Cap S.a. · BCS:CAP

Cap — Deutsche Bank 4th Annual Chile Conference (May 2014)

42 slides from Cap's conference presentation, May 2014

  1. Slide 1: CAP Group Update - Deutsche Bank 4th Annual Chile Conference

    CAP GROUP UPDATE Deutsche Bank 4th Annual Chile Conference Fernando Reitich President & CEO Raúl Gamonal CFO London - May 2014

  2. Slide 2: Agenda

    Agenda 1

  3. Slide 3: Ownership structure

    Ownership structure Mitsubishi Pension Invercap Other Corporation Funds 19,3% 8,7% 31,3% 40,7% 47,32% 52,68% 75,0% 99,9% 25,0% Compañía Minera Compañía Siderúrgica Novacero del Pacífico Huachipato 50,93% 30,56% 11,03% Cintac 57,79% Intasa Iron Ore Mining Steel Production Steel Processing Source: CAP

  4. Slide 4: Integrated Operations

    Integrated Operations Integrated operations Mining Steel Steel Processing • Production capacity: 15 • Production: 0.7 Mt/y • Production capacity:400 Mt/y • Nominal capacity: 1.45 kt/y • Only large-scale iron ore Mt/y • Leading steel processor producer in Chile • Focus on grinding in Chile • On track

  5. Slide 5: Iron ore mining - Cerro Negro Norte Mine

    Iron ore mining Cerro Negro Norte Mine 4

  6. Slide 6: Mining sites

    Mining sites Mining sites El Laco Punta Totoralillo Port CAP Mining has three Cerro Negro Norte different areas of operation Desalination Plant Copiapó in the north of Chile, Magnetite Plant located around the cities of: • La Serena • Vallenar • Copiapó Los Colorados Guacolda II Port Cities Vallenar

  7. Slide 7: Mining products

    Mining products BF and DR Pellets (Fe 65% - 66%) Lumps (Fe 62%) Pellet Feed (Fe 67% - 68%) Fines (Fe 62%) 6

  8. Slide 8: Los Colorados Mine

    Los Colorados Mine 7

  9. Slide 9: Mining property

    Mining property Ranking 2012 Hectares in exploration concessions - Chile N° Company Hectares % 1 BHP Chile Inc. 2,219,500 12.38 2 Codelco 969,400 5.41 3 Antofagasta Minerals S.A. 736,800 4.11 4 Teck Exploraciones Mineras Chile Ltda. 728,600 4.07 5 CAP 609,400 3.4 Ranking 2012 Hectares in exploitatio

  10. Slide 10: Resources and reserves of magnetite ore

    Resources and reserves of magnetite ore As a result of continued successful exploration campaigns, iron ore resources have increased progressively over the years, reaching 6,350 million tons in 2013 Total Mineral Resources Mine / Deposit Reserves (2) (1) Mine Location Ton Grade (% Fe) Ton Grade (% F

  11. Slide 11: Mining shipments and markets

    Mining shipments and markets Shipments 14.000 12.246 12,086 12.000 11.469 10.145 10.213 10.000 8.000 7.251 Th. MT 6.000 4.000 2.000 0 2008 2009 2010 2011 2012 2013 Shipments by markets and products (CY 2013) Self - fluxing DR H&L Lumps; 8% pellets; 14% Indonesia; pellets; 4% Sinter feed; 8% Bahrein;

  12. Slide 12: Cash cost curve

    Cash cost curve Global production cost • CAP Mining is a low cost producer of high grade magnetite concentrate • Mine depletion will lead to higher demand for high grade pellet feed • Environmental and economic constraints support the increased need for magnetite concentrate Pellet feed global produ

  13. Slide 13: Magnetite pellet feed production 2013

    Magnetite pellet feed production 2013 Country Market Production (Mt) Australia Seaborne 11 Canada Seaborne 14 Chile Seaborne 6 China Domestic 83 Kazakhstan Domestic 8 Mauritania Seaborne 3 Peru Seaborne 5 USA Domestic 1 Total 132 Magnetic pellet feed global production cost Source: CAP Minería 12

