  1. Slide 1: Cleveland Province: Targeting 2016 Start Up for Cleveland Tailings Project

    elementos.com.au For personal use only Cleveland Province Targeting 2016 Start Up for Cleveland Tailings Project November 2014

  2. Slide 2: Introduction

    Introduction elementos.com.au For personal use only Board of Directors: Calvin Treacy (MD) Richard Seville (NED) Cory Nolan (NED) Management: Tim McManus (COO) Linda Scott (CFO & Company Secretary) Gustavo Delendatti (Geologist) SHARES* CASH* MARKET CAP 758M $1.6M $5.3M *As at 30 September 2014 2

  3. Slide 3: Getting Exposure to Tin

    Getting Exposure to Tin elementos.com.au For personal use only • Buy physical tin – Logistically difficult • Invest in an existing producer – There are very few listed pure play tin producers globally • Invest in Elementos – The value of Elementos is strongly leveraged to tin price 3

  4. Slide 4: Elementos has the Right Ingredients

    Elementos has the Right Ingredients elementos.com.au For personal use only Elementos has the People Project • Skilled, experienced Capital and committed board • Focused management team People Elementos has the Projects • No sovereign risk • Staged development • Stage 1 has the lowest Successful capi

  5. Slide 5: Elementos has all the Boxes Ticked

    Elementos has all the Boxes Ticked elementos.com.au For personal use only Significant mineral province þ World class project infrastructure þ Multiple assets with clear development pathways þ Experienced management team þ Access to a high growth market þ In place port and market access þ Gover

  6. Slide 6: Strategy

    Strategy elementos.com.au For personal use only Building a strong company on five strategies • Internal capability • Project capital costs that are fundable in the current market • Innovation and excellence in mining and development • Strategic relationships • Geographic and commodity focus 6

  7. Slide 7: Cleveland Province

    Cleveland Province elementos.com.au For personal use only Four projects across 96 square kilometres of contiguous tenure: • Tailings Project - Rehabilitation by reprocessing of a tin and copper resource • Open Pit Project – Potential integration of known surface mineralisation into the tailings proj

  8. Slide 8: Project Pipeline

    Project Pipeline elementos.com.au For personal use only Company building project pipeline with creditable projects developing along a clear timeline MINIMAL CAPEX TO FIRST PRODUCTION Underground Tailings Redevelopment Open Pit Foley Caving 2016 2018 2017 2020 SUSTAINABLE PRODUCTION Near Mine Explora

  9. Slide 9: Infrastructure – We have it

    Infrastructure – We have it elementos.com.au For personal use only PORT 60km north-east at Burnie ACCESS Sealed road access to ROADS Burnie SITE ≈10km of roads in good ROADS condition LABOUR Skilled mining labour in the region POWER Transmission and distribution lines run through province WATER Ampl

  10. Slide 10: Pathway to First Cashflow – Tailings

    Pathway to First Cashflow – Tailings elementos.com.au For personal use only Production Funding Partnering Studies Testwork 10

  11. Slide 11: Tailings Overview

    Tailings Overview elementos.com.au For personal use only JORC Resource# Low Capex 3,850kt at 0.30% Sn 0.13% Cu Indicated Mineral Resource Next steps are: Cleveland Project Short Lead Time to Environmental Approval Production Mining Lease Sn and Cu Metallurgical Testing Development Positive 2015 Envi

  12. Slide 12: About Cleveland Underground

    About Cleveland Underground elementos.com.au For personal use only • 100% owned • Brownfield • Less than half the known Cleveland Underground mineralisation was mined Operation • 68% Indicated Mineral Resource • $10 million worth of drilling • $25 million worth of development in place (roads and dec

  13. Slide 13: Underground Overview

    Underground Overview elementos.com.au For personal use only JORC Resource# JORC Resource# 5.0 Million tonnes 2.4 Million Tonnes @ 0.69% Sn, 0.28% Cu Indicated @ 0.56% Sn, 0.19% Cu Inferred Mineral Resource (0.35% cutoff) Mineral Resource (0.35% cutoff) Cleveland Project Mine Infrastructure in Brownf

  14. Slide 14: Geology

    Geology elementos.com.au The tin-copper mineralisation occurs as stratiform lenses within a series of sedimentary rocks. These sedimentary For personal use only rocks are of Cambrian age and, while they were originally deposited horizontally, they have been tilted and are now more or less vertical.

  15. Slide 15: JORC Mineral Resources Summary

    JORC Mineral Resources Summary* elementos.com.au For personal use only Cleveland Tin and Copper Tailings Mineral Resource -17 June 2014 0% Sn Cut-Off % Sn as Copper Metal Category Tonnage Tin Metal (tonnes) % Cu Cassiterite (tonnes) Indicated 3,850,000 0.30 11,500 0.13 5,000 Total 3,850,000 0.30 11,

  16. Slide 16: The Road Ahead

    The Road Ahead elementos.com.au For personal use only Tin fundamentals remain strong, however, access to development capital is currently the biggest hurdle for junior miners • The Cleveland projects have a pathway to production • Elementos is set to leverage infrastructure in the Cleveland Province

  17. Slide 17: Disclaimer and Compliance Statement

    Disclaimer and Compliance Statement elementos.com.au For personal use only Forward Looking Statements This presentation may contain certain forward looking statements. Such statements are only predictions, based on certain assumptions and involve known and unknown risks, uncertainties and other fact

  18. Slide 18: For personal use only

    elementos.com.au For personal use only Level 8 - 26 Wharf Street Brisbane, QLD, Australia +617 3221 7770 ASX: ELT For further enquiries please contact: Calvin Treacy – Managing Director email: admin@elementos.com.au www.elementos.com.au