Slide 1: Redlings REE Project & ORNL NEAREST Technology Partnership
Redlings REE Project & ORNL NEAREST Technology Partnership Combining a World-Class Australian REE Deposit with DOE-Backed Processing Technology 11Mt REE Tech ORNL Inferred Resource NEAREST* REE separation Department of Energy (DOE) 1,130 ppm TREO technology National Lab Partner Marquee Resources Lim
Slide 2: Important Notice and Disclaimer
Important Notice and Disclaimer This presentation has been prepared by Marquee Resources Limited (Marquee or the Company). It contains general information about the Company’s activities current as at the date of the presentation. The information is provided in summary form and does not purport to be
Slide 3: Transaction Overview
Transaction Overview Marquee R esources executes landmark patent licence agreement with Oak R idge National Laboratory. Marquee Resources Limited (ASX: MQR) has executed a Non-exclusive Research and Development Patent License and Option Agreement (PLA- 2166) with UT-Battelle, LLC — the managing enti
Slide 4: About Oak Ridge National Laboratory
About Oak Ridge National Laboratory The U.S . Department of E nergy's largest science and energy national laboratory ORNL AT A GLANCE Why ORNL Matters A select group of organisations globally hold formal patent licence agreements with this flagship DOE institution. US$2B+ Annual Research Budget • Wo
Slide 5: NEAREST Technology
NEAREST Technology Nonaqueous E xtraction and R ecovery of E lements by Aqueous -free S eparation Technology ASX: MQR NEAREST1 is a breakthrough DOE-funded REE separation technology — unlike conventional aqueous solvent extraction, NEAREST uses a non- aqueous approach to selectively extract and sepa
Slide 6: Redlings REE Project
Redlings REE Project 1 00%-owned by Marquee R esources | ~40km west of Leonora, Western Australia 204 – 306Mt at 950 11Mt 1,130 ppm 12,430t – 1,130 ppm TREO Inferred Resource Contained REO TREO Grade @ 800ppm TREO cut-off Global Exploration Target* Significant Maiden Resource Exceptional Growth Pote
Slide 7: Redlings REE Project
Redlings REE Project 1 00%-owned by Marquee R esources | ~40km west of Leonora, Western Australia Scale of Opportunity The Future for the Redlings REE Project Infill Drilling • 160×160m shallow drill grid program to ‘link’ existing prospects. 1 • 693 SLRC holes / ~13,860m. • Links all 5 existing pro
Slide 8: Project Geology & Location
Project Geology & Location Northern E astern Goldfields, Western Australia | Tier 1 Mining J urisdiction Geological Setting LOCATION DETAILS • Northern Eastern Goldfields, WA — granitic rocks between Mt Ida and Norseman-Wiluna Greenstone Belts. Location • REE hosted in carbonatite dykes within an NN
Slide 9: Why Rare Earths – Why Now
Why Rare Earths – Why Now 1 00%-owned by Marquee R esources | ~40km west of Leonora, Western Australia EV Revolution Wind Energy Supply Chain Diversification • Permanent magnet motors require Nd-Pr • China controls ~85% of global REE • Direct-drive wind turbines use ~600kg of alloys. processing. REE
Slide 10: Project + Technology: A Compelling Alignment
Project + Technology: A Compelling Alignment NE AR E S T addresses the specific processing challenges posed by R edlings' clay-rich laterite mineralisation REDLINGS PROJECT NEAREST TECHNOLOGY MRE: 11Mt @ 1,130 ppm TREO – JORC Inferred. Developer: Oak Ridge National Laboratory (ORNL) / DOE Exploratio
Slide 11: Development Roadmap & Next Steps
Development Roadmap & Next Steps Advancing Redlings toward production with NE ARE S T technology integration NOW Q2–Q3 Q4 2026 2026–27 2027+ April 2026 2026 ★ • Maiden MRE Declared: • Commence R&D with • Updated Mineral • Full metallurgical test • Scoping / Pre-Feasibility 11Mt @ 1,130ppm TREO ORNL
Slide 12: The Investment Case
The Investment MARQUEE RESOURCES LIMITED Case • 11Mt JORC 2012 Inferred Resource with 13× growth potential (306Mt Upper Exploration Target). • Magnetic REE dominant— aligned with EV, wind & defence demand. • Executed patent licence with ORNL — DOE-backed NEAREST technology access. • NEAREST designed
Slide 13: Appendix A - Mineral Resource Estimate
Appendix A - Mineral Resource Estimate J OR C 201 2 – Inferred | Independent E stimation: Matrix R esource Consultants ASX: MQR Resource by Cut-Off Grade Cut-off (ppm TREO) Tonnes (Mt) TREO (ppm) MREO (ppm) Contained TREO (t) Contained MREO (t) 500 33 780 143 25,740 4,719 600 22 900 169 19,800 3,716
Slide 14: Thank You
THANK YOU info@marqueeresources.com.au 22 Townshend Road Subiaco WA 6008 +61 08 9388 0051 www.marqueeresources.com.au