report Card
Slide 9: Air Traffic Demands
AIR TRAFFIC DEMANDS Source: Federal Aviation Administration
Slide 10: Capacity and Conditions
CAPACITY AND CONDITIONS 2028 2033 11 at Capacity 14 at Capacity 13 More at Risk Source: National Plan of Integrated Airport Systems 2025-2029
Slide 11: Roadside Applications
ROADSIDE APPLICATIONS
Slide 12: Phoenix Sky Harbor International Airport
PHOENIX SKY HARBOR INTERNATIONAL AIRPORT ▪ Airport Improvement Project Arrival & Departure Elevated Roadways ▪ Completed 2024 ▪ PRODUCTS: BEJS, Wabo®SafetyFlex
Slide 13: John F. Kennedy International Airport (JFK)
JOHN F. KENNEDY INTERNATIONAL AIRPORT (JFK) ▪ Elevated Roadways ▪ On Going ▪ PRODUCTS: Wabo®StripSeal
Slide 14: Minneapolis–Saint Paul International Airport
MINNEAPOLIS–SAINT PAUL INTERNATIONAL AIRPORT ▪ Terminal 1 - Departure Lane Restoration ▪ Completed Fall 2024 ▪ PRODUCTS: Kwik Bond Polymers 204 P Seal
Slide 15: Los Angeles International Airport (LAX)
LOS ANGELES INTERNATIONAL AIRPORT (LAX) ▪ Departure Lane ▪ Completed 2016 ▪ PRODUCTS: KBP PPC 1121
Slide 16: Former Springfield-Branson National Airport
FORMER SPRINGFIELD-BRANSON NATIONAL AIRPORT ▪ WHO: Expedia HQ ▪ WHERE: Former SGF ▪ WHEN: 2024 ▪ WHY: Recoat and waterproof almost 15- year-old joints and even older facade ▪ PRODUCTS: SikaThorocoat 400 DOT, Sikaflex 2C EZ-Mix
Slide 17: Former Springfield-Branson National Airport
FORMER SPRINGFIELD-BRANSON NATIONAL AIRPORT ▪ Mock up was done on coating which which was used around exterior ▪ 2C EZ-Mix was used inside and out.
Slide 18: Palomar Airport Road Bridge
PALOMAR AIRPORT ROAD BRIDGE ▪ WHO: McClellan-Palomar Airport ▪ WHERE: San Diego, CA ▪ WHEN: 2009 ▪ WHY: Major concrete deterioration over major airport thoroughfare ▪ PRODUCTS: Sikadur 31, Sikadur 35, SikaFlex 1a, SikaTop 123 PLUS, Sika Armatec 100 EpoCem, SikaFerrogard Anodes, SikaTop Seal 107
Slide 19: Palomar Airport Road Bridge
PALOMAR AIRPORT ROAD BRIDGE
Slide 20: Airside Applications
AIRSIDE APPLICATIONS
Slide 21: Indianapolis International Airport
INDIANAPOLIS INTERNATIONAL AIRPORT ▪ North Runway Restoration ▪ On Going ▪ WaboCrete II Gray
Slide 22: Denver International Airport (DEN)
DENVER INTERNATIONAL AIRPORT (DEN) ▪ Airport Roadways – partial airfield & terminal traffic ▪ On Going ▪ PRODUCTS: ▪ WaboTransFlex
Slide 23: Denver International Airport (DEN)
DENVER INTERNATIONAL AIRPORT (DEN) ▪ Roadside and Airside ▪ 2018/2019 ▪ PRODUCTS: KBP 204 Pseal
Slide 24: San Francisco – Dreamline – KBP
SAN FRANSICO – DREAMLINE – KBP ▪ Airside Parking ▪ Completed 2020 ▪ PRODUCTS: KBP PPC 1121
Slide 25: Coast Guard Air Station – Sacramento CA
COAST GUARD AIR STATION – SACRAMENTO CA ▪ Airside Parking and Tarmac ▪ Completed 2019 ▪ PRODUCTS: KBP PPC 1121
Slide 26: LaGuardia Airport Runway New York City
LAGUARDIA AIRPORT RUNWAY NEW YORK CITY ▪ WHO: Laguardia International Airport ▪ WHERE: New York ▪ WHEN: 2005 ▪ WHY: Added electrical & touchdown lighting to original 1960’s runway extension. ▪ PRODUCTS: Sika Carbodur & Sikadur 30
Slide 27: Krakow International Airport
KRAKOW INTERNATIONAL AIRPORT ▪ WHO: Krakow International Airport ▪ WHERE: Krakow, Poland ▪ WHEN: 2006-2009 ▪ WHY: New joint/crack repair system was being tested against existing standard bituminous system ▪ PRODUCTS: Sika Icosit KC 340/45
Slide 28: Krakow International Airport
KRAKOW INTERNATIONAL AIRPORT
Slide 29: Sika Airport Solutions
SIKA AIRPORT SOLUTIONS ® BUILDING TRUST ri
Slide 30: Sika Full Range Systems for Airports
SIKA FULL RANGE SYSTEMS FOR AIRPORTS Terminal buildings >> Terminal buildings >> Airside aprons, taxy-ways, aircraft stands, Air traffic control tower, etc. >> Air traffic control tower >> Baggage handling, cargo and back of house areas >> Hangars and maintenance buildings >> Carpark and passenger t
Slide 31: Who Has the First Question?
WHO HAS THE FIRST QUESTION?
Slide 32: Supporting Slides – To Be Deleted
SUPPORTING SLIDES – TO BE DELETED
Slide 33: MSP Terminal
MSP TERMINAL 1 This project was completed in September/October 2024. The passenger side of the airport (departure lanes) was coated with KBP 204 Pseal as part of a restoration project. This project also included joints (unsure if they were Watson Bowman). The contractor was Lunda and the Pseal porti
Slide 34: Building Trust
BUILDING TRUST