  14. Slide 14: Steel

    Steel

  15. Slide 15: Steel focus on long products only

    Steel focus on long products only • Reorganization of the plant to produce 700 kt/y, operating with only one blast furnace • Strong adjustment in its industrial processes and workforce • Long products demand underpinned by domestic construction and mining sectors CAP Acero Shipments and prices Talca

  16. Slide 16: Steel processing

    Steel processing 15

  17. Slide 17: Steel processing

    Steel processing • Main flat steel importer of the Pacific coast of South America • Creates value-added solutions for the construction, industry and infrastructure sectors in Chile, Peru and Argentina • Chile is LATAM´s most intensive user of steel in construction Shipments and prices Sales by Secto

  18. Slide 18: Agenda

    Agenda 17

  19. Slide 19: Short-term growth in China

    SteelShort-term Processing growth Short-term – Key considerations growth in in China China • GDP growth reached 7.7% in year 2013 • Growth lead by domestic demand should continue, even though fixed assets investment slows • This divergent development will continue in 2014 Expected 7.5% YoY GDP growt

  20. Slide 20: Demands of the Chinese urbanization and development process

    Demands of the Chinese urbanization and development process Taller buildings… More cars… Expressway construction investment Urban rail transit construction Source: Citi, April 2014 19 19

  21. Slide 21: Iron ore quality evolution

    Iron ore Iron ore quality evolution evolution • Crude iron ore grade is dropping • Mine depletion will lead to higher demand for high grade concentrates Production from Magnetite key CISA Chinese iron ore producers (Mt) concentrate 70 68 Average grade of hematite fines 66 (Pilbara, Australia) 64 62

  22. Slide 22: Preference for higher quality iron ore

    Preference for Preference for higher higherquality qualityiron ironore ore Relative price performance of ores of different grades SOURCE: Macquarie, commodities research 21

  23. Slide 23: Global steel demand growth

    Global steel demand growth • Global apparent finished steel demand will grow from 1.5 bn tons in 2014 to 1.7 bn tons by 2018 (implied 3% CAGR) (1) Other Developing includes CIS, MENA, Sub-Saharan Africa, Latin America, India, and Other Asia SOURCE: WSA; McKinsey Steel Demand Model Oliver Ramsbottom,

  24. Slide 24: Global steel capacity utilization

    Global Globalsteel capacity steel utilization capacity utilization • Nevertheless, world capacity utilization has been below 80% for the last 5 years, thereby practically destroying the margins of the steel production industry • Most of the excess capacity is concentrated in China. Current efforts t

  25. Slide 25: Agenda

    Agenda 24

  26. Slide 26: CAP – Financial evolution

    CAP – Financial evolution USD Million 2008 2009 2010 2011 2012 2013 Sales 1.972 1.375 1.994 2.787 2.470 2.297 EBITDA 534 128 740 1.184 764 708 EBITDA Margin 27,1% 9,3% 37,1% 42,5% 30,9% 30,8% Net Income 291 25 590 442 234 184(1) Cash 379 393 981 883 711 309 Gross Financial debt 880 907 1.001 628 719

  27. Slide 27: EBITDA contribution by business

    EBITDA contribution by business 100% 97% 98% 94% 94% 80% 77% 60% 40% 18% 20% 6% 6% 8% 5% 4% 0% 0% 2009 2010 2011 2012 2013 -3% -2% -2% -20% Iron Steel Steel Processing (1) EBITDA: Gross Margin – S&AE + Depreciation and Amortization + Dividends received in cash, over the last twelve months 26

  28. Slide 28: Agenda

    Agenda Agenda 27

  29. Slide 29: Mining future prospects

    Mining future prospects El Laco Punta Totoralillo Port Project Production Est. Capex Mt MUS$ Cerro Negro Norte Desalination Plant Copiapó Magnetite Plant 1 PF 110 Magnetite Plant Expansion 6,5 PF 1,700 Tofo 13,5 PF 2,900 6 PF 1,600 Alcaparra 135 Kt Conc-Cu 300 Los Colorados Los Colorados 4 SF 500 Gu

  30. Slide 30: El Tofo

    El Tofo Investment (E) : 1,700 – 2,900 MUS$ • Greenfield Production: 6.5-13,5 Mt/y of pellet feed Stage: Conceptual engineering Volume Fe Resources [Mt] [%] Measured 946 25.5 Indicated 455 23.4 Inferred 190 22.5 Total 1,591 24.5 0 200 400 m 29

