Chalice Mining Limited · ASX:CHN

Chalice Mining — Chalice Gold Mines — Mining Indaba 2013

15 slides from Chalice Mining's conference presentation, Feb 6, 2013

  1. Slide 1: Cashed up for growth and opportunity

    For personal use only Cashed up for growth and opportunity • Cash: substantial war-chest with A$52M cash • Today’s T d ’ exploration l ti upside: id Large VMS system discovered in Eritrea – drilling resuming February 2013 • Tomorrow’s potential: Seeking advanced projects February 2013 Slide: 1

  2. Slide 2: Disclaimer and Competent Person's Statement

    Disclaimer and Competent Person’s Statement This presentation does not include all available Information on Chalice Gold Mines Limited and should not be used in isolation as a guide to investing in the Company. For personal use only Any potential investor should also refer to Chalice Gold Mines Limi

  3. Slide 3: Chalice Snapshot

    Chalice Snapshot A new chapter opens following last year’s successful sale of Eritrean gold asset for $114M For personal use only Capital Structure: Share Price ~A$0.18 Shares on Issue 250 million Market Capitalisation ~A$45 million (@ 18cps) Options on Issue 5 million D bt Debt - Cash ~A$52 million

  4. Slide 4: Current Regional Focus: the Arabian-Nubian Shield

    Current Regional Focus: the Arabian-Nubian Shield Strong strategic foothold in one of the world’s exploration “hot spots” For personal use only • Long mining history (possibly as much as 100Moz historical gold production) • Minimal modern exploration • World-class projects now being developed Slide:

  5. Slide 5: Current Ground Position – Eritrea

    Current Ground Position – Eritrea Mogoraib North tenement encompasses outstanding exploration potential… For personal use only Zara Gold Project divested to China SFECO Group and ENAMCO in 2012 for combined proceeds of $114M lleaving $114M, i ChChalice li with ith the th highly hi hl prospective ti

  6. Slide 6: Mogoraib North: On the Doorstep of a Giant

    Mogoraib North: On the Doorstep of a Giant 550 sq km tenement secured in early 2011 – immediately north of Bisha Mine For personal use only BISHA VMS MINE 2011 production: 379koz gold, copper expansion under construction 12 years of reserves, one of highest grade open pit mines in the world Slide: 6

  7. Slide 7: Mogoraib North: On the Doorstep of a Giant

    Mogoraib North: On the Doorstep of a Giant On the doorstep of one of the world’s premier new VMS mines For personal use only Slide: 7

  8. Slide 8: VMS Geological Model

    VMS Geological Model VMS deposits are created by volcanic-associated hydrothermal events in submarine environments For personal use only • VMS deposits d it are a major j source off global l b l copper, zinc, i lleadd and gold production • They are created by sea-floor hydrothermal processes associa

  9. Slide 9: Mogoraib North: A New VMS System

    Mogoraib North: A New VMS System A highly prospective project which has recently delivered a new discovery for Chalice For personal use only • 550 sq km tenement 10km north of Bisha deposit p • Volcanogenic Massive Sulphide (VMS) ‘horizons’ trend north under transported cover into CHN ground • Numer

  10. Slide 10: Systematic Exploration and Persistence Pays Off

    Systematic Exploration and Persistence Pays Off Sulphides intersected in 20th EM target to be drilled after lots of black shales! For personal use only • 30 priority conductor plates selected from >200 EM targets identified from initial interpretation of VTEM • VTEM targets further screened and prio

  11. Slide 11: Mogoraib River Discovery

    Mogoraib River Discovery A virgin discovery beneath shallow transported cover For personal use only • Disseminated, stringer & massive to semi- massive sulphides intersected in wide-spaced h l over 6k holes 6km • MOGD-00021 – Zn & Cu-rich sulphide intersection: • 145-150m: 5m @ 0.86% Cu, 1.33% Zn, 0

  12. Slide 12: Down-hole & Ground EM: Deep Conductor at T209

    Down-hole & Ground EM: Deep Conductor at T209 For personal use only Slide: 12

  13. Slide 13: Business Development Focus

    Business Development Focus Capacity to secure quality new opportunities with potential to add significant value • Aiming to put proceeds of Zara sale to work For personal use only • Looking for advanced or development stage opportunities with growth potential • Preference for gold or gold gold-coppe

  14. Slide 14: Summary: A New Chapter Begins

    Summary: A New Chapter Begins Cash, Exploration Upside, Opportunity For personal use only • Well funded junior explorer/developer • ~A$52 million cash from sale of Zara Project • Potential emerging large-scale VHMS di discovery att Mogoraib M ib N North th • Hunt for new opportunities pp underwayy •

  15. Slide 15: Summary: A New Chapter Begins

    Summary: A New Chapter Begins Cash, Exploration Potential, Opportunity For personal use only AUSTRALIA Bell Potter Trent Allen E: tcallen@bellpotter.com.au T: +612 9231 0880 Paterson Securities Limited Simon Tonkin E: STonkin@psl.com.au T: +618 9225 2816 Blackswan Securities Mark Savich E: msavich@b

Chalice Gold Mines — Mining Indaba 2013 on 6ix