  31. Slide 31: Alcaparra iron/copper

    Alcaparra iron/copper Iron ore body Investment (E): 1,600 + 300 MUS$ Production: 6 Mt/y of pellet feed Simbology Topography 135 kt/y of copper concentrate Drilling Fe% ≥ 45 Stage: Advanced exploration 25 ≥ Fe% < 45 Exploratory metallurgy 15 ≥ Fe% < 25 10 ≥ Fe% < 15 Núcleos Estéril Volume Fe/Cu Iron

  32. Slide 32: Los Colorados expansion

    Los Colorados expansion Investment : 500 MUS$ • Brownfield Production: 4 Mt/y of fines Stage: Basic engineering Resources Volume Fe 2012 [Mt] [%] Measured 694 31.5 Actual final pit Indicated 343 31.4 Inferred 100 33.9 SIMBOLOGY Actual level TOTAL 1,137 31.7 Final pit Final pit 2008 with expansion Fi

  33. Slide 33: Sustainable mining operations

    Sustainable mining operations Totoralillo Port Desalination Plant Phase 3 under discussion S/S Totoralillo with Pucobre: up to 130 l/s S/S CNN CNN Photovoltaic Plant Amanecer Solar CAP CNN Aqueduct 120 lt/s CAP transmission line Copiapó Cardones node Tierra Amarilla Aqueduct Caserones 170 lt/s Magne

  34. Slide 34: Desalination plant

    Desalination plant cAP

  35. Slide 35: Ports

    Ports Total capacity CAP ports: 34.8 Mt/y Punta Totoralillo: Guayacán: • 29 km north of Caldera • Herradura bay, Coquimbo • Iron ore shipping • Iron ore shipping • 200,000 dwt • 165,000 dwt • Max capacity: 12 million t/y • Max capacity: 6 million t/y • Efective utilization: 4.5 million t/y • Efectiv

  36. Slide 36: Ports – Services to third parties

    Ports– Services to third parties CAP Mining Totoralillo Port • Third-party iron ore loading and storage capacity at Totoralillo port is 3 Mt/y • Loaded tonnages: 2 Mt in 2013 and 2,5 Mt in 2014 • EBITDA generation: MUS$20 in 2013 and MUS$22 in 2014 • With the addition of 1 Mt/y of copper loading ser

  37. Slide 37: Solar energy

    Solar energy Totoralillo Port Desalination Plant S/S Totoralillo S/S CNN CNN Photovoltaic Plant Amanecer Solar CAP CNN Aqueduct 120 lt/s CAP transmission line Copiapó Cardones node Tierra Amarilla Aqueduct Caserones 170 lt/s Magnetite Plant 80 lt/s 36

  38. Slide 38: Solar energy

    Solar energy • 100 MW Photovoltaic power plant fully committed to CAP (PPA) • Located nearby CNN Mine • CAP retains call option for up to 40% of the equity • Financial hedge • Compliance with NCRE law • Connected to a 142 km long 220 kv transmission line owned by CAP General view of the “Amanecer So

  39. Slide 39: Agenda

    Agenda Agenda 38

  40. Slide 40: Summary

    Summary • CAP Mining • On track for expansion of 50% production capacity to 18 Mt/y • Ample portfolio of future prospects based on abundant reserves; further expansion to be defined in 2014 • Global environmental and economic constraints support the growing need for CAP´s magnetite concentrate • CAP

  41. Slide 41: Final remarks

    Final remarks • CAP is advancing through sustainable development based on competitive advantages • Concurrently, cost reduction initiatives and productivity improvements will be at the center of management efforts • CAP Mining: operational improvements • CAP Steel: optimize raw materials and energy

  42. Slide 42: CAP Group Update - Deutsche Bank 4th Annual Chile Conference

    CAP GROUP UPDATE Deutsche Bank 4th Annual Chile Conference Fernando Reitich President & CEO Raúl Gamonal CFO London - May 2014

CAP — Deutsche Bank 4th Annual Chile Conference (May 2014) on 6ix